If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 181: | Line 181: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-005-30442 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.943486,"lon":-79.472385,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2009-08-21 | |
Last Permit Date: 2009-08-21 | |
Spud Date: 2010-02-16 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.943486 | |
Longitude: -79.472385 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 4125.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 5232.0 | 335.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 7009.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 7060.0 | 306.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 25.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | PRODUCED FLUID | 75.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2010-0 | DRILLING FLUID WASTE | 410.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2010-0 | FRACING FLUID WASTE | 550.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2011-0 | PRODUCED FLUID | 75.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 25.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1867295 | 2009-02-18 | No Violations Noted | drilling @ 1470ft/E&S ok/ID&pit ok | |
1865395 | 2010-02-24 | No Violations Noted | Drilling was completed at the time of the inspection. Below grade pit located onsite and the pit had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation with respect to the access road. Observed evidence that runoff had transported a limited amount of sediment off-site during the most recent rain and snow melt. The operator had restablished the filter fabric fence after observing the compormised filter fabric fence. The operator should closely monitor the site for sediment transport during future precipitation events and/or snow melt due to the proximity of the site to an unamed tributary to the Allecheny River. Spoke with operator representative Mark Hopkins concerning the site and possible erosion issues. | |
1884418 | 2010-05-14 | No Violations Noted | Well appeared to be equipped for & in production at the time of the inspection. Brine tank located onsite and appeared to be in sound condition. Site had been regraded, seeded & mulched and the vegetation had begun to grow. Vegetation did not as of yet meet the 70% uniform coverage criteria. No accelerated erosion & sedimentation was observed in relation to the site or access road. The operator should continue to monitor the site to insure the erosion control BMP's continue to function properly until the vegetative cover achieves the 70% uniform coverage criteria. |