X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0514110902006"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0514110902006
 
| Well ID: 0514110902006
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.382943, -111.561057 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.382943, -111.561057 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/02-09-051-11W4/6
 
| Location: 00/02-09-051-11W4/6
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/02-09-051-11 W4/06
 
| Location Alias 2: 00/02-09-051-11 W4/06
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 051
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 11
 +
|-
 +
| Section: 09
 
|-
 
|-
 
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
 
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
Line 17: Line 27:
 
| Well Name: MONTANE BIRCH 2-9-51-11
 
| Well Name: MONTANE BIRCH 2-9-51-11
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Canadian Coyote Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0409523
 
| License Number: 0409523
Line 23: Line 33:
 
| License Date: 2009-03-04
 
| License Date: 2009-03-04
 
|-
 
|-
| License Status: Amended
+
| License Status: Abandoned
 
|-
 
|-
 
| Spud Date: 2009-03-08
 
| Spud Date: 2009-03-08
Line 29: Line 39:
 
| Final Drill Date: 2009-03-11
 
| Final Drill Date: 2009-03-11
 
|-
 
|-
| Well Total Depth: 793 m
+
| Well Total Depth: 793.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.382943
 
| Surface Hole Latitude: 53.382943
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-03-04
 +
| Obtained License
 +
|-
 +
| 2009-03-09
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2009-03-10
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2009-03-11
 +
| Finished Drilling
 +
|-
 +
| 2009-03-11
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2009-03-12
 +
| Production Casing Operation Performed
 +
|-
 +
| 2009-03-12
 +
| Rig Released
 +
|-
 +
| 2009-03-12
 +
| Well Log Performed
 +
|-
 +
| 2009-03-20
 +
| Well Log Performed
 +
|-
 +
| 2009-03-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-03-31
 +
| Well Log Performed
 +
|-
 +
| 2009-04-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-02-15
 +
| Well Log Performed
 +
|-
 +
| 2010-03-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-03-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-03-06
 +
| Plug Back Performed
 +
|-
 +
| 2010-03-06
 +
| Well Log Performed
 +
|-
 +
| 2010-06-21
 +
| Well Log Performed
 +
|-
 +
| 2010-08-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-08-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-08-20
 +
| Plug Back Performed
 +
|-
 +
| 2010-08-20
 +
| Well Log Performed
 +
|-
 +
| 2010-09-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-09-01
 +
| Well Log Performed
 +
|-
 +
| 2010-09-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-09-02
 +
| Well Log Performed
 +
|-
 +
| 2018-12-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2018-12-18
 +
| Plug Back Performed
 +
|-
 +
| 2018-12-19
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2018-12-19
 +
| Plug Back Performed
 +
|-
 +
| 2018-12-19
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2019-03-15
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 181:
 
|-
 
|-
 
| 2009-03-10
 
| 2009-03-10
| style="text-align: right;" | 276
+
| style="text-align: right;" | 276.00
 
+
| Deviate (5 - 79 degrees)
 
|-
 
|-
 
|}
 
|}
Line 70: Line 188:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 201:
 
| 2009-03-23
 
| 2009-03-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 749
+
| style="text-align: right;" | 749.00
| style="text-align: right;" | 750
+
| style="text-align: right;" | 750.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-03-23
 
| 2009-03-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 755
+
| style="text-align: right;" | 755.00
| style="text-align: right;" | 756
+
| style="text-align: right;" | 756.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-03-23
 
| 2009-03-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 759
+
| style="text-align: right;" | 759.00
| style="text-align: right;" | 760
+
| style="text-align: right;" | 760.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-04-01
 
| 2009-04-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 719
+
| style="text-align: right;" | 719.00
| style="text-align: right;" | 721
+
| style="text-align: right;" | 721.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-04-01
 
| 2009-04-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 723.5
+
| style="text-align: right;" | 723.50
| style="text-align: right;" | 725
+
| style="text-align: right;" | 725.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-04-01
 
| 2009-04-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 728
+
| style="text-align: right;" | 728.00
| style="text-align: right;" | 729.5
+
| style="text-align: right;" | 729.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-03-06
 
| 2010-03-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 739
+
| style="text-align: right;" | 739.00
| style="text-align: right;" | 747
+
| style="text-align: right;" | 747.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-03-06
 
| 2010-03-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 709
+
| style="text-align: right;" | 709.00
| style="text-align: right;" | 717
+
| style="text-align: right;" | 717.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-03-06
 
| 2010-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 679.5
+
| style="text-align: right;" | 679.50
| style="text-align: right;" | 681.5
+
| style="text-align: right;" | 681.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-08-20
 
| 2010-08-20
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 670
+
| style="text-align: right;" | 670.00
| style="text-align: right;" | 678
+
| style="text-align: right;" | 678.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-08-20
 
| 2010-08-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 594
+
| style="text-align: right;" | 594.00
| style="text-align: right;" | 597
+
| style="text-align: right;" | 597.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-09-01
 
| 2010-09-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 385
+
| style="text-align: right;" | 385.00
| style="text-align: right;" | 387
+
| style="text-align: right;" | 387.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2010-09-02
 
| 2010-09-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 111
+
| style="text-align: right;" | 111.00
| style="text-align: right;" | 113.5
+
| style="text-align: right;" | 113.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 +
|-
 +
| 2018-12-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 577.30
 +
| style="text-align: right;" | 586.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-12-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 372.50
 +
| style="text-align: right;" | 381.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-12-19
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 97.80
 +
| style="text-align: right;" | 106.80
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 163: Line 299:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 196: Line 346:
 
|}-->
 
|}-->
  
<!--== Occurences ==
+
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Occurence Date
 
!scope="col" | Occurence Date
Line 203: Line 353:
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
|}-->
+
| 2018-12-17
 
+
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2018-12-18
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2018-12-19
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 01:19, 13 July 2020

Well Details

Well ID: 0514110902006
Loading map...
Location: 00/02-09-051-11W4/6
Location Alias: 00/02-09-51-11 W4M
Location Alias 2: 00/02-09-051-11 W4/06
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 11
Section: 09
County/Municipality: County of Minburn No. 27
Well Name: MONTANE BIRCH 2-9-51-11
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0409523
License Date: 2009-03-04
License Status: Abandoned
Spud Date: 2009-03-08
Final Drill Date: 2009-03-11
Well Total Depth: 793.00 m
Surface Hole Latitude: 53.382943
Surface Hole Longitude: -111.561057

For data sources see[1][2]

Well History

Date Event
2009-03-04 Obtained License
2009-03-09 Surface Casing Operation Performed
2009-03-10 Direction Drilling Operation Performed - Deviate
2009-03-11 Finished Drilling
2009-03-11 Well Mode changed to Drilled and Cased
2009-03-12 Production Casing Operation Performed
2009-03-12 Rig Released
2009-03-12 Well Log Performed
2009-03-20 Well Log Performed
2009-03-23 Perforation Treatment Performed - Jet Perforation
2009-03-31 Well Log Performed
2009-04-01 Perforation Treatment Performed - Jet Perforation
2010-02-15 Well Log Performed
2010-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-06 Perforation Treatment Performed - Jet Perforation
2010-03-06 Plug Back Performed
2010-03-06 Well Log Performed
2010-06-21 Well Log Performed
2010-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-20 Perforation Treatment Performed - Jet Perforation
2010-08-20 Plug Back Performed
2010-08-20 Well Log Performed
2010-09-01 Perforation Treatment Performed - Jet Perforation
2010-09-01 Well Log Performed
2010-09-02 Perforation Treatment Performed - Jet Perforation
2010-09-02 Well Log Performed
2018-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-18 Plug Back Performed
2018-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-19 Plug Back Performed
2018-12-19 Well Mode changed to Abandoned Zone
2019-03-15 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-03-10 276.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-23 Perforation 749.00 750.00 17
2009-03-23 Perforation 755.00 756.00 17
2009-03-23 Perforation 759.00 760.00 17
2009-04-01 Perforation 719.00 721.00 17
2009-04-01 Perforation 723.50 725.00 17
2009-04-01 Perforation 728.00 729.50 17
2010-03-06 Packing Device Capped w/Cement 739.00 747.00 0
2010-03-06 Packing Device Capped w/Cement 709.00 717.00 0
2010-03-06 Perforation 679.50 681.50 17
2010-08-20 Packing Device Capped w/Cement 670.00 678.00 0
2010-08-20 Perforation 594.00 597.00 17
2010-09-01 Perforation 385.00 387.00 17
2010-09-02 Perforation 111.00 113.50 17
2018-12-18 Packing Device Capped w/Cement 577.30 586.30 0
2018-12-18 Packing Device Capped w/Cement 372.50 381.50 0
2018-12-19 Packing Device Capped w/Cement 97.80 106.80 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-17 No Incident Encountered 0.00 0.00
2018-12-18 No Incident Encountered 0.00 0.00
2018-12-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References