If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0494100610003 | | Well ID: 0494100610003 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 53.198535, -111.454924 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/10-06-049-10W4/3 | | Location: 00/10-06-049-10W4/3 | ||
|- | |- | ||
− | | Well Name: | + | | Location Alias: 00/10-06-49-10 W4M |
+ | |- | ||
+ | | Location Alias 2: 00/10-06-049-10 W4/03 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 049 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 10 | ||
+ | |- | ||
+ | | Section: 06 | ||
+ | |- | ||
+ | | County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]] | ||
+ | |- | ||
+ | | Well Name: PINE CLIFF VIK-KINS 10-6-49-10 | ||
+ | |- | ||
+ | | Operator Name: [[Pine Cliff Energy Ltd.]] | ||
+ | |- | ||
+ | | License Number: 0112785 | ||
|- | |- | ||
| License Date: 1985-01-23 | | License Date: 1985-01-23 | ||
|- | |- | ||
− | | Final Drilling Date | + | | License Status: Issued |
+ | |- | ||
+ | | Spud Date: 1985-01-30 | ||
+ | |- | ||
+ | | Final Drill Date: 1985-02-08 | ||
+ | |- | ||
+ | | Well Total Depth: 778.00 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 53.198535 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -111.454924 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1985-01-23 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1985-01-31 | ||
+ | | Lost Circulation Occurred | ||
+ | |- | ||
+ | | 1985-02-05 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 1985-02-08 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1985-02-08 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-02-08 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1985-02-12 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1985-02-12 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 1985-02-25 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-02-26 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1985-02-26 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-02-27 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1985-02-27 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1985-02-27 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1985-02-28 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-03-01 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1988-05-11 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1988-05-11 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1988-06-24 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1988-06-24 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1989-07-27 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1989-07-27 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1989-07-28 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1989-07-29 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1989-07-30 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1989-07-30 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1989-07-30 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1989-07-31 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1989-08-02 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1989-08-02 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1989-08-02 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1990-04-30 | ||
+ | | Well Fluid changed to Gas | ||
|- | |- | ||
− | | | + | | 1990-04-30 |
+ | | Well Mode changed to Suspended | ||
|- | |- | ||
− | | | + | | 1993-11-01 |
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
|- | |- | ||
− | | | + | | 1993-11-01 |
+ | | Perforation Treatment Performed - Jet Perforation | ||
|- | |- | ||
− | | | + | | 1993-11-01 |
+ | | Plug Back Performed | ||
|- | |- | ||
− | | | + | | 1993-11-17 |
+ | | Well Fluid changed to Gas | ||
|- | |- | ||
− | | | + | | 1993-11-17 |
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
|- | |- | ||
− | | | + | |}--> |
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
|- | |- | ||
+ | |}--> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1985-02-26 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 772.00 | ||
+ | | style="text-align: right;" | 773.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1985-02-27 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 762.00 | ||
+ | | style="text-align: right;" | 770.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-02-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 674.50 | ||
+ | | style="text-align: right;" | 675.50 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1985-03-01 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 728.00 | ||
+ | | style="text-align: right;" | 728.50 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1985-03-01 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 730.50 | ||
+ | | style="text-align: right;" | 732.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1988-05-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 667.00 | ||
+ | | style="text-align: right;" | 670.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1988-06-24 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 667.00 | ||
+ | | style="text-align: right;" | 675.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1989-07-27 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 728.00 | ||
+ | | style="text-align: right;" | 732.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1989-07-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 728.00 | ||
+ | | style="text-align: right;" | 729.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1989-07-29 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 728.00 | ||
+ | | style="text-align: right;" | 729.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1989-07-30 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 728.00 | ||
+ | | style="text-align: right;" | 729.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1989-07-31 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 749.50 | ||
+ | | style="text-align: right;" | 750.50 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1993-11-01 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 738.00 | ||
+ | | style="text-align: right;" | 745.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1993-11-01 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 654.00 | ||
+ | | style="text-align: right;" | 662.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1993-11-01 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 625.00 | ||
+ | | style="text-align: right;" | 627.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = General Well Data File - Tour-Perforation/Treatment Data |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 1989 | ||
+ | | style="text-align: right;" | 3595 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1990 | ||
+ | | style="text-align: right;" | 1308 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | | 1985-01-31 | ||
+ | | Lost Circulation | ||
+ | | style="text-align: right;" | 58.00 | ||
+ | | style="text-align: right;" | 159.00 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Occurence Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0494100610003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.198535,"lon":-111.454924,"icon":""}]} |
Location: 00/10-06-049-10W4/3 | |
Location Alias: 00/10-06-49-10 W4M | |
Location Alias 2: 00/10-06-049-10 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 10 | |
Section: 06 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PINE CLIFF VIK-KINS 10-6-49-10 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0112785 | |
License Date: 1985-01-23 | |
License Status: Issued | |
Spud Date: 1985-01-30 | |
Final Drill Date: 1985-02-08 | |
Well Total Depth: 778.00 m | |
Surface Hole Latitude: 53.198535 | |
Surface Hole Longitude: -111.454924 |
Date | Event |
---|---|
1985-01-23 | Obtained License |
1985-01-31 | Lost Circulation Occurred |
1985-02-05 | Surface Casing Operation Performed |
1985-02-08 | Finished Drilling |
1985-02-08 | Well Log Performed |
1985-02-08 | Well Mode changed to Drilled and Cased |
1985-02-12 | Production Casing Operation Performed |
1985-02-12 | Rig Released |
1985-02-25 | Well Log Performed |
1985-02-26 | Perforation Treatment Performed - Jet Perforation |
1985-02-26 | Well Log Performed |
1985-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-02-27 | Perforation Treatment Performed - Jet Perforation |
1985-02-27 | Plug Back Performed |
1985-02-28 | Well Log Performed |
1985-03-01 | Perforation Treatment Performed - Jet Perforation |
1988-05-11 | Perforation Treatment Performed - Jet Perforation |
1988-05-11 | Well Log Performed |
1988-06-24 | Perforation Treatment Performed - Cement Squeeze |
1988-06-24 | Plug Back Performed |
1989-07-27 | Perforation Treatment Performed - Cement Squeeze |
1989-07-27 | Well Log Performed |
1989-07-28 | Perforation Treatment Performed - Jet Perforation |
1989-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-07-30 | Perforation Treatment Performed - Cement Squeeze |
1989-07-30 | Plug Back Performed |
1989-07-30 | Well Log Performed |
1989-07-31 | Perforation Treatment Performed - Jet Perforation |
1989-08-02 | Well Began Production |
1989-08-02 | Well Fluid changed to Gas |
1989-08-02 | Well Mode changed to Flowing |
1990-04-30 | Well Fluid changed to Gas |
1990-04-30 | Well Mode changed to Suspended |
1993-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-11-01 | Perforation Treatment Performed - Jet Perforation |
1993-11-01 | Plug Back Performed |
1993-11-17 | Well Fluid changed to Gas |
1993-11-17 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-02-26 | Perforation | 772.00 | 773.00 | 7 |
1985-02-27 | Packing Device Capped w/Cement | 762.00 | 770.00 | 0 |
1985-02-27 | Perforation | 674.50 | 675.50 | 7 |
1985-03-01 | Perforation | 728.00 | 728.50 | 7 |
1985-03-01 | Perforation | 730.50 | 732.00 | 7 |
1988-05-11 | Perforation | 667.00 | 670.00 | 7 |
1988-06-24 | Cement Squeeze | 667.00 | 675.50 | 0 |
1989-07-27 | Cement Squeeze | 728.00 | 732.00 | 0 |
1989-07-28 | Perforation | 728.00 | 729.00 | 7 |
1989-07-29 | Acid Treatment | 728.00 | 729.00 | 0 |
1989-07-30 | Cement Squeeze | 728.00 | 729.00 | 0 |
1989-07-31 | Perforation | 749.50 | 750.50 | 7 |
1993-11-01 | Packing Device Capped w/Cement | 738.00 | 745.00 | 0 |
1993-11-01 | Packing Device Capped w/Cement | 654.00 | 662.00 | 0 |
1993-11-01 | Perforation | 625.00 | 627.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 3595 | 0.0 | 0.0 | 0.0 |
1990 | 1308 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-01-31 | Lost Circulation | 58.00 | 159.00 |
For data sources see[6]