X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0195021805003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0195021805003
 
| Well ID: 0195021805003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.606591, -114.275871 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.606591, -114.275871 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/05-18-019-02W5/3
 
| Location: 00/05-18-019-02W5/3
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/05-18-019-02 W5/03
 
| Location Alias 2: 00/05-18-019-02 W5/03
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 
|-
 
|-
| County/Municipality: [[Municipal District of Foothills No. 31,_Alberta|Municipal District of Foothills No. 31]]
+
| Township: 019
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 02
 +
|-
 +
| Section: 18
 +
|-
 +
| County/Municipality: [[Foothills County,_Alberta|Foothills County]]
 
|-
 
|-
 
| Well Name: CPEC CALMONT NW 2 TV 5-18-19-2
 
| Well Name: CPEC CALMONT NW 2 TV 5-18-19-2
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Crescent Point Energy Corp.]]
 
|-
 
|-
 
| License Number: B0000111
 
| License Number: B0000111
Line 23: Line 33:
 
| License Date: 1940-05-21
 
| License Date: 1940-05-21
 
|-
 
|-
| License Status: RecCertified
+
| License Status: Abandoned
 
|-
 
|-
 
| Spud Date: 1940-06-08
 
| Spud Date: 1940-06-08
Line 29: Line 39:
 
| Final Drill Date: 1940-10-31
 
| Final Drill Date: 1940-10-31
 
|-
 
|-
| Well Total Depth: 2425 m
+
| Well Total Depth: 2425.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 50.606591
 
| Surface Hole Latitude: 50.606591
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1940-05-21
 +
| Obtained License
 +
|-
 +
| 1940-10-17
 +
| Production Casing Operation Performed
 +
|-
 +
| 1940-10-31
 +
| Finished Drilling
 +
|-
 +
| 1940-10-31
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1940-10-31
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1940-11-02
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1940-11-04
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 2010-08-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-08-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-08-24
 +
| Plug Back Performed
 +
|-
 +
| 2010-08-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-08-25
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-08-26
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-08-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-08-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-08-28
 +
| Plug Back Performed
 +
|-
 +
| 2010-08-28
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2010-08-29
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-08-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-08-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-08-30
 +
| Plug Back Performed
 +
|-
 +
| 2010-08-31
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2010-09-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-09-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-09-01
 +
| Plug Back Performed
 +
|-
 +
| 2010-09-02
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2010-09-02
 +
| Plug Back Performed
 +
|-
 +
| 2010-11-17
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 183:
 
| 1940-10-31
 
| 1940-10-31
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 2287.2
+
| style="text-align: right;" | 2287.20
| style="text-align: right;" | 2425
+
| style="text-align: right;" | 2425.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1940-11-02
 
| 1940-11-02
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 2287.2
+
| style="text-align: right;" | 2287.20
| style="text-align: right;" | 2425
+
| style="text-align: right;" | 2425.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1940-11-04
 
| 1940-11-04
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 2287.2
+
| style="text-align: right;" | 2287.20
| style="text-align: right;" | 2425
+
| style="text-align: right;" | 2425.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-08-24
 
| 2010-08-24
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2272
+
| style="text-align: right;" | 2272.00
| style="text-align: right;" | 2280
+
| style="text-align: right;" | 2280.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-08-24
 
| 2010-08-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1760
+
| style="text-align: right;" | 1760.00
| style="text-align: right;" | 1761
+
| style="text-align: right;" | 1761.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2010-08-25
 
| 2010-08-25
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1760
+
| style="text-align: right;" | 1760.00
| style="text-align: right;" | 1761
+
| style="text-align: right;" | 1761.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-08-25
 
| 2010-08-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1604
+
| style="text-align: right;" | 1604.00
| style="text-align: right;" | 1605
+
| style="text-align: right;" | 1605.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2010-08-26
 
| 2010-08-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1604
+
| style="text-align: right;" | 1604.00
| style="text-align: right;" | 1605
+
| style="text-align: right;" | 1605.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-08-28
 
| 2010-08-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 672
+
| style="text-align: right;" | 672.00
| style="text-align: right;" | 680
+
| style="text-align: right;" | 680.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-08-28
 
| 2010-08-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 600
+
| style="text-align: right;" | 600.00
| style="text-align: right;" | 601
+
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2010-08-29
 
| 2010-08-29
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 600
+
| style="text-align: right;" | 600.00
| style="text-align: right;" | 601
+
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-08-30
 
| 2010-08-30
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 586
+
| style="text-align: right;" | 586.00
| style="text-align: right;" | 594
+
| style="text-align: right;" | 594.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-08-30
 
| 2010-08-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 459
+
| style="text-align: right;" | 459.00
| style="text-align: right;" | 460
+
| style="text-align: right;" | 460.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2010-08-31
 
| 2010-08-31
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 459
+
| style="text-align: right;" | 459.00
| style="text-align: right;" | 460
+
| style="text-align: right;" | 460.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-09-01
 
| 2010-09-01
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 447
+
| style="text-align: right;" | 447.00
| style="text-align: right;" | 455
+
| style="text-align: right;" | 455.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-09-01
 
| 2010-09-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 373
+
| style="text-align: right;" | 373.00
| style="text-align: right;" | 374
+
| style="text-align: right;" | 374.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2010-09-02
 
| 2010-09-02
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 373
+
| style="text-align: right;" | 373.00
| style="text-align: right;" | 374
+
| style="text-align: right;" | 374.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 178: Line 287:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 21:04, 9 July 2020

Well Details

Well ID: 0195021805003
Loading map...
Location: 00/05-18-019-02W5/3
Location Alias: 00/05-18-19-02 W5M
Location Alias 2: 00/05-18-019-02 W5/03
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 18
County/Municipality: Foothills County
Well Name: CPEC CALMONT NW 2 TV 5-18-19-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000111
License Date: 1940-05-21
License Status: Abandoned
Spud Date: 1940-06-08
Final Drill Date: 1940-10-31
Well Total Depth: 2425.00 m
Surface Hole Latitude: 50.606591
Surface Hole Longitude: -114.275871

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1940-05-21 Obtained License
1940-10-17 Production Casing Operation Performed
1940-10-31 Finished Drilling
1940-10-31 Perforation Treatment Performed - Open-Hole Completion
1940-10-31 Well Mode changed to Drilled and Cased
1940-11-02 Perforation Treatment Performed - Acid Wash - No Pressure
1940-11-04 Perforation Treatment Performed - Acid Wash - No Pressure
2010-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-24 Perforation Treatment Performed - Jet Perforation
2010-08-24 Plug Back Performed
2010-08-25 Perforation Treatment Performed - Jet Perforation
2010-08-25 Perforation Treatment Performed - Remedial Casing
2010-08-26 Perforation Treatment Performed - Remedial Casing
2010-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-28 Perforation Treatment Performed - Jet Perforation
2010-08-28 Plug Back Performed
2010-08-28 Well Mode changed to Abandoned Zone
2010-08-29 Perforation Treatment Performed - Remedial Casing
2010-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-30 Perforation Treatment Performed - Jet Perforation
2010-08-30 Plug Back Performed
2010-08-31 Perforation Treatment Performed - Remedial Casing
2010-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-01 Perforation Treatment Performed - Jet Perforation
2010-09-01 Plug Back Performed
2010-09-02 Perforation Treatment Performed - Cement Squeeze
2010-09-02 Plug Back Performed
2010-11-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-10-31 Open Hole/Barefoot Completion 2287.20 2425.00 0
1940-11-02 Acid Wash 2287.20 2425.00 0
1940-11-04 Acid Wash 2287.20 2425.00 0
2010-08-24 Packing Device Capped w/Cement 2272.00 2280.00 0
2010-08-24 Perforation 1760.00 1761.00 20
2010-08-25 Remedial Casing Cementing 1760.00 1761.00 0
2010-08-25 Perforation 1604.00 1605.00 20
2010-08-26 Remedial Casing Cementing 1604.00 1605.00 0
2010-08-28 Packing Device Capped w/Cement 672.00 680.00 0
2010-08-28 Perforation 600.00 601.00 20
2010-08-29 Remedial Casing Cementing 600.00 601.00 0
2010-08-30 Packing Device Capped w/Cement 586.00 594.00 0
2010-08-30 Perforation 459.00 460.00 20
2010-08-31 Remedial Casing Cementing 459.00 460.00 0
2010-09-01 Packing Device Capped w/Cement 447.00 455.00 0
2010-09-01 Perforation 373.00 374.00 20
2010-09-02 Cement Squeeze 373.00 374.00 0

For data sources see[4]



References