X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0144251014000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0144251014000
 
| Well ID: 0144251014000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.161546, -113.336449 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.161546, -113.336449 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/14-10-014-25W4/0
 
| Location: 00/14-10-014-25W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/14-10-014-25 W4/00
 
| Location Alias 2: 00/14-10-014-25 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 014
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 10
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Willow Creek No. 26,_Alberta|Municipal District of Willow Creek No. 26]]
 
| County/Municipality: [[Municipal District of Willow Creek No. 26,_Alberta|Municipal District of Willow Creek No. 26]]
Line 17: Line 27:
 
| Well Name: PIONEER CANADA CLARES 14-10-14-25
 
| Well Name: PIONEER CANADA CLARES 14-10-14-25
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[TAQA North Ltd.]]
 
|-
 
|-
 
| License Number: 0085423
 
| License Number: 0085423
Line 29: Line 39:
 
| Final Drill Date: 1980-11-16
 
| Final Drill Date: 1980-11-16
 
|-
 
|-
| Well Total Depth: 2875 m
+
| Well Total Depth: 2875.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 50.161546
 
| Surface Hole Latitude: 50.161546
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1980-09-05
 +
| Obtained License
 +
|-
 +
| 1980-10-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-10-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-10-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-10-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-11-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-11-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-11-16
 +
| Finished Drilling
 +
|-
 +
| 1980-11-16
 +
| Well Log Performed
 +
|-
 +
| 1980-11-16
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1980-11-17
 +
| Well Log Performed
 +
|-
 +
| 1980-11-20
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-11-21
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-11-22
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-11-24
 +
| Production Casing Operation Performed
 +
|-
 +
| 1980-12-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-12-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-12-10
 +
| Well Began Production
 +
|-
 +
| 1980-12-10
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1980-12-10
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1981-01-08
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1981-01-08
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1984-11-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-11-29
 +
| Plug Back Performed
 +
|-
 +
| 1984-12-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-12-01
 +
| Plug Back Performed
 +
|-
 +
| 1984-12-01
 +
| Well Abandoned
 +
|-
 +
| 1984-12-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1984-12-01
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 186:
 
| 1980-12-07
 
| 1980-12-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2095.5
+
| style="text-align: right;" | 2095.50
| style="text-align: right;" | 2100
+
| style="text-align: right;" | 2100.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1980-12-09
 
| 1980-12-09
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2095.5
+
| style="text-align: right;" | 2095.50
| style="text-align: right;" | 2100
+
| style="text-align: right;" | 2100.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-11-29
 
| 1984-11-29
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2057
+
| style="text-align: right;" | 2057.00
| style="text-align: right;" | 2065
+
| style="text-align: right;" | 2065.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-12-01
 
| 1984-12-01
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 744
+
| style="text-align: right;" | 744.00
| style="text-align: right;" | 752
+
| style="text-align: right;" | 752.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 100: Line 212:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 133: Line 259:
 
| 1980
 
| 1980
 
| style="text-align: right;" | 130
 
| style="text-align: right;" | 130
| style="text-align: right;" | 0.1
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 139: Line 265:
 
| 1981
 
| 1981
 
| style="text-align: right;" | 144
 
| style="text-align: right;" | 144
| style="text-align: right;" | 0.1
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 147: Line 273:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 04:33, 11 July 2020

Well Details

Well ID: 0144251014000
Loading map...
Location: 00/14-10-014-25W4/0
Location Alias: 00/14-10-14-25 W4M
Location Alias 2: 00/14-10-014-25 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 25
Section: 10
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: PIONEER CANADA CLARES 14-10-14-25
Operator Name: TAQA North Ltd.
License Number: 0085423
License Date: 1980-09-05
License Status: RecCertified
Spud Date: 1980-09-12
Final Drill Date: 1980-11-16
Well Total Depth: 2875.00 m
Surface Hole Latitude: 50.161546
Surface Hole Longitude: -113.336449

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-05 Obtained License
1980-10-06 Drill Stem Test Performed
1980-10-11 Drill Stem Test Performed
1980-10-13 Drill Stem Test Performed
1980-10-25 Drill Stem Test Performed
1980-11-01 Drill Stem Test Performed
1980-11-03 Drill Stem Test Performed
1980-11-16 Finished Drilling
1980-11-16 Well Log Performed
1980-11-16 Well Mode changed to Drilled and Cased
1980-11-17 Well Log Performed
1980-11-20 Drill Stem Test Performed
1980-11-21 Drill Stem Test Performed
1980-11-22 Drill Stem Test Performed
1980-11-24 Production Casing Operation Performed
1980-12-07 Perforation Treatment Performed - Jet Perforation
1980-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-10 Well Began Production
1980-12-10 Well Fluid changed to Crude Oil
1980-12-10 Well Mode changed to Pumping
1981-01-08 Well Fluid changed to Crude Oil
1981-01-08 Well Mode changed to Suspended
1984-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-29 Plug Back Performed
1984-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-01 Plug Back Performed
1984-12-01 Well Abandoned
1984-12-01 Well Fluid changed to Crude Oil
1984-12-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-07 Perforation 2095.50 2100.00 14
1980-12-09 Acid Treatment 2095.50 2100.00 0
1984-11-29 Packing Device Capped w/Cement 2057.00 2065.00 0
1984-12-01 Packing Device Capped w/Cement 744.00 752.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 130 0.0 0.0 0.0
1981 144 0.0 0.0 0.0

For data sources see[5]

References