X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0484200511000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0484200511000
 
| Well ID: 0484200511000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.112803, -112.897795 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.112803, -112.897795 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/11-05-048-20W4/0
 
| Location: 00/11-05-048-20W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/11-05-048-20 W4/00
 
| Location Alias 2: 00/11-05-048-20 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 048
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 05
 
|-
 
|-
 
| County/Municipality: [[Camrose County,_Alberta|Camrose County]]
 
| County/Municipality: [[Camrose County,_Alberta|Camrose County]]
Line 17: Line 27:
 
| Well Name: JULIUS OLSON NO. 3
 
| Well Name: JULIUS OLSON NO. 3
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Saba Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0005381
 
| License Number: 0005381
Line 29: Line 39:
 
| Final Drill Date: 1952-11-13
 
| Final Drill Date: 1952-11-13
 
|-
 
|-
| Well Total Depth: 1066.8 m
+
| Well Total Depth: 1066.80 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.112803
 
| Surface Hole Latitude: 53.112803
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1952-09-27
 +
| Obtained License
 +
|-
 +
| 1952-11-13
 +
| Finished Drilling
 +
|-
 +
| 1952-11-13
 +
| Production Casing Operation Performed
 +
|-
 +
| 1952-11-13
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1952-11-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1952-11-28
 +
| Well Began Production
 +
|-
 +
| 1952-11-28
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1952-11-28
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1953-07-31
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1953-08-03
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1970-07-15
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1970-07-15
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1972-10-31
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1972-11-07
 +
| Well Abandoned
 +
|-
 +
| 1972-11-07
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1972-11-07
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 147:
 
| 1952-11-17
 
| 1952-11-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1033.6
+
| style="text-align: right;" | 1033.60
| style="text-align: right;" | 1038.1
+
| style="text-align: right;" | 1038.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1953-07-31
 
| 1953-07-31
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1033.6
+
| style="text-align: right;" | 1033.60
| style="text-align: right;" | 1038.1
+
| style="text-align: right;" | 1038.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1953-08-03
 
| 1953-08-03
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1036.9
+
| style="text-align: right;" | 1036.90
| style="text-align: right;" | 1038.1
+
| style="text-align: right;" | 1038.10
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1972-10-31
 
| 1972-10-31
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 995.2
+
| style="text-align: right;" | 995.20
| style="text-align: right;" | 1066.8
+
| style="text-align: right;" | 1066.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 100: Line 173:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 133: Line 220:
 
| 1961
 
| 1961
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 2560.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 15.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1962
 
| 1962
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 275.5
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 145: Line 232:
 
| 1963
 
| 1963
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 47.3
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 151: Line 238:
 
| 1964
 
| 1964
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 109.1
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 157: Line 244:
 
| 1965
 
| 1965
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 157.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 57.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1966
 
| 1966
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 327.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 761.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1967
 
| 1967
 
| style="text-align: right;" | 6857
 
| style="text-align: right;" | 6857
| style="text-align: right;" | 214.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2939.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1968
 
| 1968
 
| style="text-align: right;" | 1152
 
| style="text-align: right;" | 1152
| style="text-align: right;" | 10.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 876.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1969
 
| 1969
 
| style="text-align: right;" | 648
 
| style="text-align: right;" | 648
| style="text-align: right;" | 1.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 604.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1970
 
| 1970
 
| style="text-align: right;" | 144
 
| style="text-align: right;" | 144
| style="text-align: right;" | 0.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 108.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 195: Line 282:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 15:26, 10 July 2020

Well Details

Well ID: 0484200511000
Location: 00/11-05-048-20W4/0
Location Alias: 00/11-05-48-20 W4M
Location Alias 2: 00/11-05-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 05
County/Municipality: Camrose County
Well Name: JULIUS OLSON NO. 3
Operator Name: Saba Energy Ltd.
License Number: 0005381
License Date: 1952-09-27
License Status: RecCertified
Spud Date: 1952-10-20
Final Drill Date: 1952-11-13
Well Total Depth: 1066.80 m
Surface Hole Latitude: 53.112803
Surface Hole Longitude: -112.897795

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-27 Obtained License
1952-11-13 Finished Drilling
1952-11-13 Production Casing Operation Performed
1952-11-13 Well Mode changed to Drilled and Cased
1952-11-17 Perforation Treatment Performed - Jet Perforation
1952-11-28 Well Began Production
1952-11-28 Well Fluid changed to Crude Oil
1952-11-28 Well Mode changed to Pumping
1953-07-31 Perforation Treatment Performed - Cement Squeeze
1953-08-03 Perforation Treatment Performed - Bullet Perforation
1970-07-15 Well Fluid changed to Crude Oil
1970-07-15 Well Mode changed to Suspended
1972-10-31 Perforation Treatment Performed - Cement Plug
1972-11-07 Well Abandoned
1972-11-07 Well Fluid changed to Crude Oil
1972-11-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-11-17 Perforation 1033.60 1038.10 13
1953-07-31 Cement Squeeze 1033.60 1038.10 0
1953-08-03 Bullet Perforation 1036.90 1038.10 7
1972-10-31 Cement Plug 995.20 1066.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6857 0.0 0.0 0.0
1968 1152 0.0 0.0 0.0
1969 648 0.0 0.0 0.0
1970 144 0.0 0.0 0.0

For data sources see[5]

References