X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0504263616002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0504263616002
 
| Well ID: 0504263616002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.364982, -113.662518 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.364982, -113.662518 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-36-050-26W4/2
 
| Location: 00/16-36-050-26W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/16-36-050-26 W4/02
 
| Location Alias 2: 00/16-36-050-26 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 
|-
 
|-
| County/Municipality: [[Leduc County,_Alberta|Leduc County]]
+
| Township: 050
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 36
 +
|-
 +
| County/Municipality: [[Edmonton,_Alberta|Edmonton]]
 
|-
 
|-
 
| Well Name: MEC LEDUC-WB 16-36-50-26
 
| Well Name: MEC LEDUC-WB 16-36-50-26
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[NEP Canada ULC]]
 
|-
 
|-
 
| License Number: 0004135
 
| License Number: 0004135
Line 29: Line 39:
 
| Final Drill Date: 1952-03-01
 
| Final Drill Date: 1952-03-01
 
|-
 
|-
| Well Total Depth: 1619.4 m
+
| Well Total Depth: 1619.40 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.364982
 
| Surface Hole Latitude: 53.364982
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1952-01-25
 +
| Obtained License
 +
|-
 +
| 1952-02-14
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-02-21
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-02-26
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1952-03-01
 +
| Finished Drilling
 +
|-
 +
| 1952-03-01
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1952-03-06
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1952-03-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1952-03-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1952-03-08
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1982-07-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1982-07-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-07-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1987-03-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-03-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1993-03-24
 +
| Well Log Performed
 +
|-
 +
| 1993-04-21
 +
| Well Log Performed
 +
|-
 +
| 1993-04-22
 +
| Well Log Performed
 +
|-
 +
| 1993-08-15
 +
| Well Log Performed
 +
|-
 +
| 1993-08-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-08-20
 +
| Well Log Performed
 +
|-
 +
| 1993-09-01
 +
| Well Log Performed
 +
|-
 +
| 1993-09-18
 +
| Well Log Performed
 +
|-
 +
| 1993-09-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-09-21
 +
| Well Log Performed
 +
|-
 +
| 1993-09-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1994-02-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-02-08
 +
| Well Log Performed
 +
|-
 +
| 1994-02-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1994-02-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-07-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-07-13
 +
| Plug Back Performed
 +
|-
 +
| 1999-07-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-07-14
 +
| Well Log Performed
 +
|-
 +
| 1999-07-22
 +
| Well Began Production
 +
|-
 +
| 1999-07-22
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1999-07-22
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1999-10-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-11-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-11-19
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1999-11-24
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1999-11-24
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2001-04-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2001-04-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2002-03-06
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2002-03-06
 +
| Plug Back Performed
 +
|-
 +
| 2002-03-06
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2002-03-06
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2002-03-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2002-03-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2002-03-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-03-25
 +
| Plug Back Performed
 +
|-
 +
| 2002-07-16
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 264:
 
| 1952-03-06
 
| 1952-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1615.7
+
| style="text-align: right;" | 1615.70
| style="text-align: right;" | 1617.3
+
| style="text-align: right;" | 1617.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1952-03-06
 
| 1952-03-06
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 1615.7
+
| style="text-align: right;" | 1615.70
| style="text-align: right;" | 1617.3
+
| style="text-align: right;" | 1617.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-03-07
 
| 1952-03-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1615.7
+
| style="text-align: right;" | 1615.70
| style="text-align: right;" | 1617.3
+
| style="text-align: right;" | 1617.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1952-03-08
 
| 1952-03-08
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 1615.7
+
| style="text-align: right;" | 1615.70
| style="text-align: right;" | 1617.3
+
| style="text-align: right;" | 1617.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-07-05
 
| 1982-07-05
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1615.7
+
| style="text-align: right;" | 1615.70
| style="text-align: right;" | 1617.3
+
| style="text-align: right;" | 1617.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-07-10
 
| 1982-07-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1615.5
+
| style="text-align: right;" | 1615.50
| style="text-align: right;" | 1615.7
+
| style="text-align: right;" | 1615.70
 
| style="text-align: right;" | 10
 
| style="text-align: right;" | 10
 
|-
 
|-
 
| 1982-07-11
 
| 1982-07-11
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1615.5
+
| style="text-align: right;" | 1615.50
| style="text-align: right;" | 1615.7
+
| style="text-align: right;" | 1615.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-03-02
 
| 1987-03-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1615.3
+
| style="text-align: right;" | 1615.30
| style="text-align: right;" | 1615.5
+
| style="text-align: right;" | 1615.50
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1987-03-03
 
| 1987-03-03
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1615.3
+
| style="text-align: right;" | 1615.30
| style="text-align: right;" | 1615.7
+
| style="text-align: right;" | 1615.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-08-16
 
| 1993-08-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1555.5
+
| style="text-align: right;" | 1555.50
| style="text-align: right;" | 1558.5
+
| style="text-align: right;" | 1558.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1993-09-21
 
| 1993-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1559
+
| style="text-align: right;" | 1559.00
| style="text-align: right;" | 1561.5
+
| style="text-align: right;" | 1561.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-09-22
 
| 1993-09-22
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1559
+
| style="text-align: right;" | 1559.00
| style="text-align: right;" | 1561.5
+
| style="text-align: right;" | 1561.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-02-08
 
| 1994-02-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1563
+
| style="text-align: right;" | 1563.00
| style="text-align: right;" | 1567.5
+
| style="text-align: right;" | 1567.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-02-09
 
| 1994-02-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1572.5
+
| style="text-align: right;" | 1572.50
| style="text-align: right;" | 1575
+
| style="text-align: right;" | 1575.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-02-09
 
| 1994-02-09
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1563
+
| style="text-align: right;" | 1563.00
| style="text-align: right;" | 1575
+
| style="text-align: right;" | 1575.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-07-13
 
| 1999-07-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1540
+
| style="text-align: right;" | 1540.00
| style="text-align: right;" | 1548
+
| style="text-align: right;" | 1548.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-07-14
 
| 1999-07-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1273.5
+
| style="text-align: right;" | 1273.50
| style="text-align: right;" | 1277.5
+
| style="text-align: right;" | 1277.50
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1999-10-12
 
| 1999-10-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1277.5
+
| style="text-align: right;" | 1277.50
| style="text-align: right;" | 1279.5
+
| style="text-align: right;" | 1279.50
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1999-11-18
 
| 1999-11-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1139
+
| style="text-align: right;" | 1139.00
| style="text-align: right;" | 1144
+
| style="text-align: right;" | 1144.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1999-11-19
 
| 1999-11-19
| Fracture  
+
| Fracture
| style="text-align: right;" | 1139
+
| style="text-align: right;" | 1139.00
| style="text-align: right;" | 1144
+
| style="text-align: right;" | 1144.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-06
 
| 2002-03-06
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1273.5
+
| style="text-align: right;" | 1273.50
| style="text-align: right;" | 1279.5
+
| style="text-align: right;" | 1279.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-06
 
| 2002-03-06
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1139
+
| style="text-align: right;" | 1139.00
| style="text-align: right;" | 1144
+
| style="text-align: right;" | 1144.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-15
 
| 2002-03-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1455
+
| style="text-align: right;" | 1455.00
| style="text-align: right;" | 1459
+
| style="text-align: right;" | 1459.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2002-03-15
 
| 2002-03-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1466
+
| style="text-align: right;" | 1466.00
| style="text-align: right;" | 1467
+
| style="text-align: right;" | 1467.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2002-03-15
 
| 2002-03-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1468.5
+
| style="text-align: right;" | 1468.50
| style="text-align: right;" | 1472.5
+
| style="text-align: right;" | 1472.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2002-03-19
 
| 2002-03-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1455
+
| style="text-align: right;" | 1455.00
| style="text-align: right;" | 1459
+
| style="text-align: right;" | 1459.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-19
 
| 2002-03-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1466
+
| style="text-align: right;" | 1466.00
| style="text-align: right;" | 1467
+
| style="text-align: right;" | 1467.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-19
 
| 2002-03-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1468.5
+
| style="text-align: right;" | 1468.50
| style="text-align: right;" | 1472.5
+
| style="text-align: right;" | 1472.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-20
 
| 2002-03-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1492
+
| style="text-align: right;" | 1492.00
| style="text-align: right;" | 1494
+
| style="text-align: right;" | 1494.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2002-03-21
 
| 2002-03-21
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1492
+
| style="text-align: right;" | 1492.00
| style="text-align: right;" | 1494
+
| style="text-align: right;" | 1494.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-25
 
| 2002-03-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1259
+
| style="text-align: right;" | 1259.00
| style="text-align: right;" | 1267
+
| style="text-align: right;" | 1267.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-25
 
| 2002-03-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1125.5
+
| style="text-align: right;" | 1125.50
| style="text-align: right;" | 1133.5
+
| style="text-align: right;" | 1133.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-25
 
| 2002-03-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1440
+
| style="text-align: right;" | 1440.00
| style="text-align: right;" | 1448
+
| style="text-align: right;" | 1448.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 274: Line 464:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 307: Line 511:
 
| 1999
 
| 1999
 
| style="text-align: right;" | 2422
 
| style="text-align: right;" | 2422
| style="text-align: right;" | 615.9
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 315: Line 519:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 13:28, 12 July 2020

Well Details

Well ID: 0504263616002
Loading map...
Location: 00/16-36-050-26W4/2
Location Alias: 00/16-36-50-26 W4M
Location Alias 2: 00/16-36-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: MEC LEDUC-WB 16-36-50-26
Operator Name: NEP Canada ULC
License Number: 0004135
License Date: 1952-01-25
License Status: RecCertified
Spud Date: 1952-01-28
Final Drill Date: 1952-03-01
Well Total Depth: 1619.40 m
Surface Hole Latitude: 53.364982
Surface Hole Longitude: -113.662518

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-01-25 Obtained License
1952-02-14 Drill Stem Test Performed
1952-02-21 Drill Stem Test Performed
1952-02-26 Liner Casing Operation Performed
1952-03-01 Finished Drilling
1952-03-01 Well Mode changed to Drilled and Cased
1952-03-06 Perforation Treatment Performed - Acid Wash - No Pressure
1952-03-06 Perforation Treatment Performed - Jet Perforation
1952-03-07 Perforation Treatment Performed - Jet Perforation
1952-03-08 Perforation Treatment Performed - Acid Wash - No Pressure
1982-07-05 Perforation Treatment Performed - Cement Squeeze
1982-07-10 Perforation Treatment Performed - Jet Perforation
1982-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-02 Perforation Treatment Performed - Jet Perforation
1987-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-24 Well Log Performed
1993-04-21 Well Log Performed
1993-04-22 Well Log Performed
1993-08-15 Well Log Performed
1993-08-16 Perforation Treatment Performed - Jet Perforation
1993-08-20 Well Log Performed
1993-09-01 Well Log Performed
1993-09-18 Well Log Performed
1993-09-21 Perforation Treatment Performed - Jet Perforation
1993-09-21 Well Log Performed
1993-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-08 Perforation Treatment Performed - Jet Perforation
1994-02-08 Well Log Performed
1994-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-09 Perforation Treatment Performed - Jet Perforation
1999-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-13 Plug Back Performed
1999-07-14 Perforation Treatment Performed - Jet Perforation
1999-07-14 Well Log Performed
1999-07-22 Well Began Production
1999-07-22 Well Fluid changed to Gas
1999-07-22 Well Mode changed to Flowing
1999-10-12 Perforation Treatment Performed - Jet Perforation
1999-11-18 Perforation Treatment Performed - Jet Perforation
1999-11-19 Perforation Treatment Performed - Fractured
1999-11-24 Well Fluid changed to Gas
1999-11-24 Well Mode changed to Flowing
2001-04-01 Well Fluid changed to Gas
2001-04-01 Well Mode changed to Suspended
2002-03-06 Perforation Treatment Performed - Cement Squeeze
2002-03-06 Plug Back Performed
2002-03-06 Well Fluid changed to Gas
2002-03-06 Well Mode changed to Abandoned Zone
2002-03-15 Perforation Treatment Performed - Jet Perforation
2002-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-20 Perforation Treatment Performed - Jet Perforation
2002-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-25 Plug Back Performed
2002-07-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-06 Perforation 1615.70 1617.30 13
1952-03-06 Acid Wash 1615.70 1617.30 0
1952-03-07 Perforation 1615.70 1617.30 13
1952-03-08 Acid Wash 1615.70 1617.30 0
1982-07-05 Cement Squeeze 1615.70 1617.30 0
1982-07-10 Perforation 1615.50 1615.70 10
1982-07-11 Acid Treatment 1615.50 1615.70 0
1987-03-02 Perforation 1615.30 1615.50 3
1987-03-03 Acid Treatment 1615.30 1615.70 0
1993-08-16 Perforation 1555.50 1558.50 14
1993-09-21 Perforation 1559.00 1561.50 13
1993-09-22 Acid Treatment 1559.00 1561.50 0
1994-02-08 Perforation 1563.00 1567.50 13
1994-02-09 Perforation 1572.50 1575.00 13
1994-02-09 Acid Treatment 1563.00 1575.00 0
1999-07-13 Packing Device Capped w/Cement 1540.00 1548.00 0
1999-07-14 Perforation 1273.50 1277.50 18
1999-10-12 Perforation 1277.50 1279.50 18
1999-11-18 Perforation 1139.00 1144.00 14
1999-11-19 Fracture 1139.00 1144.00 0
2002-03-06 Cement Squeeze 1273.50 1279.50 0
2002-03-06 Cement Squeeze 1139.00 1144.00 0
2002-03-15 Perforation 1455.00 1459.00 17
2002-03-15 Perforation 1466.00 1467.00 17
2002-03-15 Perforation 1468.50 1472.50 17
2002-03-19 Acid Treatment 1455.00 1459.00 0
2002-03-19 Acid Treatment 1466.00 1467.00 0
2002-03-19 Acid Treatment 1468.50 1472.50 0
2002-03-20 Perforation 1492.00 1494.00 17
2002-03-21 Acid Treatment 1492.00 1494.00 0
2002-03-25 Packing Device Capped w/Cement 1259.00 1267.00 0
2002-03-25 Packing Device Capped w/Cement 1125.50 1133.50 0
2002-03-25 Packing Device Capped w/Cement 1440.00 1448.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2422 0.0 0.0 0.0

For data sources see[5]

References