If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m (Tag: Replaced) |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 42-353-31256 | | Well ID: 42-353-31256 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="9" | {{#display_map: 32.464696, -100.641032 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 10: | Line 10: | ||
|- | |- | ||
| County: [[Nolan County,_Texas|Nolan County]] | | County: [[Nolan County,_Texas|Nolan County]] | ||
+ | |- | ||
+ | | Operator Name: [[BAYTECH, INC.]] | ||
|- | |- | ||
| Well Type: Oil | | Well Type: Oil |
Well ID: 42-353-31256 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":32.464696,"lon":-100.641032,"icon":""}]} |
Country: United States | |
State: Texas | |
County: Nolan County | |
Operator Name: BAYTECH, INC. | |
Well Type: Oil | |
Lease Number: 28272 | |
Latitude: 32.464696 | |
Longitude: -100.641032 |
For data sources see[1]
Date | Event |
---|---|
1982-02-12 | Application Received |
1982-02-12 | Permit Issued |
1982-03-19 | Well Status: DRY-HOLE |
1983-02-12 | Permit Expired |
1986-07-17 | Application Received |
1986-07-18 | Permit Issued |
1986-09-16 | Well Status: DRY-HOLE |
1987-07-18 | Permit Expired |
1997-04-18 | Application Received |
1997-04-21 | Permit Issued |
1997-06-20 | Spudding Begins |
1997-07-26 | Well Status: FINAL-COMPLETION |
1999-04-21 | Permit Expired |
For data sources see[2]