X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-23502"

m
m
Line 200: Line 200:
  
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Wells]]

Revision as of 00:10, 29 June 2014

Well Details

Well ID: 37-059-23502
Loading map...
Operator Name: ENERGY CORP OF AMER
First Permit Date: 2004-10-01
Last Permit Date: 2004-10-01
Spud Date: 2004-12-14
Unconventional: No
Horizontal: No
Violations: None
Latitude: 39.86816
Longitude: -80.014603

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 1228.0 334.0 0.0 0.0 0.0 0.0
2010-0 1095.0 365.0 0.0 0.0 0.0 0.0
2009-0 1361.0 365.0 0.0 0.0 0.0 0.0
2008-0 1561.0 365.0 0.0 0.0 0.0 0.0
2007-0 2208.0 365.0 0.0 0.0 0.0 0.0
2006-0 3093.0 365.0 0.0 0.0 0.0 0.0
2005-0 3405.0 212.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2005-0 BRINE 115.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT CLEARFIELD MUNI STP
2005-0 BRINE 115.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2006-0 BRINE 60.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2009-0 BRINE 85.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA BRINE TRT - JOSEPHINE PLT -INDIANA CO

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1412779 2005-01-28 No Violations Noted Staked for rig, bench pit cut & lined, bench not drilled, rain-filled lined pit, access rough cut for equipt. to do initial drilling. ID/plan at entrance.
1412921 2005-01-28 No Violations Noted Staked for rig, bench pit cut & lined, bench staked for rig,but not drilled, rain-filled lined pit, access is rough-cut for equipt to do initial drilling. ID/plan at entrance.
1442984 2005-04-27 No Violations Noted Access is reworked, plastic underlain w/stone topping... Pipeline work in progress above bench. Pits open, lined, well drilled. Topsoil stockpiled.
1447938 2005-05-03 No Violations Noted drilling at 600', pit and e/s ok
1448064 2005-05-09 No Violations Noted drilling at 1943', out and e/s ok

References