If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0856033506003 | | Well ID: 0856033506003 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 56.411837, -118.360834 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/06-35-085-03W6/3 | | Location: 00/06-35-085-03W6/3 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/06-35-085-03 W6/03 | | Location Alias 2: 00/06-35-085-03 W6/03 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 085 | ||
+ | |- | ||
+ | | Meridian: 6 | ||
+ | |- | ||
+ | | Range: 03 | ||
+ | |- | ||
+ | | Section: 35 | ||
|- | |- | ||
| County/Municipality: [[Clear Hills County,_Alberta|Clear Hills County]] | | County/Municipality: [[Clear Hills County,_Alberta|Clear Hills County]] | ||
Line 17: | Line 27: | ||
| Well Name: LAKERIDGE HINES 6-35-85-3 | | Well Name: LAKERIDGE HINES 6-35-85-3 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Shoreline Energy Corp.]] |
|- | |- | ||
| License Number: 0052087 | | License Number: 0052087 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1975-01-15 | | Final Drill Date: 1975-01-15 | ||
|- | |- | ||
− | | Well Total Depth: 1055. | + | | Well Total Depth: 1055.50 m |
|- | |- | ||
| Surface Hole Latitude: 56.411837 | | Surface Hole Latitude: 56.411837 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1974-12-03 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1975-01-12 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1975-01-13 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1975-01-15 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1975-01-15 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1975-01-16 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1975-01-17 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1975-01-18 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1975-10-01 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1975-10-02 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1981-07-27 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1981-07-28 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1984-10-04 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1984-10-04 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1984-10-07 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1984-10-08 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1984-10-09 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1984-10-09 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1984-10-15 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1984-10-15 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1984-10-15 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1986-01-09 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1986-01-09 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1986-01-09 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1986-01-09 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | | 1986-01-12 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1986-01-12 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1986-01-13 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1986-01-14 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1992-09-01 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1992-09-02 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1992-09-02 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1992-09-03 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1992-09-11 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 1992-09-13 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1992-09-14 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1997-02-25 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1997-02-27 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1997-02-27 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1997-02-27 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1997-02-27 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1997-02-28 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1997-02-28 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1997-02-28 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1997-03-01 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1997-03-02 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1997-03-03 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1997-03-03 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1997-03-03 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-04-29 }}</ref> |
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 246: | ||
| 1975-10-01 | | 1975-10-01 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 918. | + | | style="text-align: right;" | 918.70 |
− | | style="text-align: right;" | 919. | + | | style="text-align: right;" | 919.90 |
| style="text-align: right;" | 3 | | style="text-align: right;" | 3 | ||
|- | |- | ||
| 1975-10-02 | | 1975-10-02 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 904. | + | | style="text-align: right;" | 904.60 |
− | | style="text-align: right;" | 905. | + | | style="text-align: right;" | 905.90 |
| style="text-align: right;" | 3 | | style="text-align: right;" | 3 | ||
|- | |- | ||
| 1981-07-27 | | 1981-07-27 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 909. | + | | style="text-align: right;" | 909.80 |
− | | style="text-align: right;" | 910. | + | | style="text-align: right;" | 910.70 |
| style="text-align: right;" | 10 | | style="text-align: right;" | 10 | ||
|- | |- | ||
| 1981-07-28 | | 1981-07-28 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 909. | + | | style="text-align: right;" | 909.80 |
− | | style="text-align: right;" | 910. | + | | style="text-align: right;" | 910.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1984-10-04 | | 1984-10-04 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 904. | + | | style="text-align: right;" | 904.60 |
− | | style="text-align: right;" | 910. | + | | style="text-align: right;" | 910.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1984-10-07 | | 1984-10-07 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1010. | + | | style="text-align: right;" | 1010.10 |
− | | style="text-align: right;" | 1013. | + | | style="text-align: right;" | 1013.20 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1984-10-08 | | 1984-10-08 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 932. | + | | style="text-align: right;" | 932.10 |
− | | style="text-align: right;" | 933. | + | | style="text-align: right;" | 933.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1984-10-08 | | 1984-10-08 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 933. | + | | style="text-align: right;" | 933.90 |
− | | style="text-align: right;" | 934. | + | | style="text-align: right;" | 934.50 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1984-10-08 | | 1984-10-08 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 936. | + | | style="text-align: right;" | 936.40 |
− | | style="text-align: right;" | 937 | + | | style="text-align: right;" | 937.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1984-10-08 | | 1984-10-08 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 937. | + | | style="text-align: right;" | 937.60 |
− | | style="text-align: right;" | 938. | + | | style="text-align: right;" | 938.50 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1984-10-08 | | 1984-10-08 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 939. | + | | style="text-align: right;" | 939.70 |
− | | style="text-align: right;" | 940. | + | | style="text-align: right;" | 940.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1984-10-09 | | 1984-10-09 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 988 | + | | style="text-align: right;" | 988.00 |
− | | style="text-align: right;" | 996 | + | | style="text-align: right;" | 996.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1986-01-09 | | 1986-01-09 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 932. | + | | style="text-align: right;" | 932.10 |
− | | style="text-align: right;" | 940. | + | | style="text-align: right;" | 940.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1986-01-09 | | 1986-01-09 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 918. | + | | style="text-align: right;" | 918.70 |
− | | style="text-align: right;" | 919. | + | | style="text-align: right;" | 919.90 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1986-01-12 | | 1986-01-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1010. | + | | style="text-align: right;" | 1010.10 |
− | | style="text-align: right;" | 1013. | + | | style="text-align: right;" | 1013.20 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1986-01-13 | | 1986-01-13 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1035 | + | | style="text-align: right;" | 1035.00 |
− | | style="text-align: right;" | 1036. | + | | style="text-align: right;" | 1036.80 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1992-09-02 | | 1992-09-02 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1020 | + | | style="text-align: right;" | 1020.00 |
− | | style="text-align: right;" | 1030 | + | | style="text-align: right;" | 1030.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1992-09-02 | | 1992-09-02 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 997 | + | | style="text-align: right;" | 997.00 |
− | | style="text-align: right;" | 1005 | + | | style="text-align: right;" | 1005.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1992-09-03 | | 1992-09-03 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 581 | + | | style="text-align: right;" | 581.00 |
− | | style="text-align: right;" | 581. | + | | style="text-align: right;" | 581.50 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1992-09-03 | | 1992-09-03 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 592 | + | | style="text-align: right;" | 592.00 |
− | | style="text-align: right;" | 592. | + | | style="text-align: right;" | 592.50 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1992-09-11 | | 1992-09-11 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 581 | + | | style="text-align: right;" | 581.00 |
− | | style="text-align: right;" | 592. | + | | style="text-align: right;" | 592.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1992-09-14 | | 1992-09-14 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 595. | + | | style="text-align: right;" | 595.60 |
− | | style="text-align: right;" | 595. | + | | style="text-align: right;" | 595.90 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1997-02-27 | | 1997-02-27 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 595. | + | | style="text-align: right;" | 595.60 |
− | | style="text-align: right;" | 595. | + | | style="text-align: right;" | 595.90 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1997-02-27 | | 1997-02-27 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 565 | + | | style="text-align: right;" | 565.00 |
− | | style="text-align: right;" | 580 | + | | style="text-align: right;" | 580.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1997-02-28 | | 1997-02-28 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 548. | + | | style="text-align: right;" | 548.70 |
− | | style="text-align: right;" | 549 | + | | style="text-align: right;" | 549.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1997-02-28 | | 1997-02-28 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 555. | + | | style="text-align: right;" | 555.70 |
− | | style="text-align: right;" | 556 | + | | style="text-align: right;" | 556.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1997-02-28 | | 1997-02-28 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 548. | + | | style="text-align: right;" | 548.70 |
− | | style="text-align: right;" | 549 | + | | style="text-align: right;" | 549.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1997-02-28 | | 1997-02-28 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 538 | + | | style="text-align: right;" | 538.00 |
− | | style="text-align: right;" | 554 | + | | style="text-align: right;" | 554.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1997-03-02 | | 1997-03-02 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 297. | + | | style="text-align: right;" | 297.70 |
− | | style="text-align: right;" | 300 | + | | style="text-align: right;" | 300.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1997-03-03 | | 1997-03-03 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 297. | + | | style="text-align: right;" | 297.70 |
− | | style="text-align: right;" | 300 | + | | style="text-align: right;" | 300.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1997-03-03 | | 1997-03-03 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 282 | + | | style="text-align: right;" | 282.00 |
− | | style="text-align: right;" | 294 | + | | style="text-align: right;" | 294.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 262: | Line 434: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Trade Name |
− | + | !scope="col" | Supplier | |
− | !scope="col | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 295: | Line 481: | ||
| 1984 | | 1984 | ||
| style="text-align: right;" | 1501 | | style="text-align: right;" | 1501 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | 0. | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1985 | | 1985 | ||
| style="text-align: right;" | 6742 | | style="text-align: right;" | 6742 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1986 | | 1986 | ||
| style="text-align: right;" | 120 | | style="text-align: right;" | 120 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
Line 315: | Line 501: | ||
| title = Well Production Data - All Alberta | | title = Well Production Data - All Alberta | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Occurences == | <!--== Occurences == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" |
Well ID: 0856033506003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.411837,"lon":-118.360834,"icon":""}]} |
Location: 00/06-35-085-03W6/3 | |
Location Alias: 00/06-35-85-03 W6M | |
Location Alias 2: 00/06-35-085-03 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 085 | |
Meridian: 6 | |
Range: 03 | |
Section: 35 | |
County/Municipality: Clear Hills County | |
Well Name: LAKERIDGE HINES 6-35-85-3 | |
Operator Name: Shoreline Energy Corp. | |
License Number: 0052087 | |
License Date: 1974-12-03 | |
License Status: Suspension | |
Spud Date: 1975-01-05 | |
Final Drill Date: 1975-01-15 | |
Well Total Depth: 1055.50 m | |
Surface Hole Latitude: 56.411837 | |
Surface Hole Longitude: -118.360834 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-12-03 | Obtained License |
1975-01-12 | Drill Stem Test Performed |
1975-01-13 | Drill Stem Test Performed |
1975-01-15 | Finished Drilling |
1975-01-15 | Well Mode changed to Drilled and Cased |
1975-01-16 | Drill Stem Test Performed |
1975-01-17 | Drill Stem Test Performed |
1975-01-18 | Production Casing Operation Performed |
1975-10-01 | Perforation Treatment Performed - Jet Perforation |
1975-10-02 | Perforation Treatment Performed - Jet Perforation |
1981-07-27 | Perforation Treatment Performed - Jet Perforation |
1981-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-10-04 | Perforation Treatment Performed - Cement Squeeze |
1984-10-04 | Plug Back Performed |
1984-10-07 | Perforation Treatment Performed - Jet Perforation |
1984-10-08 | Perforation Treatment Performed - Jet Perforation |
1984-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-10-09 | Plug Back Performed |
1984-10-15 | Well Began Production |
1984-10-15 | Well Fluid changed to Gas |
1984-10-15 | Well Mode changed to Flowing |
1986-01-09 | Perforation Treatment Performed - Cement Squeeze |
1986-01-09 | Plug Back Performed |
1986-01-09 | Well Fluid changed to Gas |
1986-01-09 | Well Mode changed to Abandoned Zone |
1986-01-12 | Perforation Treatment Performed - Jet Perforation |
1986-01-12 | Well Log Performed |
1986-01-13 | Perforation Treatment Performed - Jet Perforation |
1986-01-14 | Well Log Performed |
1992-09-01 | Well Log Performed |
1992-09-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-02 | Plug Back Performed |
1992-09-03 | Perforation Treatment Performed - Jet Perforation |
1992-09-11 | Perforation Treatment Performed - Remedial Casing |
1992-09-13 | Well Log Performed |
1992-09-14 | Perforation Treatment Performed - Jet Perforation |
1997-02-25 | Well Log Performed |
1997-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-02-27 | Perforation Treatment Performed - Cement Squeeze |
1997-02-27 | Plug Back Performed |
1997-02-27 | Well Log Performed |
1997-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-02-28 | Perforation Treatment Performed - Cement Squeeze |
1997-02-28 | Perforation Treatment Performed - Jet Perforation |
1997-03-01 | Well Log Performed |
1997-03-02 | Perforation Treatment Performed - Jet Perforation |
1997-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-03-03 | Perforation Treatment Performed - Cement Squeeze |
1997-03-03 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-10-01 | Perforation | 918.70 | 919.90 | 3 |
1975-10-02 | Perforation | 904.60 | 905.90 | 3 |
1981-07-27 | Perforation | 909.80 | 910.70 | 10 |
1981-07-28 | Acid Treatment | 909.80 | 910.70 | 0 |
1984-10-04 | Cement Squeeze | 904.60 | 910.70 | 0 |
1984-10-07 | Perforation | 1010.10 | 1013.20 | 13 |
1984-10-08 | Perforation | 932.10 | 933.30 | 13 |
1984-10-08 | Perforation | 933.90 | 934.50 | 13 |
1984-10-08 | Perforation | 936.40 | 937.00 | 13 |
1984-10-08 | Perforation | 937.60 | 938.50 | 13 |
1984-10-08 | Perforation | 939.70 | 940.30 | 13 |
1984-10-09 | Packing Device Capped w/Cement | 988.00 | 996.00 | 0 |
1986-01-09 | Cement Squeeze | 932.10 | 940.30 | 0 |
1986-01-09 | Cement Squeeze | 918.70 | 919.90 | 0 |
1986-01-12 | Perforation | 1010.10 | 1013.20 | 13 |
1986-01-13 | Perforation | 1035.00 | 1036.80 | 13 |
1992-09-02 | Packing Device Capped w/Cement | 1020.00 | 1030.00 | 0 |
1992-09-02 | Packing Device Capped w/Cement | 997.00 | 1005.00 | 0 |
1992-09-03 | Perforation | 581.00 | 581.50 | 13 |
1992-09-03 | Perforation | 592.00 | 592.50 | 13 |
1992-09-11 | Remedial Casing Cementing | 581.00 | 592.50 | 0 |
1992-09-14 | Perforation | 595.60 | 595.90 | 13 |
1997-02-27 | Cement Squeeze | 595.60 | 595.90 | 0 |
1997-02-27 | Packing Device Capped w/Cement | 565.00 | 580.00 | 0 |
1997-02-28 | Perforation | 548.70 | 549.00 | 13 |
1997-02-28 | Perforation | 555.70 | 556.00 | 13 |
1997-02-28 | Cement Squeeze | 548.70 | 549.00 | 0 |
1997-02-28 | Packing Device Capped w/Cement | 538.00 | 554.00 | 0 |
1997-03-02 | Perforation | 297.70 | 300.00 | 13 |
1997-03-03 | Cement Squeeze | 297.70 | 300.00 | 0 |
1997-03-03 | Packing Device Capped w/Cement | 282.00 | 294.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1501 | 0.0 | 0.0 | 0.0 |
1985 | 6742 | 0.0 | 0.0 | 0.0 |
1986 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]