If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-051-24407 | | Well ID: 37-051-24407 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.967377, -79.679111 | width=100% | height=100% }} |
|- | |- | ||
| County: [[Fayette County, Pennsylvania|Fayette]] | | County: [[Fayette County, Pennsylvania|Fayette]] | ||
Line 9: | Line 9: | ||
| Municipality: [[Dunbar Township, Fayette County, Pennsylvania|Dunbar Township]] | | Municipality: [[Dunbar Township, Fayette County, Pennsylvania|Dunbar Township]] | ||
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[CHEVRON APPALACHIA LLC]] |
|- | |- | ||
− | | Well Pad ID: [[148718]] | + | | Well Pad ID: [[148718|148718]] |
|- | |- | ||
| Farm/Lease Name: KURUTZ UNIT 11H | | Farm/Lease Name: KURUTZ UNIT 11H | ||
Line 25: | Line 25: | ||
| Horizontal: Yes | | Horizontal: Yes | ||
|- | |- | ||
− | | | + | | Well Status: ACTIVE |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
| Latitude: 39.967377 | | Latitude: 39.967377 | ||
Line 34: | Line 34: | ||
|- | |- | ||
|} | |} | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | GAS QUANTITY | ||
+ | !scope="col" | GAS PRODUCTION DAYS | ||
+ | !scope="col" | CONDENSATE QUANTITY | ||
+ | !scope="col" | CONDENSATE PRODUCTION DAYS | ||
+ | !scope="col" | OIL QUANTITY | ||
+ | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | style="text-align:right;" | 149647.0 | ||
+ | | style="text-align:right;" | 153.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-1 | ||
+ | | style="text-align:right;" | 227195.0 | ||
+ | | style="text-align:right;" | 181.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | style="text-align:right;" | 201096.0 | ||
+ | | style="text-align:right;" | 184.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 139573.0 | ||
+ | | style="text-align:right;" | 181.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 139028.0 | ||
+ | | style="text-align:right;" | 153.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-02 | ||
+ | | style="text-align:right;" | 16982.0 | ||
+ | | style="text-align:right;" | 28.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-01 | ||
+ | | style="text-align:right;" | 19243.0 | ||
+ | | style="text-align:right;" | 31.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-03 | ||
+ | | style="text-align:right;" | 18674.0 | ||
+ | | style="text-align:right;" | 31.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | TYPE | ||
+ | !scope="col" | QUANTITY | ||
+ | !scope="col" | UNITS | ||
+ | !scope="col" | DISPOSAL METHOD | ||
+ | !scope="col" | WASTE FACILITY PERMIT ID | ||
+ | !scope="col" | WASTE FACILITY NAME | ||
+ | !scope="col" | FACILITY CITY | ||
+ | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2011-1 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 914.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR DRILLING OR PLUGGING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 1.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | | RONCO WASTE PROCESSING FACILITY | ||
+ | | MASONTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 7.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | | RONCO WASTE PROCESSING FACILITY | ||
+ | | MASONTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 11.38 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | 100419 | ||
+ | | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | ||
+ | | MCCLELLANDTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 2.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR DRILLING OR PLUGGING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 8.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | | RONCO WASTE PROCESSING FACILITY | ||
+ | | MASONTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 1.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR DRILLING OR PLUGGING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-1 | ||
+ | | FLOWBACK FRACTURING SAND | ||
+ | | style="text-align:right;" | 16.15 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | 073 114 654 | ||
+ | | US ECOLOGY IDAHO, INC. | ||
+ | | GRAND VIEW | ||
+ | | ID | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 2.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR DRILLING OR PLUGGING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 1.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 631.67 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 13.33 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
+ | | WARREN DRILLING CO #1 (SWIW #6) | ||
+ | | DEXTER CITY | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 491.33 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 26.67 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
+ | | WARREN DRILLING CO #1 (SWIW #6) | ||
+ | | DEXTER CITY | ||
+ | | OH | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 41: | Line 355: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1944022 | | 1944022 | ||
| 2011-01-20 | | 2011-01-20 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 52: | Line 370: | ||
| 2011-03-24 | | 2011-03-24 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 60: | Line 380: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, E&S LOOK GOOD CONDITION.CONDUTOR IS SET, WAITING ON RIG. | | HORIZONTAL MARCELLUS, E&S LOOK GOOD CONDITION.CONDUTOR IS SET, WAITING ON RIG. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 66: | Line 388: | ||
| 2011-04-19 | | 2011-04-19 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 73: | Line 397: | ||
| 2011-05-17 | | 2011-05-17 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 80: | Line 406: | ||
| 2011-05-31 | | 2011-05-31 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 88: | Line 416: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. (TD) @ 7709' MUDDING UP AND CAPPED. MOVING OVER TO KURUTZ # 10 - H. | | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. (TD) @ 7709' MUDDING UP AND CAPPED. MOVING OVER TO KURUTZ # 10 - H. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 95: | Line 425: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.RAN INTERMEDIATE CASING @ 2772' AND CEMENTING (5/12/2011).DRILLING @ 3108' TODAY. | | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.RAN INTERMEDIATE CASING @ 2772' AND CEMENTING (5/12/2011).DRILLING @ 3108' TODAY. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 102: | Line 434: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. BACK TO DRILLING 5/1/2011. TD COAL STRING @ 671'. CEMENTING COAL STRING. TOOK 965 SACKS OF CEMENT TO FILL THE VOID. | | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. BACK TO DRILLING 5/1/2011. TD COAL STRING @ 671'. CEMENTING COAL STRING. TOOK 965 SACKS OF CEMENT TO FILL THE VOID. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 109: | Line 443: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLING @ 469' ,STUCK IN HOLE. | | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLING @ 469' ,STUCK IN HOLE. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 116: | Line 452: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. MOVING RIG OVER TODAY. | | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. MOVING RIG OVER TODAY. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 123: | Line 461: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SET 24" CONDUCTOR PIPE ( 2 /15/2011). | | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SET 24" CONDUCTOR PIPE ( 2 /15/2011). | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 129: | Line 469: | ||
| 2011-06-29 | | 2011-06-29 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 137: | Line 479: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS,E&S & PITS LOOK IN GOOD CONDITION.RIG MOVING ON SITE (PIONEER DRILLING). | | HORIZONTAL MARCELLUS,E&S & PITS LOOK IN GOOD CONDITION.RIG MOVING ON SITE (PIONEER DRILLING). | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 144: | Line 488: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, MOVED TO (KURUTZ 11 - H ), STARTED RUNNING DRILL PIPE IN HOLE ( 11/2/2100 ). | | HORIZONTAL MARCELLUS, MOVED TO (KURUTZ 11 - H ), STARTED RUNNING DRILL PIPE IN HOLE ( 11/2/2100 ). | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 151: | Line 497: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 10,244', RUNNING PROD. CASING AND CEMENTING TONIGHT. | | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 10,244', RUNNING PROD. CASING AND CEMENTING TONIGHT. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 158: | Line 506: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, DRILLING TO (11,986'),RUNNING PROD. CASING AND CEMENTING (11/13/2011). | | HORIZONTAL MARCELLUS, DRILLING TO (11,986'),RUNNING PROD. CASING AND CEMENTING (11/13/2011). | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 164: | Line 514: | ||
| 2012-02-01 | | 2012-02-01 | ||
| No Violations Noted | | No Violations Noted | ||
− | | Hole in the liner with water coming in. Violation becasue pit not impermiable. The violation is recorded on Well #10, permit | + | | Hole in the liner with water coming in. Violation becasue pit not impermiable. The violation is recorded on Well #10, permit 051-24406, eFacts#: 2047985. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 176: | Line 528: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 188: | Line 542: | ||
Later that day, Vince received a tip from a citizen that fly ash was delivered to this well site to be used as a bulking / drying additive for pit preparation for landfill disposal. Chevron was notified by phone & requested to investigate & confirm all additives used. | Later that day, Vince received a tip from a citizen that fly ash was delivered to this well site to be used as a bulking / drying additive for pit preparation for landfill disposal. Chevron was notified by phone & requested to investigate & confirm all additives used. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 194: | Line 550: | ||
| 2012-02-14 | | 2012-02-14 | ||
| No Violations Noted | | No Violations Noted | ||
− | | On February 14, 2012, I stopped at the Kurutz site to check progress. They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still | + | | On February 14, 2012, I stopped at the Kurutz site to check progress. They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadnï¾’t any hits. |
About 120 barrels of liquid were removed from the pit in the last two days. | About 120 barrels of liquid were removed from the pit in the last two days. | ||
Chevron was working on a plan to empty the pit and handle any hydrogen sulfide problems. | Chevron was working on a plan to empty the pit and handle any hydrogen sulfide problems. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 205: | Line 563: | ||
| 2012-02-17 | | 2012-02-17 | ||
| No Violations Noted | | No Violations Noted | ||
− | | On February 15, 2012, | + | | On February 15, 2012, Chevronï¾’s contractor again started removing material from the cuttings pit. |
On February 17, 2012, I stopped to check the progress. Material was actively being removed at inspection and I got to see them mix the cement with the cuttings. The work was progressing and they had no more hydrogen sulfide hits at that point. | On February 17, 2012, I stopped to check the progress. Material was actively being removed at inspection and I got to see them mix the cement with the cuttings. The work was progressing and they had no more hydrogen sulfide hits at that point. | ||
Line 213: | Line 571: | ||
Beth Smock from Chevron was on-site and we spoke briefly about the case. | Beth Smock from Chevron was on-site and we spoke briefly about the case. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 219: | Line 579: | ||
| 2012-02-22 | | 2012-02-22 | ||
| No Violations Noted | | No Violations Noted | ||
− | | On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location. | + | | On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location. Billï¾’s investigation revealed that this pit does not comply with requirements under Chapter 78 ï¾– specifically 78.56 a 4 iii. |
We also found a small coal seam in the pit. | We also found a small coal seam in the pit. | ||
− | Violations noted agains Well# 10H | + | Violations noted agains Well# 10H - 051-24408, eFacts#: 2048173, Enforcement#: 281094 |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 232: | Line 594: | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS, HALIBURTON WAS RIGGED -UP FOR FRAC JOB PRESSURE TESTING FOR 3 RD TIME WHEN CHICKSAM HAMMER UNION FAILED. DAMAGING IRON ON LOCATION. NO INJURIES ON LOCATION. ALL IRON WILL BE REMOVED AND TESTED (ASAP). NEW IRON IS BEING BROUGHT IN ON LOCATION. THE LINER IS BEING REPLACE AT AREA OF BLOW OUT.NO EVIRNOMENTAL IMPACK ,DUE TO USING OF FRESH WATER TO PRESSURE TEST. | | HORIZONTAL MARCELLUS, HALIBURTON WAS RIGGED -UP FOR FRAC JOB PRESSURE TESTING FOR 3 RD TIME WHEN CHICKSAM HAMMER UNION FAILED. DAMAGING IRON ON LOCATION. NO INJURIES ON LOCATION. ALL IRON WILL BE REMOVED AND TESTED (ASAP). NEW IRON IS BEING BROUGHT IN ON LOCATION. THE LINER IS BEING REPLACE AT AREA OF BLOW OUT.NO EVIRNOMENTAL IMPACK ,DUE TO USING OF FRESH WATER TO PRESSURE TEST. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 240: | Line 604: | ||
| Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November. Extension approved. | | Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November. Extension approved. | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
− | |||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-051-24407 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.967377,"lon":-79.679111,"icon":""}]} |
County: Fayette | |
Municipality: Dunbar Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148718 | |
Farm/Lease Name: KURUTZ UNIT 11H | |
First Permit Date: 2010-11-23 | |
Last Permit Date: 2010-11-23 | |
Spud Date: 2011-02-15 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 39.967377 | |
Longitude: -79.679111 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 149647.0 | 153.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 227195.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 201096.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 139573.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 139028.0 | 153.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 16982.0 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 19243.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 18674.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-1 | FRACING FLUID WASTE | 914.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2011-2 | DRILLING FLUID WASTE | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-1 | DRILLING FLUID WASTE | 7.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-2 | DRILL CUTTINGS | 11.38 | Tons | LANDFILL | 100419 | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | MCCLELLANDTOWN | PA |
2012-2 | FRACING FLUID WASTE | 2.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2012-2 | FRACING FLUID WASTE | 8.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-2 | PRODUCED FLUID | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2013-1 | FLOWBACK FRACTURING SAND | 16.15 | Tons | LANDFILL | 073 114 654 | US ECOLOGY IDAHO, INC. | GRAND VIEW | ID |
2013-1 | PRODUCED FLUID | 2.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2013-2 | PRODUCED FLUID | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 631.67 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 13.33 | Bbl | INJECTION DISPOSAL WELL | 34-121-23995 | WARREN DRILLING CO #1 (SWIW #6) | DEXTER CITY | OH |
2014-2 | PRODUCED FLUID | 491.33 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 26.67 | Bbl | INJECTION DISPOSAL WELL | 34-121-23995 | WARREN DRILLING CO #1 (SWIW #6) | DEXTER CITY | OH |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1944022 | 2011-01-20 | No Violations Noted | ||||
1960162 | 2011-03-24 | No Violations Noted | ||||
1961107 | 2011-03-28 | No Violations Noted | HORIZONTAL MARCELLUS, E&S LOOK GOOD CONDITION.CONDUTOR IS SET, WAITING ON RIG. | |||
1967349 | 2011-04-19 | No Violations Noted | ||||
1973584 | 2011-05-17 | No Violations Noted | ||||
1977445 | 2011-05-31 | No Violations Noted | ||||
1984046 | 2011-05-17 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. (TD) @ 7709' MUDDING UP AND CAPPED. MOVING OVER TO KURUTZ # 10 - H. | |||
1984051 | 2011-05-14 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.RAN INTERMEDIATE CASING @ 2772' AND CEMENTING (5/12/2011).DRILLING @ 3108' TODAY. | |||
1984054 | 2011-05-02 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. BACK TO DRILLING 5/1/2011. TD COAL STRING @ 671'. CEMENTING COAL STRING. TOOK 965 SACKS OF CEMENT TO FILL THE VOID. | |||
1984055 | 2011-04-27 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLING @ 469' ,STUCK IN HOLE. | |||
1984057 | 2011-04-23 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. MOVING RIG OVER TODAY. | |||
1984060 | 2011-03-31 | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SET 24" CONDUCTOR PIPE ( 2 /15/2011). | |||
1984830 | 2011-06-29 | No Violations Noted | ||||
2005130 | 2011-09-19 | No Violations Noted | HORIZONTAL MARCELLUS,E&S & PITS LOOK IN GOOD CONDITION.RIG MOVING ON SITE (PIONEER DRILLING). | |||
2017365 | 2011-11-03 | No Violations Noted | HORIZONTAL MARCELLUS, MOVED TO (KURUTZ 11 - H ), STARTED RUNNING DRILL PIPE IN HOLE ( 11/2/2100 ). | |||
2025516 | 2011-11-09 | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 10,244', RUNNING PROD. CASING AND CEMENTING TONIGHT. | |||
2025889 | 2011-11-14 | No Violations Noted | HORIZONTAL MARCELLUS, DRILLING TO (11,986'),RUNNING PROD. CASING AND CEMENTING (11/13/2011). | |||
2047990 | 2012-02-01 | No Violations Noted | Hole in the liner with water coming in. Violation becasue pit not impermiable. The violation is recorded on Well #10, permit 051-24406, eFacts#: 2047985. | |||
2048073 | 2012-02-09 | No Violations Noted | On February, 8, 2012, while subcontractor was removing / mixing the material in the cuttings pit, a Chevron employee got a reading of 22 ppm hydrogen sulfide (H2S) on his PPM. All work was halted and the site evacuated until the situation was resolved.
On February 9, 2012, I stopped at the site and confirmed that work was halted.
|
|||
2048107 | 2012-02-10 | No Violations Noted | On February 10, 2012, WQSS Vince Yantko and I visited the Kurutz site to evaluate the situation. The site was still shut down and an environmental contractor was monitoring for hydrogen sulfide. This contractor reported that there were no new detects.
We talked briefly about the clean-up and walked around the open pit. It appeared like more water was coming into pit and Vince expressed concerns that pit water inflow may reach a level where pit contents may reverse flow back out of liner hole. Later that day, Vince received a tip from a citizen that fly ash was delivered to this well site to be used as a bulking / drying additive for pit preparation for landfill disposal. Chevron was notified by phone & requested to investigate & confirm all additives used. |
|||
2048118 | 2012-02-14 | No Violations Noted | On February 14, 2012, I stopped at the Kurutz site to check progress. They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadnï¾’t any hits.
About 120 barrels of liquid were removed from the pit in the last two days. Chevron was working on a plan to empty the pit and handle any hydrogen sulfide problems. |
|||
2048124 | 2012-02-17 | No Violations Noted | On February 15, 2012, Chevronï¾’s contractor again started removing material from the cuttings pit.
On February 17, 2012, I stopped to check the progress. Material was actively being removed at inspection and I got to see them mix the cement with the cuttings. The work was progressing and they had no more hydrogen sulfide hits at that point. They hoped to have all the work including the liner removed by Wednesday, February 22nd. Beth Smock from Chevron was on-site and we spoke briefly about the case. |
|||
2048195 | 2012-02-22 | No Violations Noted | On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location. Billï¾’s investigation revealed that this pit does not comply with requirements under Chapter 78 ï¾– specifically 78.56 a 4 iii.
We also found a small coal seam in the pit. Violations noted agains Well# 10H - 051-24408, eFacts#: 2048173, Enforcement#: 281094 |
|||
2089970 | 2012-07-12 | No Violations Noted | HORIZONTAL MARCELLUS, HALIBURTON WAS RIGGED -UP FOR FRAC JOB PRESSURE TESTING FOR 3 RD TIME WHEN CHICKSAM HAMMER UNION FAILED. DAMAGING IRON ON LOCATION. NO INJURIES ON LOCATION. ALL IRON WILL BE REMOVED AND TESTED (ASAP). NEW IRON IS BEING BROUGHT IN ON LOCATION. THE LINER IS BEING REPLACE AT AREA OF BLOW OUT.NO EVIRNOMENTAL IMPACK ,DUE TO USING OF FRESH WATER TO PRESSURE TEST. | |||
2107506 | 2012-09-26 | No Violations Noted | Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November. Extension approved. |