X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0234250707002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0234250707002
 
| Well ID: 0234250707002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.94136, -113.47871 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.941360, -113.47871 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-07-023-25W4/2
 
| Location: 00/07-07-023-25W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/07-07-023-25 W4/02
 
| Location Alias 2: 00/07-07-023-25 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 023
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 07
 
|-
 
|-
 
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 
|-
 
|-
| Well Name: EMBER ENTICE 7-7-23-25
+
| Well Name: PERSIST OIL ENTICE 7-7-23-25
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Persist Oil And Gas Inc.]]
 
|-
 
|-
 
| License Number: 0204508
 
| License Number: 0204508
Line 29: Line 39:
 
| Final Drill Date: 1997-08-29
 
| Final Drill Date: 1997-08-29
 
|-
 
|-
| Well Total Depth: 1860 m
+
| Well Total Depth: 1860.00 m
 
|-
 
|-
| Surface Hole Latitude: 50.94136
+
| Surface Hole Latitude: 50.941360
 
|-
 
|-
 
| Surface Hole Longitude: -113.47871
 
| Surface Hole Longitude: -113.47871
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1997-08-06
 +
| Obtained License
 +
|-
 +
| 1997-08-23
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1997-08-28
 +
| Well Log Performed
 +
|-
 +
| 1997-08-29
 +
| Finished Drilling
 +
|-
 +
| 1997-08-29
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1997-08-31
 +
| Well Log Performed
 +
|-
 +
| 1997-09-01
 +
| Production Casing Operation Performed
 +
|-
 +
| 1997-09-01
 +
| Rig Released
 +
|-
 +
| 1997-10-25
 +
| Well Log Performed
 +
|-
 +
| 1997-10-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1997-11-29
 +
| Well Log Performed
 +
|-
 +
| 1997-12-09
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1998-12-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1998-12-16
 +
| Plug Back Performed
 +
|-
 +
| 1998-12-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-12-18
 +
| Well Log Performed
 +
|-
 +
| 1999-01-03
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1999-03-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-03-07
 +
| Plug Back Performed
 +
|-
 +
| 1999-03-07
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1999-03-08
 +
| Well Log Performed
 +
|-
 +
| 1999-03-09
 +
| Well Log Performed
 +
|-
 +
| 1999-03-15
 +
| Well Log Performed
 +
|-
 +
| 1999-04-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-04-15
 +
| Well Log Performed
 +
|-
 +
| 1999-10-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-09-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-09-15
 +
| Well Log Performed
 +
|-
 +
| 2006-10-01
 +
| Well Log Performed
 +
|-
 +
| 2007-11-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-02-24
 +
| Well Log Performed
 +
|-
 +
| 2009-03-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-03-09
 +
| Well Log Performed
 +
|-
 +
| 2009-03-12
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 198:
 
| 1997-10-27
 
| 1997-10-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1802
+
| style="text-align: right;" | 1802.00
| style="text-align: right;" | 1806
+
| style="text-align: right;" | 1806.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1997-12-09
 
| 1997-12-09
| Fracture  
+
| Fracture
| style="text-align: right;" | 1802
+
| style="text-align: right;" | 1802.00
| style="text-align: right;" | 1806
+
| style="text-align: right;" | 1806.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-12-16
 
| 1998-12-16
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1785
+
| style="text-align: right;" | 1785.00
| style="text-align: right;" | 1793
+
| style="text-align: right;" | 1793.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-12-17
 
| 1998-12-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1525
+
| style="text-align: right;" | 1525.00
| style="text-align: right;" | 1527
+
| style="text-align: right;" | 1527.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1999-01-03
 
| 1999-01-03
| Fracture  
+
| Fracture
| style="text-align: right;" | 1525
+
| style="text-align: right;" | 1525.00
| style="text-align: right;" | 1527
+
| style="text-align: right;" | 1527.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-03-07
 
| 1999-03-07
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1510
+
| style="text-align: right;" | 1510.00
| style="text-align: right;" | 1518
+
| style="text-align: right;" | 1518.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-04-15
 
| 1999-04-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 924
+
| style="text-align: right;" | 924.00
| style="text-align: right;" | 929
+
| style="text-align: right;" | 929.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1999-10-17
 
| 1999-10-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 804
+
| style="text-align: right;" | 804.00
| style="text-align: right;" | 809
+
| style="text-align: right;" | 809.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2000-09-14
 
| 2000-09-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 371.5
+
| style="text-align: right;" | 371.50
| style="text-align: right;" | 374.5
+
| style="text-align: right;" | 374.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2007-11-07
 
| 2007-11-07
| Fracture  
+
| Fracture
| style="text-align: right;" | 804
+
| style="text-align: right;" | 804.00
| style="text-align: right;" | 809
+
| style="text-align: right;" | 809.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 641.5
+
| style="text-align: right;" | 641.50
| style="text-align: right;" | 642
+
| style="text-align: right;" | 642.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 630.5
+
| style="text-align: right;" | 630.50
| style="text-align: right;" | 631
+
| style="text-align: right;" | 631.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 625.7
+
| style="text-align: right;" | 625.70
| style="text-align: right;" | 626.2
+
| style="text-align: right;" | 626.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 622.9
+
| style="text-align: right;" | 622.90
| style="text-align: right;" | 623.9
+
| style="text-align: right;" | 623.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 578.6
+
| style="text-align: right;" | 578.60
| style="text-align: right;" | 581.6
+
| style="text-align: right;" | 581.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 576.9
+
| style="text-align: right;" | 576.90
| style="text-align: right;" | 577.4
+
| style="text-align: right;" | 577.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 557.3
+
| style="text-align: right;" | 557.30
| style="text-align: right;" | 557.8
+
| style="text-align: right;" | 557.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 542.4
+
| style="text-align: right;" | 542.40
| style="text-align: right;" | 543.4
+
| style="text-align: right;" | 543.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 492.7
+
| style="text-align: right;" | 492.70
| style="text-align: right;" | 493.7
+
| style="text-align: right;" | 493.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 487.7
+
| style="text-align: right;" | 487.70
| style="text-align: right;" | 489.7
+
| style="text-align: right;" | 489.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 477
+
| style="text-align: right;" | 477.00
| style="text-align: right;" | 479
+
| style="text-align: right;" | 479.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 468.9
+
| style="text-align: right;" | 468.90
| style="text-align: right;" | 469.9
+
| style="text-align: right;" | 469.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 467.9
+
| style="text-align: right;" | 467.90
| style="text-align: right;" | 468.4
+
| style="text-align: right;" | 468.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 463.9
+
| style="text-align: right;" | 463.90
| style="text-align: right;" | 464.4
+
| style="text-align: right;" | 464.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 461
+
| style="text-align: right;" | 461.00
| style="text-align: right;" | 462
+
| style="text-align: right;" | 462.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 458.1
+
| style="text-align: right;" | 458.10
| style="text-align: right;" | 459.1
+
| style="text-align: right;" | 459.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 445.7
+
| style="text-align: right;" | 445.70
| style="text-align: right;" | 446.2
+
| style="text-align: right;" | 446.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 431.5
+
| style="text-align: right;" | 431.50
| style="text-align: right;" | 432.5
+
| style="text-align: right;" | 432.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 344.7
+
| style="text-align: right;" | 344.70
| style="text-align: right;" | 345.2
+
| style="text-align: right;" | 345.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 309.6
+
| style="text-align: right;" | 309.60
| style="text-align: right;" | 310.1
+
| style="text-align: right;" | 310.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 302
+
| style="text-align: right;" | 302.00
| style="text-align: right;" | 303
+
| style="text-align: right;" | 303.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 300.5
+
| style="text-align: right;" | 300.50
| style="text-align: right;" | 301
+
| style="text-align: right;" | 301.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 295.1
+
| style="text-align: right;" | 295.10
| style="text-align: right;" | 295.6
+
| style="text-align: right;" | 295.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 290.6
+
| style="text-align: right;" | 290.60
| style="text-align: right;" | 291.1
+
| style="text-align: right;" | 291.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-06
 
| 2009-03-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 265
+
| style="text-align: right;" | 265.00
| style="text-align: right;" | 265.5
+
| style="text-align: right;" | 265.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-12
 
| 2009-03-12
| Fracture  
+
| Fracture
| style="text-align: right;" | 265
+
| style="text-align: right;" | 265.00
| style="text-align: right;" | 642
+
| style="text-align: right;" | 642.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 292: Line 416:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 08:18, 13 July 2020

Well Details

Well ID: 0234250707002
Loading map...
Location: 00/07-07-023-25W4/2
Location Alias: 00/07-07-23-25 W4M
Location Alias 2: 00/07-07-023-25 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 25
Section: 07
County/Municipality: Wheatland County
Well Name: PERSIST OIL ENTICE 7-7-23-25
Operator Name: Persist Oil And Gas Inc.
License Number: 0204508
License Date: 1997-08-06
License Status: Issued
Spud Date: 1997-08-21
Final Drill Date: 1997-08-29
Well Total Depth: 1860.00 m
Surface Hole Latitude: 50.941360
Surface Hole Longitude: -113.47871

For data sources see[1][2]

Well History

Date Event
1997-08-06 Obtained License
1997-08-23 Surface Casing Operation Performed
1997-08-28 Well Log Performed
1997-08-29 Finished Drilling
1997-08-29 Well Mode changed to Drilled and Cased
1997-08-31 Well Log Performed
1997-09-01 Production Casing Operation Performed
1997-09-01 Rig Released
1997-10-25 Well Log Performed
1997-10-27 Perforation Treatment Performed - Jet Perforation
1997-11-29 Well Log Performed
1997-12-09 Perforation Treatment Performed - Fractured
1998-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-16 Plug Back Performed
1998-12-17 Perforation Treatment Performed - Jet Perforation
1998-12-18 Well Log Performed
1999-01-03 Perforation Treatment Performed - Fractured
1999-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-07 Plug Back Performed
1999-03-07 Well Mode changed to Abandoned Zone
1999-03-08 Well Log Performed
1999-03-09 Well Log Performed
1999-03-15 Well Log Performed
1999-04-15 Perforation Treatment Performed - Jet Perforation
1999-04-15 Well Log Performed
1999-10-17 Perforation Treatment Performed - Jet Perforation
2000-09-14 Perforation Treatment Performed - Jet Perforation
2000-09-15 Well Log Performed
2006-10-01 Well Log Performed
2007-11-07 Perforation Treatment Performed - Fractured
2009-02-24 Well Log Performed
2009-03-06 Perforation Treatment Performed - Jet Perforation
2009-03-09 Well Log Performed
2009-03-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-27 Perforation 1802.00 1806.00 14
1997-12-09 Fracture 1802.00 1806.00 0
1998-12-16 Packing Device Capped w/Cement 1785.00 1793.00 0
1998-12-17 Perforation 1525.00 1527.00 7
1999-01-03 Fracture 1525.00 1527.00 0
1999-03-07 Packing Device Capped w/Cement 1510.00 1518.00 0
1999-04-15 Perforation 924.00 929.00 7
1999-10-17 Perforation 804.00 809.00 13
2000-09-14 Perforation 371.50 374.50 17
2007-11-07 Fracture 804.00 809.00 0
2009-03-06 Perforation 641.50 642.00 13
2009-03-06 Perforation 630.50 631.00 13
2009-03-06 Perforation 625.70 626.20 13
2009-03-06 Perforation 622.90 623.90 13
2009-03-06 Perforation 578.60 581.60 13
2009-03-06 Perforation 576.90 577.40 13
2009-03-06 Perforation 557.30 557.80 13
2009-03-06 Perforation 542.40 543.40 13
2009-03-06 Perforation 492.70 493.70 13
2009-03-06 Perforation 487.70 489.70 13
2009-03-06 Perforation 477.00 479.00 13
2009-03-06 Perforation 468.90 469.90 13
2009-03-06 Perforation 467.90 468.40 13
2009-03-06 Perforation 463.90 464.40 13
2009-03-06 Perforation 461.00 462.00 13
2009-03-06 Perforation 458.10 459.10 13
2009-03-06 Perforation 445.70 446.20 13
2009-03-06 Perforation 431.50 432.50 13
2009-03-06 Perforation 344.70 345.20 13
2009-03-06 Perforation 309.60 310.10 13
2009-03-06 Perforation 302.00 303.00 13
2009-03-06 Perforation 300.50 301.00 13
2009-03-06 Perforation 295.10 295.60 13
2009-03-06 Perforation 290.60 291.10 13
2009-03-06 Perforation 265.00 265.50 13
2009-03-12 Fracture 265.00 642.00 0

For data sources see[4]



References