X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0324192102003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0324192102003
 
| Well ID: 0324192102003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.75365800000002992, -112.63505599999996321 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.753658, -112.635056 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/02-21-032-19W4/3
 
| Location: 00/02-21-032-19W4/3
 
|-
 
|-
| Well Name: RENAISSANCE DELIA 2-21-32-19
+
| Location Alias: 00/02-21-32-19 W4M
 +
|-
 +
| Location Alias 2: 00/02-21-032-19 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 032
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 19
 +
|-
 +
| Section: 21
 +
|-
 +
| County/Municipality: [[Starland County,_Alberta|Starland County]]
 +
|-
 +
| Well Name: TEAC DELIA 2-21-32-19
 +
|-
 +
| Operator Name: [[Trident Exploration (Alberta) Corp.]]
 +
|-
 +
| License Number: 0209368
 
|-
 
|-
 
| License Date: 1997-11-26
 
| License Date: 1997-11-26
 
|-
 
|-
| Final Drilling Date: 1998-01-24
+
| License Status: Issued
 +
|-
 +
| Spud Date: 1998-01-20
 +
|-
 +
| Final Drill Date: 1998-01-24
 +
|-
 +
| Well Total Depth: 1400.00 m
 +
|-
 +
| Surface Hole Latitude: 51.753658
 +
|-
 +
| Surface Hole Longitude: -112.635056
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1997-11-26
 +
| Obtained License
 +
|-
 +
| 1998-01-21
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1998-01-24
 +
| Drill Stem Test Performed
 +
|-
 +
| 1998-01-24
 +
| Finished Drilling
 +
|-
 +
| 1998-01-24
 +
| Well Log Performed
 +
|-
 +
| 1998-01-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1998-01-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1998-01-26
 +
| Production Casing Operation Performed
 +
|-
 +
| 1998-01-26
 +
| Rig Released
 +
|-
 +
| 1998-02-03
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1998-02-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-02-03
 +
| Well Log Performed
 +
|-
 +
| 1998-02-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1998-02-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-02-12
 +
| Plug Back Performed
 +
|-
 +
| 1998-02-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-02-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1998-02-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-02-17
 +
| Plug Back Performed
 +
|-
 +
| 1998-02-18
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1998-03-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1998-03-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-03-11
 +
| Plug Back Performed
 +
|-
 +
| 2008-12-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-01-03
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-01-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-01-09
 +
| Plug Back Performed
 +
|-
 +
| 2009-01-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-01-10
 +
| Well Log Performed
 +
|-
 +
| 2009-01-11
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-01-20
 +
| Well Log Performed
 +
|-
 +
| 2009-02-04
 +
| Well Began Production
 +
|-
 +
| 2009-02-04
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 +
|-
 +
| 2009-02-04
 +
| Well Mode changed to Flowing
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1998-02-03
 +
| Perforation
 +
| style="text-align: right;" | 1366.00
 +
| style="text-align: right;" | 1369.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-02-03
 +
| Fracture
 +
| style="text-align: right;" | 1366.00
 +
| style="text-align: right;" | 1369.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-02-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1356.00
 +
| style="text-align: right;" | 1364.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-02-12
 +
| Perforation
 +
| style="text-align: right;" | 1294.00
 +
| style="text-align: right;" | 1296.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-02-13
 +
| Perforation
 +
| style="text-align: right;" | 666.00
 +
| style="text-align: right;" | 670.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-02-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1284.00
 +
| style="text-align: right;" | 1292.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-02-17
 +
| Perforation
 +
| style="text-align: right;" | 655.50
 +
| style="text-align: right;" | 657.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-02-18
 +
| Fracture
 +
| style="text-align: right;" | 655.50
 +
| style="text-align: right;" | 657.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-03-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 642.00
 +
| style="text-align: right;" | 650.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-03-11
 +
| Perforation
 +
| style="text-align: right;" | 585.00
 +
| style="text-align: right;" | 587.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-03-11
 +
| Perforation
 +
| style="text-align: right;" | 574.00
 +
| style="text-align: right;" | 577.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-12-31
 +
| Perforation
 +
| style="text-align: right;" | 460.20
 +
| style="text-align: right;" | 462.90
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2008-12-31
 +
| Perforation
 +
| style="text-align: right;" | 477.10
 +
| style="text-align: right;" | 478.80
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2008-12-31
 +
| Perforation
 +
| style="text-align: right;" | 473.30
 +
| style="text-align: right;" | 475.80
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-03
 +
| Fracture
 +
| style="text-align: right;" | 460.20
 +
| style="text-align: right;" | 462.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-01-03
 +
| Fracture
 +
| style="text-align: right;" | 477.10
 +
| style="text-align: right;" | 478.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-01-03
 +
| Fracture
 +
| style="text-align: right;" | 473.30
 +
| style="text-align: right;" | 475.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-01-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 564.00
 +
| style="text-align: right;" | 572.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 238.00
 +
| style="text-align: right;" | 238.50
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 242.00
 +
| style="text-align: right;" | 242.50
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 234.40
 +
| style="text-align: right;" | 235.40
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 219.60
 +
| style="text-align: right;" | 220.60
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 221.00
 +
| style="text-align: right;" | 222.10
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 244.50
 +
| style="text-align: right;" | 245.50
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 343.90
 +
| style="text-align: right;" | 344.80
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 361.70
 +
| style="text-align: right;" | 362.20
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 337.30
 +
| style="text-align: right;" | 338.80
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 285.60
 +
| style="text-align: right;" | 287.70
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-10
 +
| Perforation
 +
| style="text-align: right;" | 326.10
 +
| style="text-align: right;" | 326.90
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 238.00
 +
| style="text-align: right;" | 238.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 242.00
 +
| style="text-align: right;" | 242.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 234.40
 +
| style="text-align: right;" | 235.40
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 1400.0m
+
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 219.60
 +
| style="text-align: right;" | 220.60
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Coalbed Methane-Coals and Oth
+
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 221.00
 +
| style="text-align: right;" | 222.10
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Flowing
+
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 244.50
 +
| style="text-align: right;" | 245.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 343.90
 +
| style="text-align: right;" | 344.80
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 361.70
 +
| style="text-align: right;" | 362.20
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 51.75365800000002992
+
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 337.30
 +
| style="text-align: right;" | 338.80
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -112.63505599999996321
+
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 285.60
 +
| style="text-align: right;" | 287.40
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2009-01-11
 +
| Fracture
 +
| style="text-align: right;" | 326.10
 +
| style="text-align: right;" | 326.90
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 7802
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8550
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 8315
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8218
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 4995
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 6222
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 3132
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 7979
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 7750
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 2879
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 22:27, 11 July 2020

Well Details

Well ID: 0324192102003
Loading map...
Location: 00/02-21-032-19W4/3
Location Alias: 00/02-21-32-19 W4M
Location Alias 2: 00/02-21-032-19 W4/03
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 19
Section: 21
County/Municipality: Starland County
Well Name: TEAC DELIA 2-21-32-19
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0209368
License Date: 1997-11-26
License Status: Issued
Spud Date: 1998-01-20
Final Drill Date: 1998-01-24
Well Total Depth: 1400.00 m
Surface Hole Latitude: 51.753658
Surface Hole Longitude: -112.635056

For data sources see[1][2]

Well History

Date Event
1997-11-26 Obtained License
1998-01-21 Surface Casing Operation Performed
1998-01-24 Drill Stem Test Performed
1998-01-24 Finished Drilling
1998-01-24 Well Log Performed
1998-01-24 Well Mode changed to Drilled and Cased
1998-01-25 Drill Stem Test Performed
1998-01-26 Production Casing Operation Performed
1998-01-26 Rig Released
1998-02-03 Perforation Treatment Performed - Fractured
1998-02-03 Perforation Treatment Performed - Jet Perforation
1998-02-03 Well Log Performed
1998-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-12 Perforation Treatment Performed - Jet Perforation
1998-02-12 Plug Back Performed
1998-02-13 Perforation Treatment Performed - Jet Perforation
1998-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-17 Perforation Treatment Performed - Jet Perforation
1998-02-17 Plug Back Performed
1998-02-18 Perforation Treatment Performed - Fractured
1998-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-11 Perforation Treatment Performed - Jet Perforation
1998-03-11 Plug Back Performed
2008-12-31 Perforation Treatment Performed - Jet Perforation
2009-01-03 Perforation Treatment Performed - Fractured
2009-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-09 Plug Back Performed
2009-01-10 Perforation Treatment Performed - Jet Perforation
2009-01-10 Well Log Performed
2009-01-11 Perforation Treatment Performed - Fractured
2009-01-20 Well Log Performed
2009-02-04 Well Began Production
2009-02-04 Well Fluid changed to Coalbed Methane-Coals and Other
2009-02-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-03 Perforation 1366.00 1369.00 13
1998-02-03 Fracture 1366.00 1369.00 0
1998-02-12 Packing Device Capped w/Cement 1356.00 1364.00 0
1998-02-12 Perforation 1294.00 1296.00 13
1998-02-13 Perforation 666.00 670.00 13
1998-02-17 Packing Device Capped w/Cement 1284.00 1292.00 0
1998-02-17 Perforation 655.50 657.50 13
1998-02-18 Fracture 655.50 657.50 0
1998-03-11 Packing Device Capped w/Cement 642.00 650.00 0
1998-03-11 Perforation 585.00 587.00 13
1998-03-11 Perforation 574.00 577.00 13
2008-12-31 Perforation 460.20 462.90 20
2008-12-31 Perforation 477.10 478.80 20
2008-12-31 Perforation 473.30 475.80 20
2009-01-03 Fracture 460.20 462.90 0
2009-01-03 Fracture 477.10 478.80 0
2009-01-03 Fracture 473.30 475.80 0
2009-01-09 Packing Device Capped w/Cement 564.00 572.00 0
2009-01-10 Perforation 238.00 238.50 20
2009-01-10 Perforation 242.00 242.50 20
2009-01-10 Perforation 234.40 235.40 20
2009-01-10 Perforation 219.60 220.60 20
2009-01-10 Perforation 221.00 222.10 20
2009-01-10 Perforation 244.50 245.50 20
2009-01-10 Perforation 343.90 344.80 20
2009-01-10 Perforation 361.70 362.20 20
2009-01-10 Perforation 337.30 338.80 20
2009-01-10 Perforation 285.60 287.70 20
2009-01-10 Perforation 326.10 326.90 20
2009-01-11 Fracture 238.00 238.50 0
2009-01-11 Fracture 242.00 242.50 0
2009-01-11 Fracture 234.40 235.40 0
2009-01-11 Fracture 219.60 220.60 0
2009-01-11 Fracture 221.00 222.10 0
2009-01-11 Fracture 244.50 245.50 0
2009-01-11 Fracture 343.90 344.80 0
2009-01-11 Fracture 361.70 362.20 0
2009-01-11 Fracture 337.30 338.80 0
2009-01-11 Fracture 285.60 287.40 0
2009-01-11 Fracture 326.10 326.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7802 0.0 0.0 0.0
2010 8550 0.0 0.0 0.0
2011 8315 0.0 0.0 0.0
2012 8218 0.0 0.0 0.0
2013 4995 0.0 0.0 0.0
2014 6222 0.0 0.0 0.0
2015 3132 0.0 0.0 0.0
2016 7979 0.0 0.0 0.0
2017 7750 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References