X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0826053303004"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0826053303004
 
| Well ID: 0826053303004
| style="height=100%; align=center" rowspan="14" | {{#display_map: 56.14804, -118.723474 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 56.148040, -118.723474 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/03-33-082-05W6/4
 
| Location: 00/03-33-082-05W6/4
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/03-33-082-05 W6/04
 
| Location Alias 2: 00/03-33-082-05 W6/04
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 082
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 05
 +
|-
 +
| Section: 33
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Fairview No. 136,_Alberta|Municipal District of Fairview No. 136]]
 
| County/Municipality: [[Municipal District of Fairview No. 136,_Alberta|Municipal District of Fairview No. 136]]
Line 17: Line 27:
 
| Well Name: SABRETOOTHENG GEORGE 3-33-82-5
 
| Well Name: SABRETOOTHENG GEORGE 3-33-82-5
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cequence Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0380826
 
| License Number: 0380826
Line 29: Line 39:
 
| Final Drill Date: 2007-09-13
 
| Final Drill Date: 2007-09-13
 
|-
 
|-
| Well Total Depth: 1537 m
+
| Well Total Depth: 1537.00 m
 
|-
 
|-
| Surface Hole Latitude: 56.14804
+
| Surface Hole Latitude: 56.148040
 
|-
 
|-
 
| Surface Hole Longitude: -118.723474
 
| Surface Hole Longitude: -118.723474
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2007-08-22
 +
| Obtained License
 +
|-
 +
| 2007-09-07
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2007-09-13
 +
| Finished Drilling
 +
|-
 +
| 2007-09-13
 +
| Well Log Performed
 +
|-
 +
| 2007-09-13
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2007-09-15
 +
| Drill Stem Test Performed
 +
|-
 +
| 2007-09-16
 +
| Production Casing Operation Performed
 +
|-
 +
| 2007-09-16
 +
| Rig Released
 +
|-
 +
| 2007-09-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-12-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-01-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-01-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-03-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2008-03-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2008-03-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-02-26
 +
| Plug Back Performed
 +
|-
 +
| 2012-02-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-02-27
 +
| Plug Back Performed
 +
|-
 +
| 2012-02-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-02-28
 +
| Plug Back Performed
 +
|-
 +
| 2012-02-28
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2012-03-07
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 165:
 
| 2007-09-20
 
| 2007-09-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1471
+
| style="text-align: right;" | 1471.00
| style="text-align: right;" | 1473.3
+
| style="text-align: right;" | 1473.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2007-12-07
 
| 2007-12-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1420
+
| style="text-align: right;" | 1420.00
| style="text-align: right;" | 1422
+
| style="text-align: right;" | 1422.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2008-01-07
 
| 2008-01-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 949.7
+
| style="text-align: right;" | 949.70
| style="text-align: right;" | 951.2
+
| style="text-align: right;" | 951.20
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2008-01-09
 
| 2008-01-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 932
+
| style="text-align: right;" | 932.00
| style="text-align: right;" | 932.5
+
| style="text-align: right;" | 932.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2008-03-01
 
| 2008-03-01
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1420
+
| style="text-align: right;" | 1420.00
| style="text-align: right;" | 1422
+
| style="text-align: right;" | 1422.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-03-03
 
| 2008-03-03
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 949.7
+
| style="text-align: right;" | 949.70
| style="text-align: right;" | 951.2
+
| style="text-align: right;" | 951.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-03-03
 
| 2008-03-03
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 932
+
| style="text-align: right;" | 932.00
| style="text-align: right;" | 932.5
+
| style="text-align: right;" | 932.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-03-04
 
| 2008-03-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1068.4
+
| style="text-align: right;" | 1068.40
| style="text-align: right;" | 1069.3
+
| style="text-align: right;" | 1069.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2012-02-26
 
| 2012-02-26
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1457
+
| style="text-align: right;" | 1457.00
| style="text-align: right;" | 1465
+
| style="text-align: right;" | 1465.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-27
 
| 2012-02-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1052
+
| style="text-align: right;" | 1052.00
| style="text-align: right;" | 1060
+
| style="text-align: right;" | 1060.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-27
 
| 2012-02-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1404
+
| style="text-align: right;" | 1404.00
| style="text-align: right;" | 1412
+
| style="text-align: right;" | 1412.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-28
 
| 2012-02-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 937
+
| style="text-align: right;" | 937.00
| style="text-align: right;" | 945
+
| style="text-align: right;" | 945.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-28
 
| 2012-02-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 917
+
| style="text-align: right;" | 917.00
| style="text-align: right;" | 925
+
| style="text-align: right;" | 925.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 154: Line 245:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 07:10, 12 July 2020

Well Details

Well ID: 0826053303004
Loading map...
Location: 00/03-33-082-05W6/4
Location Alias: 00/03-33-82-05 W6M
Location Alias 2: 00/03-33-082-05 W6/04
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 05
Section: 33
County/Municipality: Municipal District of Fairview No. 136
Well Name: SABRETOOTHENG GEORGE 3-33-82-5
Operator Name: Cequence Energy Ltd.
License Number: 0380826
License Date: 2007-08-22
License Status: Abandoned
Spud Date: 2007-09-06
Final Drill Date: 2007-09-13
Well Total Depth: 1537.00 m
Surface Hole Latitude: 56.148040
Surface Hole Longitude: -118.723474

For data sources see[1][2]

Well History

Date Event
2007-08-22 Obtained License
2007-09-07 Surface Casing Operation Performed
2007-09-13 Finished Drilling
2007-09-13 Well Log Performed
2007-09-13 Well Mode changed to Drilled and Cased
2007-09-15 Drill Stem Test Performed
2007-09-16 Production Casing Operation Performed
2007-09-16 Rig Released
2007-09-20 Perforation Treatment Performed - Jet Perforation
2007-12-07 Perforation Treatment Performed - Jet Perforation
2008-01-07 Perforation Treatment Performed - Jet Perforation
2008-01-09 Perforation Treatment Performed - Jet Perforation
2008-03-01 Perforation Treatment Performed - Cement Squeeze
2008-03-03 Perforation Treatment Performed - Cement Squeeze
2008-03-04 Perforation Treatment Performed - Jet Perforation
2012-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-26 Plug Back Performed
2012-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-27 Plug Back Performed
2012-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-28 Plug Back Performed
2012-02-28 Well Mode changed to Abandoned Zone
2012-03-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-09-20 Perforation 1471.00 1473.30 17
2007-12-07 Perforation 1420.00 1422.00 17
2008-01-07 Perforation 949.70 951.20 17
2008-01-09 Perforation 932.00 932.50 17
2008-03-01 Cement Squeeze 1420.00 1422.00 0
2008-03-03 Cement Squeeze 949.70 951.20 0
2008-03-03 Cement Squeeze 932.00 932.50 0
2008-03-04 Perforation 1068.40 1069.30 17
2012-02-26 Packing Device Capped w/Cement 1457.00 1465.00 0
2012-02-27 Packing Device Capped w/Cement 1052.00 1060.00 0
2012-02-27 Packing Device Capped w/Cement 1404.00 1412.00 0
2012-02-28 Packing Device Capped w/Cement 937.00 945.00 0
2012-02-28 Packing Device Capped w/Cement 917.00 925.00 0

For data sources see[4]



References