X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0805071710000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0805071710000
 
| Well ID: 0805071710000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.935987, -115.055445 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.935987, -115.055445 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-17-080-07W5/0
 
| Location: 00/10-17-080-07W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/10-17-080-07 W5/00
 
| Location Alias 2: 00/10-17-080-07 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 080
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 07
 +
|-
 +
| Section: 17
 
|-
 
|-
 
| County/Municipality: [[Northern Sunrise County,_Alberta|Northern Sunrise County]]
 
| County/Municipality: [[Northern Sunrise County,_Alberta|Northern Sunrise County]]
Line 17: Line 27:
 
| Well Name: HARBOUR ULSTER NIPISI 10-17-80-7
 
| Well Name: HARBOUR ULSTER NIPISI 10-17-80-7
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Tercero Resources Company]]
 
|-
 
|-
 
| License Number: 0075314
 
| License Number: 0075314
Line 29: Line 39:
 
| Final Drill Date: 1979-08-12
 
| Final Drill Date: 1979-08-12
 
|-
 
|-
| Well Total Depth: 1705 m
+
| Well Total Depth: 1705.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 55.935987
 
| Surface Hole Latitude: 55.935987
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1979-04-23
 +
| Obtained License
 +
|-
 +
| 1979-08-12
 +
| Finished Drilling
 +
|-
 +
| 1979-08-12
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1979-08-14
 +
| Drill Stem Test Performed
 +
|-
 +
| 1979-08-16
 +
| Production Casing Operation Performed
 +
|-
 +
| 1979-09-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-09-17
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1980-03-01
 +
| Well Began Production
 +
|-
 +
| 1980-03-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1980-03-01
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1980-06-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1980-06-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1981-07-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-07-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1982-12-14
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1982-12-14
 +
| Plug Back Performed
 +
|-
 +
| 1982-12-14
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1982-12-14
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1982-12-15
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 159:
 
| 1979-09-06
 
| 1979-09-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1681
+
| style="text-align: right;" | 1681.00
| style="text-align: right;" | 1683
+
| style="text-align: right;" | 1683.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1979-09-07
 
| 1979-09-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1681
+
| style="text-align: right;" | 1681.00
| style="text-align: right;" | 1683
+
| style="text-align: right;" | 1683.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-09-17
 
| 1979-09-17
| Fracture  
+
| Fracture
| style="text-align: right;" | 1681
+
| style="text-align: right;" | 1681.00
| style="text-align: right;" | 1683
+
| style="text-align: right;" | 1683.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-07-23
 
| 1981-07-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1681
+
| style="text-align: right;" | 1681.00
| style="text-align: right;" | 1683
+
| style="text-align: right;" | 1683.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1981-07-25
 
| 1981-07-25
| Fracture  
+
| Fracture
| style="text-align: right;" | 1681
+
| style="text-align: right;" | 1681.00
| style="text-align: right;" | 1683
+
| style="text-align: right;" | 1683.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-12-14
 
| 1982-12-14
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1664
+
| style="text-align: right;" | 1664.00
| style="text-align: right;" | 1672
+
| style="text-align: right;" | 1672.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 112: Line 197:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 145: Line 244:
 
| 1980
 
| 1980
 
| style="text-align: right;" | 1184
 
| style="text-align: right;" | 1184
| style="text-align: right;" | 0.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 153: Line 252:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 04:53, 11 July 2020

Well Details

Well ID: 0805071710000
Loading map...
Location: 00/10-17-080-07W5/0
Location Alias: 00/10-17-80-07 W5M
Location Alias 2: 00/10-17-080-07 W5/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 07
Section: 17
County/Municipality: Northern Sunrise County
Well Name: HARBOUR ULSTER NIPISI 10-17-80-7
Operator Name: Tercero Resources Company
License Number: 0075314
License Date: 1979-04-23
License Status: RecCertified
Spud Date: 1979-07-28
Final Drill Date: 1979-08-12
Well Total Depth: 1705.00 m
Surface Hole Latitude: 55.935987
Surface Hole Longitude: -115.055445

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-23 Obtained License
1979-08-12 Finished Drilling
1979-08-12 Well Mode changed to Drilled and Cased
1979-08-14 Drill Stem Test Performed
1979-08-16 Production Casing Operation Performed
1979-09-06 Perforation Treatment Performed - Jet Perforation
1979-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-17 Perforation Treatment Performed - Fractured
1980-03-01 Well Began Production
1980-03-01 Well Fluid changed to Crude Oil
1980-03-01 Well Mode changed to Pumping
1980-06-01 Well Fluid changed to Crude Oil
1980-06-01 Well Mode changed to Suspended
1981-07-23 Perforation Treatment Performed - Jet Perforation
1981-07-25 Perforation Treatment Performed - Fractured
1982-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-12-14 Plug Back Performed
1982-12-14 Well Fluid changed to Crude Oil
1982-12-14 Well Mode changed to Abandoned
1982-12-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-06 Perforation 1681.00 1683.00 7
1979-09-07 Acid Treatment 1681.00 1683.00 0
1979-09-17 Fracture 1681.00 1683.00 0
1981-07-23 Perforation 1681.00 1683.00 13
1981-07-25 Fracture 1681.00 1683.00 0
1982-12-14 Packing Device Capped w/Cement 1664.00 1672.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1184 0.0 0.0 0.0

For data sources see[5]

References