If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 133: | Line 133: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-005-30064 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.617267,"lon":-79.421079,"icon":""}]} |
Operator Name: PENNECO OIL CO INC | |
First Permit Date: 2008-10-10 | |
Last Permit Date: 2008-10-10 | |
Spud Date: 2009-04-23 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.617267 | |
Longitude: -79.421079 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 3839.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 4475.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 5899.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 10045.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | PRODUCED FLUID | 59.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1795819 | 2009-04-23 | No Violations Noted | drilling - awaiting cement for 100.3' of 3 3/8"/E&S ok/ID& pit ok | |
1804481 | 2009-05-08 | No Violations Noted | drilling complete - not equipped/ID&pits ok/E&S ok | |
1808618 | 2009-06-29 | No Violations Noted | Drilling was commenced during early May 2009. Inspection found the well to be equipped for production and a brine tank was located onsite and appeared to be in sound condition. Observed no accelerated erosion & sedimentation in relation to the well-site or access road. The site had been regraded and seeded and the vegetation ahd begun to take hold. The operator should continue to monitor the site to insure that the 70% uniform coverage criteria is met. | |
1889138 | 2010-06-03 | No Violations Noted | Drilling was completed on 05/05/09. Inspection found the well to be equipped for production and a brine tank was located onsite and appeared to be in sound condition. Observed no accelerated erosion & sedimentation in relation to the well-site or access road. Vegetative cover met the 70% uniform coverage criteria. |