X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0564203109000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0564203109000
 
| Well ID: 0564203109000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.885268, -112.954965 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.885268, -112.954965 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/09-31-056-20W4/0
 
| Location: 00/09-31-056-20W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/09-31-056-20 W4/00
 
| Location Alias 2: 00/09-31-056-20 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 056
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 31
 
|-
 
|-
 
| County/Municipality: [[Strathcona County,_Alberta|Strathcona County]]
 
| County/Municipality: [[Strathcona County,_Alberta|Strathcona County]]
Line 17: Line 27:
 
| Well Name: PENNWEST REDWATER 9-31-56-20
 
| Well Name: PENNWEST REDWATER 9-31-56-20
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Obsidian Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0002002
 
| License Number: 0002002
Line 29: Line 39:
 
| Final Drill Date: 1950-10-12
 
| Final Drill Date: 1950-10-12
 
|-
 
|-
| Well Total Depth: 985.1 m
+
| Well Total Depth: 985.10 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.885268
 
| Surface Hole Latitude: 53.885268
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1950-09-09
 +
| Obtained License
 +
|-
 +
| 1950-10-01
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1950-10-01
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1950-10-01
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1950-10-12
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-10-12
 +
| Finished Drilling
 +
|-
 +
| 1950-10-12
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1950-10-15
 +
| Production Casing Operation Performed
 +
|-
 +
| 1950-10-30
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1950-11-06
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1950-11-10
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1950-11-12
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1950-12-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1951-02-18
 +
| Well Began Production
 +
|-
 +
| 1951-02-18
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1951-02-18
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1952-01-26
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1952-01-26
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1952-12-10
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1954-05-18
 +
| Perforation Treatment Performed - Visqueeze
 +
|-
 +
| 1954-05-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1954-05-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-05-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1954-05-25
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1957-08-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1957-08-26
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1968-08-06
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1968-08-06
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1970-07-15
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1970-07-15
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1970-08-12
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1970-08-12
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1999-11-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-11-27
 +
| Plug Back Performed
 +
|-
 +
| 1999-11-27
 +
| Well Log Performed
 +
|-
 +
| 1999-11-28
 +
| Well Log Performed
 +
|-
 +
| 1999-11-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-11-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-11-29
 +
| Plug Back Performed
 +
|-
 +
| 1999-11-29
 +
| Well Log Performed
 +
|-
 +
| 1999-12-02
 +
| Well Abandoned
 +
|-
 +
| 1999-12-02
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1999-12-02
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 228:
 
| 1950-10-01
 
| 1950-10-01
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 980.8
+
| style="text-align: right;" | 980.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-10-01
 
| 1950-10-01
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 980.2
+
| style="text-align: right;" | 980.20
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 30
 
|-
 
|-
 
| 1950-10-01
 
| 1950-10-01
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 980.8
+
| style="text-align: right;" | 980.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-10-30
 
| 1950-10-30
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 979
+
| style="text-align: right;" | 979.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-11-06
 
| 1950-11-06
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 978.1
+
| style="text-align: right;" | 978.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-11-10
 
| 1950-11-10
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 978.1
+
| style="text-align: right;" | 978.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-11-12
 
| 1950-11-12
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 977.8
+
| style="text-align: right;" | 977.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-12-04
 
| 1950-12-04
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 977.8
+
| style="text-align: right;" | 977.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-01-26
 
| 1952-01-26
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 980.8
+
| style="text-align: right;" | 980.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-01-26
 
| 1952-01-26
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 980.8
+
| style="text-align: right;" | 980.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-12-10
 
| 1952-12-10
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 975.4
+
| style="text-align: right;" | 975.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-05-18
 
| 1954-05-18
| Visqueeze  
+
| Visqueeze
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 975.4
+
| style="text-align: right;" | 975.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-05-23
 
| 1954-05-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 975.4
+
| style="text-align: right;" | 975.40
| style="text-align: right;" | 977.2
+
| style="text-align: right;" | 977.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-05-23
 
| 1954-05-23
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 977.8
+
| style="text-align: right;" | 977.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-05-25
 
| 1954-05-25
| Fracture  
+
| Fracture
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 977.8
+
| style="text-align: right;" | 977.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-05-25
 
| 1954-05-25
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 980.8
+
| style="text-align: right;" | 980.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1957-08-21
 
| 1957-08-21
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 980.8
+
| style="text-align: right;" | 980.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1957-08-26
 
| 1957-08-26
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 974.8
+
| style="text-align: right;" | 974.80
| style="text-align: right;" | 985.1
+
| style="text-align: right;" | 985.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-11-27
 
| 1999-11-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 954
+
| style="text-align: right;" | 954.00
| style="text-align: right;" | 962
+
| style="text-align: right;" | 962.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-11-29
 
| 1999-11-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 499
+
| style="text-align: right;" | 499.00
| style="text-align: right;" | 500
+
| style="text-align: right;" | 500.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1999-11-29
 
| 1999-11-29
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 486
+
| style="text-align: right;" | 486.00
| style="text-align: right;" | 494
+
| style="text-align: right;" | 494.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 202: Line 356:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 235: Line 403:
 
| 1961
 
| 1961
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 222.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 91732.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1962
 
| 1962
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 15.8
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 13571.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1963
 
| 1963
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 10.0
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 13731.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1964
 
| 1964
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 11.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 16128.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1965
 
| 1965
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 19.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 37824.4
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1970
 
| 1970
 
| style="text-align: right;" | 48
 
| style="text-align: right;" | 48
| style="text-align: right;" | 0.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 509.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 273: Line 441:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 08:20, 10 July 2020

Well Details

Well ID: 0564203109000
Loading map...
Location: 00/09-31-056-20W4/0
Location Alias: 00/09-31-56-20 W4M
Location Alias 2: 00/09-31-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 31
County/Municipality: Strathcona County
Well Name: PENNWEST REDWATER 9-31-56-20
Operator Name: Obsidian Energy Ltd.
License Number: 0002002
License Date: 1950-09-09
License Status: RecCertified
Spud Date: 1950-10-03
Final Drill Date: 1950-10-12
Well Total Depth: 985.10 m
Surface Hole Latitude: 53.885268
Surface Hole Longitude: -112.954965

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-09-09 Obtained License
1950-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-10-01 Perforation Treatment Performed - Bullet Perforation
1950-10-01 Perforation Treatment Performed - Open-Hole Completion
1950-10-12 Drill Stem Test Performed
1950-10-12 Finished Drilling
1950-10-12 Well Mode changed to Drilled and Cased
1950-10-15 Production Casing Operation Performed
1950-10-30 Perforation Treatment Performed - Open-Hole Completion
1950-11-06 Perforation Treatment Performed - Open-Hole Completion
1950-11-10 Perforation Treatment Performed - Cement Squeeze
1950-11-12 Perforation Treatment Performed - Open-Hole Completion
1950-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-02-18 Well Began Production
1951-02-18 Well Fluid changed to Crude Oil
1951-02-18 Well Mode changed to Pumping
1952-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-01-26 Perforation Treatment Performed - Open-Hole Completion
1952-12-10 Perforation Treatment Performed - Open-Hole Completion
1954-05-18 Perforation Treatment Performed - Visqueeze
1954-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-05-23 Perforation Treatment Performed - Jet Perforation
1954-05-25 Perforation Treatment Performed - Fractured
1954-05-25 Perforation Treatment Performed - Open-Hole Completion
1957-08-21 Perforation Treatment Performed - Cement Squeeze
1957-08-26 Perforation Treatment Performed - Open-Hole Completion
1968-08-06 Well Fluid changed to Crude Oil
1968-08-06 Well Mode changed to Suspended
1970-07-15 Well Fluid changed to Crude Oil
1970-07-15 Well Mode changed to Pumping
1970-08-12 Well Fluid changed to Crude Oil
1970-08-12 Well Mode changed to Suspended
1999-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-27 Plug Back Performed
1999-11-27 Well Log Performed
1999-11-28 Well Log Performed
1999-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-29 Perforation Treatment Performed - Jet Perforation
1999-11-29 Plug Back Performed
1999-11-29 Well Log Performed
1999-12-02 Well Abandoned
1999-12-02 Well Fluid changed to Crude Oil
1999-12-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-10-01 Open Hole/Barefoot Completion 974.80 980.80 0
1950-10-01 Bullet Perforation 974.80 980.20 30
1950-10-01 Acid Treatment 974.80 980.80 0
1950-10-30 Open Hole/Barefoot Completion 974.80 979.00 0
1950-11-06 Open Hole/Barefoot Completion 974.80 978.10 0
1950-11-10 Cement Squeeze 974.80 978.10 0
1950-11-12 Open Hole/Barefoot Completion 974.80 977.80 0
1950-12-04 Acid Treatment 974.80 977.80 0
1952-01-26 Open Hole/Barefoot Completion 974.80 980.80 0
1952-01-26 Acid Treatment 974.80 980.80 0
1952-12-10 Open Hole/Barefoot Completion 974.80 975.40 0
1954-05-18 Visqueeze 974.80 975.40 0
1954-05-23 Perforation 975.40 977.20 13
1954-05-23 Acid Treatment 974.80 977.80 0
1954-05-25 Fracture 974.80 977.80 0
1954-05-25 Open Hole/Barefoot Completion 974.80 980.80 0
1957-08-21 Cement Squeeze 974.80 980.80 0
1957-08-26 Open Hole/Barefoot Completion 974.80 985.10 0
1999-11-27 Packing Device Capped w/Cement 954.00 962.00 0
1999-11-29 Perforation 499.00 500.00 13
1999-11-29 Packing Device Capped w/Cement 486.00 494.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 48 0.0 0.0 0.0

For data sources see[5]

References