If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0194261510000 | | Well ID: 0194261510000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 50.610634, -113.521721 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/10-15-019-26W4/0 | | Location: 00/10-15-019-26W4/0 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/10-15-019-26 W4/00 | | Location Alias 2: 00/10-15-019-26 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
|- | |- | ||
− | | County/Municipality: [[ | + | | Township: 019 |
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 26 | ||
+ | |- | ||
+ | | Section: 15 | ||
+ | |- | ||
+ | | County/Municipality: [[Foothills County,_Alberta|Foothills County]] | ||
|- | |- | ||
| Well Name: SKELLY BERTA L-1 BLACKIE 10-15-19-26 | | Well Name: SKELLY BERTA L-1 BLACKIE 10-15-19-26 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Canadian Reserve Oil And Gas Ltd.]] |
|- | |- | ||
| License Number: 0022534 | | License Number: 0022534 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1962-08-09 | | Final Drill Date: 1962-08-09 | ||
|- | |- | ||
− | | Well Total Depth: 2384. | + | | Well Total Depth: 2384.50 m |
|- | |- | ||
| Surface Hole Latitude: 50.610634 | | Surface Hole Latitude: 50.610634 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1962-06-06 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1962-07-04 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-07-10 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-07-12 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-07-15 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-07-16 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-07-17 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-07-20 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-07-21 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-08-09 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1962-08-11 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1962-08-13 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1962-08-18 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1962-08-18 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1962-08-21 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1962-08-21 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1962-08-22 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1962-08-22 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 1962-08-25 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1962-08-25 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1962-08-26 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1962-08-31 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1962-09-02 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1962-09-04 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1962-09-04 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 1962-09-07 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1962-09-13 | ||
+ | | Perforation Treatment Performed - Abrasa-Jet Perforation | ||
+ | |- | ||
+ | | 1962-09-13 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 1962-09-14 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1962-09-14 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 1962-09-20 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 1962-09-23 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | | 1962-09-23 | ||
+ | | Well Mode changed to Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 198: | ||
| 1962-08-18 | | 1962-08-18 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1963. | + | | style="text-align: right;" | 1963.20 |
− | | style="text-align: right;" | 1966. | + | | style="text-align: right;" | 1966.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1962-08-18 | | 1962-08-18 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1963. | + | | style="text-align: right;" | 1963.20 |
− | | style="text-align: right;" | 1966. | + | | style="text-align: right;" | 1966.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-08-21 | | 1962-08-21 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1961. | + | | style="text-align: right;" | 1961.70 |
− | | style="text-align: right;" | 1962. | + | | style="text-align: right;" | 1962.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-08-21 | | 1962-08-21 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1951 | + | | style="text-align: right;" | 1951.00 |
− | | style="text-align: right;" | 1955. | + | | style="text-align: right;" | 1955.30 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1962-08-22 | | 1962-08-22 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1951 | + | | style="text-align: right;" | 1951.00 |
− | | style="text-align: right;" | 1955. | + | | style="text-align: right;" | 1955.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-08-22 | | 1962-08-22 | ||
− | | Fracture | + | | Fracture |
− | | style="text-align: right;" | 1951 | + | | style="text-align: right;" | 1951.00 |
− | | style="text-align: right;" | 1955. | + | | style="text-align: right;" | 1955.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-08-25 | | 1962-08-25 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1949. | + | | style="text-align: right;" | 1949.20 |
− | | style="text-align: right;" | 1949. | + | | style="text-align: right;" | 1949.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-08-25 | | 1962-08-25 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1905. | + | | style="text-align: right;" | 1905.60 |
− | | style="text-align: right;" | 1907. | + | | style="text-align: right;" | 1907.70 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1962-08-26 | | 1962-08-26 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1905. | + | | style="text-align: right;" | 1905.60 |
− | | style="text-align: right;" | 1907. | + | | style="text-align: right;" | 1907.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-08-31 | | 1962-08-31 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1905. | + | | style="text-align: right;" | 1905.60 |
− | | style="text-align: right;" | 1907. | + | | style="text-align: right;" | 1907.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-09-02 | | 1962-09-02 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1905. | + | | style="text-align: right;" | 1905.60 |
− | | style="text-align: right;" | 1907. | + | | style="text-align: right;" | 1907.70 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1962-09-04 | | 1962-09-04 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1905. | + | | style="text-align: right;" | 1905.60 |
− | | style="text-align: right;" | 1907. | + | | style="text-align: right;" | 1907.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-09-04 | | 1962-09-04 | ||
− | | Fracture | + | | Fracture |
− | | style="text-align: right;" | 1905. | + | | style="text-align: right;" | 1905.60 |
− | | style="text-align: right;" | 1907. | + | | style="text-align: right;" | 1907.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-09-07 | | 1962-09-07 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1905. | + | | style="text-align: right;" | 1905.60 |
− | | style="text-align: right;" | 1907. | + | | style="text-align: right;" | 1907.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-09-13 | | 1962-09-13 | ||
| Hydra Jet Perforation | | Hydra Jet Perforation | ||
− | | style="text-align: right;" | 1906. | + | | style="text-align: right;" | 1906.50 |
− | | style="text-align: right;" | 1906. | + | | style="text-align: right;" | 1906.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-09-13 | | 1962-09-13 | ||
− | | Fracture | + | | Fracture |
− | | style="text-align: right;" | 1906. | + | | style="text-align: right;" | 1906.50 |
− | | style="text-align: right;" | 1906. | + | | style="text-align: right;" | 1906.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-09-14 | | 1962-09-14 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1906. | + | | style="text-align: right;" | 1906.50 |
− | | style="text-align: right;" | 1906. | + | | style="text-align: right;" | 1906.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-09-14 | | 1962-09-14 | ||
− | | Fracture | + | | Fracture |
− | | style="text-align: right;" | 1906. | + | | style="text-align: right;" | 1906.50 |
− | | style="text-align: right;" | 1906. | + | | style="text-align: right;" | 1906.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1962-09-20 | | 1962-09-20 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 1889. | + | | style="text-align: right;" | 1889.80 |
− | | style="text-align: right;" | 1921. | + | | style="text-align: right;" | 1921.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 190: | Line 314: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Trade Name |
− | + | !scope="col" | Supplier | |
− | !scope="col | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Well ID: 0194261510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.610634,"lon":-113.521721,"icon":""}]} |
Location: 00/10-15-019-26W4/0 | |
Location Alias: 00/10-15-19-26 W4M | |
Location Alias 2: 00/10-15-019-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 019 | |
Meridian: 4 | |
Range: 26 | |
Section: 15 | |
County/Municipality: Foothills County | |
Well Name: SKELLY BERTA L-1 BLACKIE 10-15-19-26 | |
Operator Name: Canadian Reserve Oil And Gas Ltd. | |
License Number: 0022534 | |
License Date: 1962-06-06 | |
License Status: RecExempt | |
Spud Date: 1962-06-21 | |
Final Drill Date: 1962-08-09 | |
Well Total Depth: 2384.50 m | |
Surface Hole Latitude: 50.610634 | |
Surface Hole Longitude: -113.521721 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-06-06 | Obtained License |
1962-07-04 | Drill Stem Test Performed |
1962-07-10 | Drill Stem Test Performed |
1962-07-12 | Drill Stem Test Performed |
1962-07-15 | Drill Stem Test Performed |
1962-07-16 | Drill Stem Test Performed |
1962-07-17 | Drill Stem Test Performed |
1962-07-20 | Drill Stem Test Performed |
1962-07-21 | Drill Stem Test Performed |
1962-08-09 | Finished Drilling |
1962-08-11 | Drill Stem Test Performed |
1962-08-13 | Production Casing Operation Performed |
1962-08-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-08-18 | Perforation Treatment Performed - Jet Perforation |
1962-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1962-08-21 | Perforation Treatment Performed - Jet Perforation |
1962-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-08-22 | Perforation Treatment Performed - Fractured |
1962-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1962-08-25 | Perforation Treatment Performed - Jet Perforation |
1962-08-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-08-31 | Perforation Treatment Performed - Cement Squeeze |
1962-09-02 | Perforation Treatment Performed - Jet Perforation |
1962-09-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-09-04 | Perforation Treatment Performed - Fractured |
1962-09-07 | Perforation Treatment Performed - Cement Squeeze |
1962-09-13 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1962-09-13 | Perforation Treatment Performed - Fractured |
1962-09-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-09-14 | Perforation Treatment Performed - Fractured |
1962-09-20 | Perforation Treatment Performed - Cement Plug |
1962-09-23 | Well Abandoned |
1962-09-23 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-08-18 | Perforation | 1963.20 | 1966.30 | 13 |
1962-08-18 | Acid Treatment | 1963.20 | 1966.30 | 0 |
1962-08-21 | Packing Device Capped w/Cement | 1961.70 | 1962.30 | 0 |
1962-08-21 | Perforation | 1951.00 | 1955.30 | 7 |
1962-08-22 | Acid Treatment | 1951.00 | 1955.30 | 0 |
1962-08-22 | Fracture | 1951.00 | 1955.30 | 0 |
1962-08-25 | Packing Device Capped w/Cement | 1949.20 | 1949.80 | 0 |
1962-08-25 | Perforation | 1905.60 | 1907.70 | 7 |
1962-08-26 | Acid Treatment | 1905.60 | 1907.70 | 0 |
1962-08-31 | Cement Squeeze | 1905.60 | 1907.70 | 0 |
1962-09-02 | Perforation | 1905.60 | 1907.70 | 7 |
1962-09-04 | Acid Treatment | 1905.60 | 1907.70 | 0 |
1962-09-04 | Fracture | 1905.60 | 1907.70 | 0 |
1962-09-07 | Cement Squeeze | 1905.60 | 1907.70 | 0 |
1962-09-13 | Hydra Jet Perforation | 1906.50 | 1906.50 | 0 |
1962-09-13 | Fracture | 1906.50 | 1906.50 | 0 |
1962-09-14 | Acid Treatment | 1906.50 | 1906.50 | 0 |
1962-09-14 | Fracture | 1906.50 | 1906.50 | 0 |
1962-09-20 | Cement Plug | 1889.80 | 1921.50 | 0 |
For data sources see[4]