X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0285042616002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0285042616002
 
| Well ID: 0285042616002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.430636, -114.448873 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.430636, -114.448873 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-26-028-04W5/2
 
| Location: 00/16-26-028-04W5/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/16-26-028-04 W5/02
 
| Location Alias 2: 00/16-26-028-04 W5/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 028
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 04
 +
|-
 +
| Section: 26
 
|-
 
|-
 
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]]
 
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]]
Line 17: Line 27:
 
| Well Name: RHODES ET AL LOCHEND 16-26-28-4
 
| Well Name: RHODES ET AL LOCHEND 16-26-28-4
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[ORLEN Upstream Canada Ltd.]]
 
|-
 
|-
 
| License Number: 0113639
 
| License Number: 0113639
Line 29: Line 39:
 
| Final Drill Date: 1985-03-23
 
| Final Drill Date: 1985-03-23
 
|-
 
|-
| Well Total Depth: 2316 m
+
| Well Total Depth: 2316.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 51.430636
 
| Surface Hole Latitude: 51.430636
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1985-02-26
 +
| Obtained License
 +
|-
 +
| 1985-03-14
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-03-23
 +
| Finished Drilling
 +
|-
 +
| 1985-03-23
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1985-03-24
 +
| Well Log Performed
 +
|-
 +
| 1985-03-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 1985-03-25
 +
| Rig Released
 +
|-
 +
| 1985-04-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-04-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1985-04-04
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2011-03-03
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2011-03-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-03-03
 +
| Plug Back Performed
 +
|-
 +
| 2012-01-11
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2013-01-09
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2013-01-09
 +
| Plug Back Performed
 +
|-
 +
| 2013-01-09
 +
| Well Log Performed
 +
|-
 +
| 2013-01-09
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2013-01-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-01-10
 +
| Well Log Performed
 +
|-
 +
| 2013-01-11
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2013-01-11
 +
| Plug Back Performed
 +
|-
 +
| 2013-01-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2013-01-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-01-12
 +
| Plug Back Performed
 +
|-
 +
| 2013-01-14
 +
| Well Log Performed
 +
|-
 +
| 2013-01-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-01-15
 +
| Well Log Performed
 +
|-
 +
| 2013-01-16
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2013-01-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-01-16
 +
| Plug Back Performed
 +
|-
 +
| 2013-01-16
 +
| Well Log Performed
 +
|-
 +
| 2013-01-17
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2013-01-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-01-17
 +
| Plug Back Performed
 +
|-
 +
| 2013-01-17
 +
| Well Log Performed
 +
|-
 +
| 2013-01-18
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2013-01-18
 +
| Plug Back Performed
 +
|-
 +
| 2013-01-25
 +
| Well Abandoned
 +
|-
 +
| 2013-01-25
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 216:
 
| 1985-04-03
 
| 1985-04-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2281.5
+
| style="text-align: right;" | 2281.50
| style="text-align: right;" | 2284.5
+
| style="text-align: right;" | 2284.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1985-04-04
 
| 1985-04-04
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2281.5
+
| style="text-align: right;" | 2281.50
| style="text-align: right;" | 2284.5
+
| style="text-align: right;" | 2284.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1985-04-04
 
| 1985-04-04
| Fracture  
+
| Fracture
| style="text-align: right;" | 2281.5
+
| style="text-align: right;" | 2281.50
| style="text-align: right;" | 2284.5
+
| style="text-align: right;" | 2284.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-03-03
 
| 2011-03-03
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 2267.4
+
| style="text-align: right;" | 2267.40
| style="text-align: right;" | 2275.4
+
| style="text-align: right;" | 2275.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011-03-03
 
| 2011-03-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2255.5
+
| style="text-align: right;" | 2255.50
| style="text-align: right;" | 2258.5
+
| style="text-align: right;" | 2258.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2012-01-11
 
| 2012-01-11
| Fracture  
+
| Fracture
| style="text-align: right;" | 2255.5
+
| style="text-align: right;" | 2255.50
| style="text-align: right;" | 2258.5
+
| style="text-align: right;" | 2258.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-01-09
 
| 2013-01-09
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 2240
+
| style="text-align: right;" | 2240.00
| style="text-align: right;" | 2248
+
| style="text-align: right;" | 2248.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-01-10
 
| 2013-01-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1780
+
| style="text-align: right;" | 1780.00
| style="text-align: right;" | 1781
+
| style="text-align: right;" | 1781.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2013-01-10
 
| 2013-01-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1561
+
| style="text-align: right;" | 1561.00
| style="text-align: right;" | 1562
+
| style="text-align: right;" | 1562.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2013-01-10
 
| 2013-01-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1475.5
+
| style="text-align: right;" | 1475.50
| style="text-align: right;" | 1476.5
+
| style="text-align: right;" | 1476.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2013-01-10
 
| 2013-01-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1357
+
| style="text-align: right;" | 1357.00
| style="text-align: right;" | 1358
+
| style="text-align: right;" | 1358.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2013-01-10
 
| 2013-01-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 951
+
| style="text-align: right;" | 951.00
| style="text-align: right;" | 952
+
| style="text-align: right;" | 952.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2013-01-10
 
| 2013-01-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 797
+
| style="text-align: right;" | 797.00
| style="text-align: right;" | 798
+
| style="text-align: right;" | 798.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2013-01-11
 
| 2013-01-11
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 753.5
+
| style="text-align: right;" | 753.50
| style="text-align: right;" | 1850
+
| style="text-align: right;" | 1850.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-01-12
 
| 2013-01-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 600
+
| style="text-align: right;" | 600.00
| style="text-align: right;" | 601
+
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2013-01-12
 
| 2013-01-12
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 600
+
| style="text-align: right;" | 600.00
| style="text-align: right;" | 601
+
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-01-15
 
| 2013-01-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 475
+
| style="text-align: right;" | 475.00
| style="text-align: right;" | 476
+
| style="text-align: right;" | 476.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2013-01-16
 
| 2013-01-16
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 475
+
| style="text-align: right;" | 475.00
| style="text-align: right;" | 476
+
| style="text-align: right;" | 476.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-01-16
 
| 2013-01-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 420
+
| style="text-align: right;" | 420.00
| style="text-align: right;" | 421
+
| style="text-align: right;" | 421.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2013-01-17
 
| 2013-01-17
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 402
+
| style="text-align: right;" | 402.00
| style="text-align: right;" | 410
+
| style="text-align: right;" | 410.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-01-17
 
| 2013-01-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 310
+
| style="text-align: right;" | 310.00
| style="text-align: right;" | 311
+
| style="text-align: right;" | 311.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2013-01-18
 
| 2013-01-18
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 310
+
| style="text-align: right;" | 310.00
| style="text-align: right;" | 311
+
| style="text-align: right;" | 311.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 208: Line 350:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 249: Line 405:
 
|-
 
|-
 
| 2011-07-08
 
| 2011-07-08
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2013-01-25
 
| 2013-01-25
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 262: Line 418:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 08:16, 10 July 2020

Well Details

Well ID: 0285042616002
Loading map...
Location: 00/16-26-028-04W5/2
Location Alias: 00/16-26-28-04 W5M
Location Alias 2: 00/16-26-028-04 W5/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 04
Section: 26
County/Municipality: Rocky View County
Well Name: RHODES ET AL LOCHEND 16-26-28-4
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0113639
License Date: 1985-02-26
License Status: Abandoned
Spud Date: 1985-03-13
Final Drill Date: 1985-03-23
Well Total Depth: 2316.00 m
Surface Hole Latitude: 51.430636
Surface Hole Longitude: -114.448873

For data sources see[1][2]

Well History

Date Event
1985-02-26 Obtained License
1985-03-14 Surface Casing Operation Performed
1985-03-23 Finished Drilling
1985-03-23 Well Mode changed to Drilled and Cased
1985-03-24 Well Log Performed
1985-03-25 Production Casing Operation Performed
1985-03-25 Rig Released
1985-04-03 Perforation Treatment Performed - Jet Perforation
1985-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-04 Perforation Treatment Performed - Fractured
2011-03-03 Perforation Treatment Performed - Cement Plug
2011-03-03 Perforation Treatment Performed - Jet Perforation
2011-03-03 Plug Back Performed
2012-01-11 Perforation Treatment Performed - Fractured
2013-01-09 Perforation Treatment Performed - Cement Plug
2013-01-09 Plug Back Performed
2013-01-09 Well Log Performed
2013-01-09 Well Mode changed to Abandoned Zone
2013-01-10 Perforation Treatment Performed - Jet Perforation
2013-01-10 Well Log Performed
2013-01-11 Perforation Treatment Performed - Cement Plug
2013-01-11 Plug Back Performed
2013-01-12 Perforation Treatment Performed - Cement Squeeze
2013-01-12 Perforation Treatment Performed - Jet Perforation
2013-01-12 Plug Back Performed
2013-01-14 Well Log Performed
2013-01-15 Perforation Treatment Performed - Jet Perforation
2013-01-15 Well Log Performed
2013-01-16 Perforation Treatment Performed - Cement Plug
2013-01-16 Perforation Treatment Performed - Jet Perforation
2013-01-16 Plug Back Performed
2013-01-16 Well Log Performed
2013-01-17 Perforation Treatment Performed - Cement Plug
2013-01-17 Perforation Treatment Performed - Jet Perforation
2013-01-17 Plug Back Performed
2013-01-17 Well Log Performed
2013-01-18 Perforation Treatment Performed - Cement Squeeze
2013-01-18 Plug Back Performed
2013-01-25 Well Abandoned
2013-01-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-04-03 Perforation 2281.50 2284.50 13
1985-04-04 Acid Treatment 2281.50 2284.50 0
1985-04-04 Fracture 2281.50 2284.50 0
2011-03-03 Cement Plug 2267.40 2275.40 0
2011-03-03 Perforation 2255.50 2258.50 17
2012-01-11 Fracture 2255.50 2258.50 0
2013-01-09 Cement Plug 2240.00 2248.00 0
2013-01-10 Perforation 1780.00 1781.00 13
2013-01-10 Perforation 1561.00 1562.00 13
2013-01-10 Perforation 1475.50 1476.50 13
2013-01-10 Perforation 1357.00 1358.00 13
2013-01-10 Perforation 951.00 952.00 13
2013-01-10 Perforation 797.00 798.00 13
2013-01-11 Cement Plug 753.50 1850.00 0
2013-01-12 Perforation 600.00 601.00 14
2013-01-12 Cement Squeeze 600.00 601.00 0
2013-01-15 Perforation 475.00 476.00 13
2013-01-16 Cement Plug 475.00 476.00 0
2013-01-16 Perforation 420.00 421.00 14
2013-01-17 Cement Plug 402.00 410.00 0
2013-01-17 Perforation 310.00 311.00 13
2013-01-18 Cement Squeeze 310.00 311.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-07-08 No Incident Encountered 0.00 0.00
2013-01-25 No Incident Encountered 0.00 0.00

For data sources see[5]

References