m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-111-20296 | | Well ID: 37-111-20296 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.743583, -79.357611 | width=100% | height=100% }} |
|- | |- | ||
| County: [[Somerset County, Pennsylvania|Somerset]] | | County: [[Somerset County, Pennsylvania|Somerset]] | ||
Line 9: | Line 9: | ||
| Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]] | | Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]] | ||
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[CHEVRON APPALACHIA LLC]] |
|- | |- | ||
− | | Well Pad ID: [[149069]] | + | | Well Pad ID: [[149069|149069]] |
|- | |- | ||
| Farm/Lease Name: PMG ALLEN UNIT 1H | | Farm/Lease Name: PMG ALLEN UNIT 1H | ||
Line 25: | Line 25: | ||
| Horizontal: Yes | | Horizontal: Yes | ||
|- | |- | ||
− | | | + | | Well Status: ACTIVE |
|- | |- | ||
| Violations: 3 | | Violations: 3 | ||
Line 34: | Line 34: | ||
|- | |- | ||
|} | |} | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | GAS QUANTITY | ||
+ | !scope="col" | GAS PRODUCTION DAYS | ||
+ | !scope="col" | CONDENSATE QUANTITY | ||
+ | !scope="col" | CONDENSATE PRODUCTION DAYS | ||
+ | !scope="col" | OIL QUANTITY | ||
+ | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2010-3 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | style="text-align:right;" | 64882.0 | ||
+ | | style="text-align:right;" | 24.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | style="text-align:right;" | 209382.0 | ||
+ | | style="text-align:right;" | 182.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-02 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-01 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-03 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | TYPE | ||
+ | !scope="col" | QUANTITY | ||
+ | !scope="col" | UNITS | ||
+ | !scope="col" | DISPOSAL METHOD | ||
+ | !scope="col" | WASTE FACILITY PERMIT ID | ||
+ | !scope="col" | WASTE FACILITY NAME | ||
+ | !scope="col" | FACILITY CITY | ||
+ | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2010-3 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 700.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
+ | | FLUID RECOVERY SERVICE FRANKLIN FACILITY | ||
+ | | FRANKLIN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 3.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 34-059-24067 | ||
+ | | DAVID R. HILL INC | ||
+ | | BYESVILLE | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 495.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR119 | ||
+ | | EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT | ||
+ | | WILLIAMSPORT | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095273 | ||
+ | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | ||
+ | | JOSEPHINE | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 240.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-133-24096 | ||
+ | | GROSELLE #2 - SALTYS DISPOSAL WELLS LP | ||
+ | | GARRETTSVILLE | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 12.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0254185 | ||
+ | | RESERVED ENV SVC WASTE WATER TREATMENT FACILITY | ||
+ | | MOUNT PLEASANT | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 7.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0091472 | ||
+ | | TUNNELTON LIQUIDS TREATMENT FACILITY | ||
+ | | SALTSBURG | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 4.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PAR000519462 | ||
+ | | ADVANCED WASTE SERVICES OF PA LLC | ||
+ | | NEW CASTLE | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 15.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-2-3995 | ||
+ | | HUNTERS SWIW #5 | ||
+ | | RENO | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 946.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR DRILLING OR PLUGGING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 100.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | | RONCO WASTE PROCESSING FACILITY | ||
+ | | MASONTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 1.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | | RONCO WASTE PROCESSING FACILITY | ||
+ | | MASONTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 6.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR DRILLING OR PLUGGING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 6.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
+ | | WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL | ||
+ | | DEXTER CITY | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 296.16 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | 100419 | ||
+ | | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | ||
+ | | MCCLELLANDTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 1.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | | RONCO WASTE PROCESSING FACILITY | ||
+ | | MASONTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 56.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
+ | | WARREN DRILLING CO #1 (SWIW #6) | ||
+ | | DEXTER CITY | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-1 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 492.74 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | 100419 | ||
+ | | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | ||
+ | | MCCLELLANDTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-1 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 355.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
+ | | RONCO WASTE PROCESSING FACILITY | ||
+ | | MASONTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 95.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 11.67 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | FLOWBACK FRACTURING SAND | ||
+ | | style="text-align:right;" | 58.23 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | 76-00-08 | ||
+ | | WASTE MANAGEMENT, INC - AMERICAN LANDFILL, INC | ||
+ | | WAYNESBURG | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 28.33 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 2.0 | ||
+ | | Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
+ | | RONCO WASTE PROCESSING FACILITY | ||
+ | | MASONTOWN | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 70.83 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 41: | Line 485: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1873366 | | 1873366 | ||
| 2010-03-25 | | 2010-03-25 | ||
| Violation(s) Noted | | Violation(s) Noted | ||
− | | At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation | + | | At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation hour﾿s invoice. On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification. E/S plan and sign at the entrance of the access road. Sign was missing permit number. E/S plan was missing site plot and E&S controls plan. Additional site activity was occurring around pad with no E/S plans and limited E/S controls. On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release |
| 584177 | | 584177 | ||
+ | | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 52: | Line 500: | ||
| 2010-03-25 | | 2010-03-25 | ||
| Violation(s) Noted | | Violation(s) Noted | ||
− | | At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation | + | | At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation hour﾿s invoice. On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification. E/S plan and sign at the entrance of the access road. Sign was missing permit number. E/S plan was missing site plot and E&S controls plan. Additional site activity was occurring around pad with no E/S plans and limited E/S controls. On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release |
| 584177 | | 584177 | ||
+ | | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 59: | Line 509: | ||
| 2010-04-08 | | 2010-04-08 | ||
| No Violations Noted | | No Violations Noted | ||
− | | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. All erosion control | + | | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. All erosion control BMP﾿s appeared to have been implemented properly. Noted that earthmoving activity was ongoing adjacent to the drill pad. Spoke with operator Matt Barch via phone regarding this matter and he stated that this was work to construct the frac pit and that an ESCGP-1 covering this activity was obtained and was with the contractor performing site construction at that time. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 67: | Line 519: | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S and IW issues. Pit aligned with 20 mil plastic aligned drilling pit and frac pit aligned also and security fence. No free board issues with pit. Well connected production equipment. Swab rig was present at the wellhead. Heavy equipment was on-site to start restoring site and pits. | | At the time of inspection, no E&S and IW issues. Pit aligned with 20 mil plastic aligned drilling pit and frac pit aligned also and security fence. No free board issues with pit. Well connected production equipment. Swab rig was present at the wellhead. Heavy equipment was on-site to start restoring site and pits. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 73: | Line 527: | ||
| 2010-05-12 | | 2010-05-12 | ||
| Violation(s) Noted | | Violation(s) Noted | ||
− | | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various | + | | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. |
| 587052 | | 587052 | ||
+ | | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 80: | Line 536: | ||
| 2010-05-12 | | 2010-05-12 | ||
| Violation(s) Noted | | Violation(s) Noted | ||
− | | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various | + | | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. |
| 587052 | | 587052 | ||
+ | | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 87: | Line 545: | ||
| 2010-05-12 | | 2010-05-12 | ||
| Violation(s) Noted | | Violation(s) Noted | ||
− | | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various | + | | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. |
| 587053 | | 587053 | ||
+ | | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 94: | Line 554: | ||
| 2010-05-12 | | 2010-05-12 | ||
| Violation(s) Noted | | Violation(s) Noted | ||
− | | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various | + | | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. |
| 587053 | | 587053 | ||
+ | | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 101: | Line 563: | ||
| 2010-10-06 | | 2010-10-06 | ||
| No Violations Noted | | No Violations Noted | ||
− | | At the time of inspection, no E&S or IW discharge issues at the site. Pit aligned with proper plastic and no freeboard issues. Keystone Vacuum was removing fluids from pit. E&S controls were in place. Chief was in the process of flow back and flaring gas well from Fracking procedure. Due to Chief policy of | + | | At the time of inspection, no E&S or IW discharge issues at the site. Pit aligned with proper plastic and no freeboard issues. Keystone Vacuum was removing fluids from pit. E&S controls were in place. Chief was in the process of flow back and flaring gas well from Fracking procedure. Due to Chief policy of ﾿fire retardation suites﾿, DEP was not allowed to enter the site pad but was able to view the flare and site conditions from the Security station. Based on visual view of the site, the flame was showing no smoke or air quality problems. The site showed no signs of stress vegetation or air quality problems. DEP called Chief (JD Slater ﾿ Compliance Manager). He reviewed the log for Sunday and showed no reports of site air quality concerns. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 108: | Line 572: | ||
| 2010-10-13 | | 2010-10-13 | ||
| No Violations Noted | | No Violations Noted | ||
− | | Well site properly signed with ES plan available for review during inspection. No accelerated erosion or sedimentation issues noted with well site, access road, or impoundment. Culverts, ditches, and sediment traps sufficiently rocked and functioning. Observed large amounts of sand atop pad. No pits on site, only frac tanks. No observation of industrial discharge. Operator actively repairing a | + | | Well site properly signed with ES plan available for review during inspection. No accelerated erosion or sedimentation issues noted with well site, access road, or impoundment. Culverts, ditches, and sediment traps sufficiently rocked and functioning. Observed large amounts of sand atop pad. No pits on site, only frac tanks. No observation of industrial discharge. Operator actively repairing a ﾿minor﾿ leak on well head during our well inspection. Well fraced in Aug and recently burnt off (flared). Site was being monitored by security 24hrs a day. Accompanied by WQS Dana Burk, and WQSS Ed Ritzer. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 116: | Line 582: | ||
| No Violations Noted | | No Violations Noted | ||
| Operator should correct API # on sign, Frac pit w/ adequate free board | | Operator should correct API # on sign, Frac pit w/ adequate free board | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 122: | Line 590: | ||
| 2011-08-04 | | 2011-08-04 | ||
| No Violations Noted | | No Violations Noted | ||
− | | At the time of inspection, no E&S or IW discharge issues at the site. Well was in production. Well showing 3000 psi at wellhead and was connected to condensation unit followed by 2 | + | | At the time of inspection, no E&S or IW discharge issues at the site. Well was in production. Well showing 3000 psi at wellhead and was connected to condensation unit followed by 2 ﾿ 100 bbls brine tanks. Both units located in a containment area. DEP representatives present were Paul Wyrwas and Marc Maestra. Marc inspected the site pad and perimeter of the site pad and found no issues. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 135: | Line 605: | ||
No violations noted at this time. | No violations noted at this time. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 142: | Line 614: | ||
| No Violations Noted | | No Violations Noted | ||
| During this inspection, Site ID sign, ES plan, ESCGP-1, and PPC Plan present. Site gated. Access road stable. Well drilled and in production Two brine tanks located on site located in containment unit appear sound. No IW issues noted. Previously disturbed areas restored with adequate vegetative cover. Pad adequately rocked. No accelerated erosion or sedimentation issues noted onsite or access road. Noted large rock pile on back side of pad, recommend operator remove in order to prevent a possible pollution event. No violations noted at time of inspection. | | During this inspection, Site ID sign, ES plan, ESCGP-1, and PPC Plan present. Site gated. Access road stable. Well drilled and in production Two brine tanks located on site located in containment unit appear sound. No IW issues noted. Previously disturbed areas restored with adequate vegetative cover. Pad adequately rocked. No accelerated erosion or sedimentation issues noted onsite or access road. Noted large rock pile on back side of pad, recommend operator remove in order to prevent a possible pollution event. No violations noted at time of inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 148: | Line 622: | ||
| 2011-04-29 | | 2011-04-29 | ||
| No Violations Noted | | No Violations Noted | ||
− | | At the time of inspection, valid site Id sign, ES plan, and ESCGP-1 located onsite. Site gated from third party access (, but pipeline installation ongoing during inspection). Access road stable, no accelerated ES issues. Well pad adequately stabilized with rock. Drilling completed 05/06/10. Two brine tanks located onsite and surrounded by containment unit. Disturbed areas have been seeded/mulched operator may need to reseed/mulch to achieve uniform vegetative cover; no accelerated erosion or sedimentation issues noted. Temporary | + | | At the time of inspection, valid site Id sign, ES plan, and ESCGP-1 located onsite. Site gated from third party access (, but pipeline installation ongoing during inspection). Access road stable, no accelerated ES issues. Well pad adequately stabilized with rock. Drilling completed 05/06/10. Two brine tanks located onsite and surrounded by containment unit. Disturbed areas have been seeded/mulched operator may need to reseed/mulch to achieve uniform vegetative cover; no accelerated erosion or sedimentation issues noted. Temporary bmp﾿s are in place and functioning; operator should continue to routinely monitor/maintain all bmp﾿s until all earth disturbance activities been completed and final restoration (according to regulation) is achieved. No industrial waste issues observed. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 156: | Line 632: | ||
| No Violations Noted | | No Violations Noted | ||
| well inactive. process of connecting pipeline | | well inactive. process of connecting pipeline | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 163: | Line 641: | ||
| No Violations Noted | | No Violations Noted | ||
| review of inactive status. apporved | | review of inactive status. apporved | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 177: | Line 657: | ||
No violations noted at this time. | No violations noted at this time. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 183: | Line 665: | ||
| 2012-05-04 | | 2012-05-04 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 191: | Line 675: | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection the drill pit and cuttings contained within were being removed. The Department notes that the well pad area and the access road show no sign of accelerated erosion. The Department also notes the E&S plan was onsite, implemented as designed, and properly maintained. | | At the time of inspection the drill pit and cuttings contained within were being removed. The Department notes that the well pad area and the access road show no sign of accelerated erosion. The Department also notes the E&S plan was onsite, implemented as designed, and properly maintained. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 208: | Line 694: | ||
WQS Sam Steingrabe also onsite | WQS Sam Steingrabe also onsite | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 216: | Line 704: | ||
| At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.It appears that site and previously disturbed areas have been stabilized no accelerated erosion or sedimentation issues noted. Bmp's implemented and maintained. Chevron removed a drill pit previously encapsulated by former well owners. Chevron chose to dispose of previously encapsulated pit offsite prior to drilling additional wells on this location. Pit contents and liner have been removed offsite, operator agreed to supply department with manifests for all materials removed from pit (including liner)--operator unable to account for liquid removal prior to encapsulation as it was handled by previous owner. Operator also has plans to file an Amended Restoration Report to indicate that the previously encapsulated pit has been removed off site. Based on current observation, dept concurred w/ opr proceeding w/ plans to backfill pit, it visibly appears contimanted soils/materials removed | | At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.It appears that site and previously disturbed areas have been stabilized no accelerated erosion or sedimentation issues noted. Bmp's implemented and maintained. Chevron removed a drill pit previously encapsulated by former well owners. Chevron chose to dispose of previously encapsulated pit offsite prior to drilling additional wells on this location. Pit contents and liner have been removed offsite, operator agreed to supply department with manifests for all materials removed from pit (including liner)--operator unable to account for liquid removal prior to encapsulation as it was handled by previous owner. Operator also has plans to file an Amended Restoration Report to indicate that the previously encapsulated pit has been removed off site. Based on current observation, dept concurred w/ opr proceeding w/ plans to backfill pit, it visibly appears contimanted soils/materials removed | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 223: | Line 713: | ||
| No Violations Noted | | No Violations Noted | ||
| Inspection result of operators notification that previously encapsulated pit has been successfully removed and backfilled. During today's inspection, department noted that area of previously encapsulated pit had been back filled with clean fill material, but due to recent heavy rains it appears that soil has "settled." Due soft nature of the fill it was recommended that operator add additional fill prior to rocking area to ensure that material is properly compacted and stabilized as operator has plans to drill another well on location and drill rig may be placed over area recently back filled. Again, department is currently awaiting final response from operator including disposal records, amended restoration report, as well as written report on activities undertaken for removal of previously encapsulated drill pit. | | Inspection result of operators notification that previously encapsulated pit has been successfully removed and backfilled. During today's inspection, department noted that area of previously encapsulated pit had been back filled with clean fill material, but due to recent heavy rains it appears that soil has "settled." Due soft nature of the fill it was recommended that operator add additional fill prior to rocking area to ensure that material is properly compacted and stabilized as operator has plans to drill another well on location and drill rig may be placed over area recently back filled. Again, department is currently awaiting final response from operator including disposal records, amended restoration report, as well as written report on activities undertaken for removal of previously encapsulated drill pit. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 230: | Line 722: | ||
| No Violations Noted | | No Violations Noted | ||
| Routine inspection. The site was without issues. | | Routine inspection. The site was without issues. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 239: | Line 733: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 246: | Line 742: | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production | | At the time of inspection, no E&S issues were present at the site. Gas well was not in production | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 253: | Line 751: | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production | | At the time of inspection, no E&S issues were present at the site. Gas well was not in production | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 262: | Line 762: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 271: | Line 773: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 278: | Line 782: | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection the Operator indicated that a cast iron plug was set in the well to prepare for additional wells to be drilled. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained. | | At the time of inspection the Operator indicated that a cast iron plug was set in the well to prepare for additional wells to be drilled. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 287: | Line 793: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 300: | Line 808: | ||
Access road adequately rocked and no E&S issues were noted in relation to access road. Department recommends that Operator continues to monitor and maintain access road and well-site as necessary. | Access road adequately rocked and no E&S issues were noted in relation to access road. Department recommends that Operator continues to monitor and maintain access road and well-site as necessary. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 309: | Line 819: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 316: | Line 828: | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production. | | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 323: | Line 837: | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production. | | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 332: | Line 848: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 339: | Line 857: | ||
| In Compliance with Policy | | In Compliance with Policy | ||
| Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 1/31/13. According to Mr. Small, on 1/30/13 while HWR company was loading excavator parked where access road branches off towards impoundment, hydraulic line burst, spilling approximately two quarts of hydraulic oil onto access road. Spill was immediately soaked up and the impacted gravel shoveled into drum. Samples taken, will dispose of in landfill. It appears situation was handled according to policy and a follow-up inspection will be conducted in future to ensure full compliance. | | Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 1/31/13. According to Mr. Small, on 1/30/13 while HWR company was loading excavator parked where access road branches off towards impoundment, hydraulic line burst, spilling approximately two quarts of hydraulic oil onto access road. Spill was immediately soaked up and the impacted gravel shoveled into drum. Samples taken, will dispose of in landfill. It appears situation was handled according to policy and a follow-up inspection will be conducted in future to ensure full compliance. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 348: | Line 868: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2143507 |
− | | | + | | 2013-02-22 |
− | | | + | | No Violations Noted |
− | + | | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 6H. | |
− | | | + | |
− | | | + | |
− | | | + | | |
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2144627 |
− | | | + | | 2013-02-25 |
− | | | + | | No Violations Noted |
− | + | | Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 1H had been drilled. 2H, 3H, 4H, 5H, 6H all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing.Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121603) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted in relation to well pad or access road. Department recommends that Operator remove debris from rock-lined ditches. | |
− | + | | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 2151599 |
− | | | + | | 2013-03-13 |
− | | | + | | No Violations Noted |
− | + | | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H. | |
− | | | + | |
− | | | + | |
− | | | + | | |
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2168502 |
− | | | + | | 2013-05-22 |
− | | | + | | No Violations Noted |
− | + | | Met with Curtis Small with Chevron and inspected the site. No issues were noted. | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 2169711 |
− | | | + | | 2013-05-22 |
− | | | + | | No Violations Noted |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 2173629 |
− | | | + | | 2013-06-10 |
− | | | + | | No Violations Noted |
− | | | + | | Routine inspection no issues noted. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 2228147 |
− | | | + | | 2013-11-26 |
− | | | + | | No Violations Noted |
− | + | | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H. | |
− | | | + | |
− | | | + | |
− | | | + | | |
+ | | | ||
+ | | | ||
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2228305 |
− | | | + | | 2013-10-31 |
− | + | | No Violations Noted | |
− | | | + | | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H. |
− | | | + | | |
− | + | | | |
− | | | + | | |
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2228693 |
− | | | + | | 2013-10-09 |
− | + | | No Violations Noted | |
− | | | + | | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H |
− | | | + | | |
− | + | | | |
− | | | + | | |
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2229875 |
− | | | + | | 2013-09-26 |
− | | | + | | No Violations Noted |
− | + | | At the time of inspection, no E&S issues were present at the site. Chevron was setting up drilling for well 4H. | |
− | + | ||
− | + | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 2250957 |
− | | | + | | 2013-03-05 |
− | | | + | | No Violations Noted |
− | + | | On 3/5/14 met with Joe Brusco with Chevron and inspected the site. | |
− | + | ||
− | + | The sign was correctly marked. | |
− | | | + | |
− | | | + | No mud was being drug out to the main road. |
− | | | + | |
+ | Checked in with the guard and donned the required PPE. | ||
+ | |||
+ | They were preparing the well pad for the frack equipment that will be coming on site. A road leading up to the Caymen pipeline was being reworked. This will allow the Caymen workers will have access to the pipeline. | ||
+ | |||
+ | A minor gas leak was observed at the Caymen pipeline. Chevron called Caymen and a Caymen worker responded to the site and repaired the leak. | ||
+ | |||
+ | The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed. | ||
+ | |||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2235790 |
− | | | + | | 2014-01-13 |
− | | | + | | No Violations Noted |
− | + | | On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet. | |
− | + | ||
− | + | The entrance road to the well pad was well graveled. No mud was being drug out onto the main road. | |
− | | | + | |
− | | | + | Checked in with the guard. |
− | | | + | |
+ | Walked over the impoundment and met with Harvey Horner with Nuverra. Nuverra was working on the small truck turn around pad that is adjacent and on the Northern side of the impoundment. They were adding stone to the pad. | ||
+ | |||
+ | Walked over to the well pad. The well pad was inspected. | ||
+ | |||
+ | The # 1 well was not marked. Please mark this well and notify this inspector when the well is marked. | ||
+ | |||
+ | Large plastic pipe was being unloaded onto the well pad. | ||
+ | |||
+ | No signs of spills were noticed on the well pad. | ||
+ | |||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2244496 |
− | | | + | | 2014-02-10 |
− | + | | No Violations Noted | |
− | | | + | | Met with Curtis Small and inspected the well pad. Chevron propsed aded an aditional ramp tp allow the pipeline company access to their well controls. The access road will be temporary. |
− | | | + | | |
− | + | | | |
− | | | + | | |
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2252437 |
− | + | | 2014-03-10 | |
− | | | + | | No Violations Noted |
− | + | | On 3/10/14 met with Alex Grant with Chevron and inspected the site. | |
− | + | ||
− | + | The sign was correctly marked. | |
− | + | ||
− | + | No mud was being drug out to the main road. | |
− | | | + | |
− | | | + | Checked in with the guard and donned the required PPE. |
− | + | ||
− | + | They were preparing the well pad for the frack equipment that will be coming on site. | |
− | + | ||
− | + | A road leading up to the Caymen pipeline was reworked. This will allow the Caymen workers will have access to the pipeline. | |
− | + | ||
− | + | The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed. | |
− | + | ||
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
| | | | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
|- | |- | ||
− | | | + | | 2311107 |
− | | | + | | 2014-10-08 |
− | + | | No Violations Noted | |
− | + | | Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans. | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | |||
− | |||
− | |||
− | | | ||
| | | | ||
− | |||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-111-20296 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.743583,"lon":-79.357611,"icon":""}]} |
County: Somerset | |
Municipality: Addison Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 149069 | |
Farm/Lease Name: PMG ALLEN UNIT 1H | |
First Permit Date: 2010-02-25 | |
Last Permit Date: 2010-02-25 | |
Spud Date: 2010-03-24 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 3 | |
Latitude: 39.743583 | |
Longitude: -79.357611 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 64882.0 | 24.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 209382.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-3 | DRILLING FLUID WASTE | 700.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2010-2 | FRACING FLUID WASTE | 3.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-059-24067 | DAVID R. HILL INC | BYESVILLE | OH |
2010-2 | FRACING FLUID WASTE | 495.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT | WILLIAMSPORT | PA |
2010-2 | FRACING FLUID WASTE | 365.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2010-2 | FRACING FLUID WASTE | 240.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | GROSELLE #2 - SALTYS DISPOSAL WELLS LP | GARRETTSVILLE | OH |
2010-2 | FRACING FLUID WASTE | 12.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 | RESERVED ENV SVC WASTE WATER TREATMENT FACILITY | MOUNT PLEASANT | PA |
2010-2 | FRACING FLUID WASTE | 7.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
2010-2 | PRODUCED FLUID | 4.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA LLC | NEW CASTLE | PA |
2011-2 | PRODUCED FLUID | 15.0 | Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 | HUNTERS SWIW #5 | RENO | OH |
2011-2 | PRODUCED FLUID | 946.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2011-2 | PRODUCED FLUID | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-1 | DRILLING FLUID WASTE | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-1 | FRACING FLUID WASTE | 6.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2012-1 | PRODUCED FLUID | 6.0 | Bbl | INJECTION DISPOSAL WELL | 34-121-23995 | WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL | DEXTER CITY | OH |
2012-2 | DRILL CUTTINGS | 296.16 | Tons | LANDFILL | 100419 | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | MCCLELLANDTOWN | PA |
2012-2 | DRILLING FLUID WASTE | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-2 | PRODUCED FLUID | 56.0 | Bbl | INJECTION DISPOSAL WELL | 34-121-23995 | WARREN DRILLING CO #1 (SWIW #6) | DEXTER CITY | OH |
2013-1 | DRILL CUTTINGS | 492.74 | Tons | LANDFILL | 100419 | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | MCCLELLANDTOWN | PA |
2013-1 | DRILLING FLUID WASTE | 355.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-2 | FRACING FLUID WASTE | 95.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 11.67 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | FLOWBACK FRACTURING SAND | 58.23 | Tons | LANDFILL | 76-00-08 | WASTE MANAGEMENT, INC - AMERICAN LANDFILL, INC | WAYNESBURG | OH |
2014-2 | FRACING FLUID WASTE | 28.33 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | FRACING FLUID WASTE | 2.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-2 | PRODUCED FLUID | 70.83 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1873366 | 2010-03-25 | Violation(s) Noted | At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation hour﾿s invoice. On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification. E/S plan and sign at the entrance of the access road. Sign was missing permit number. E/S plan was missing site plot and E&S controls plan. Additional site activity was occurring around pad with no E/S plans and limited E/S controls. On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release | 584177 | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | |
1873366 | 2010-03-25 | Violation(s) Noted | At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation hour﾿s invoice. On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification. E/S plan and sign at the entrance of the access road. Sign was missing permit number. E/S plan was missing site plot and E&S controls plan. Additional site activity was occurring around pad with no E/S plans and limited E/S controls. On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release | 584177 | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | |
1877308 | 2010-04-08 | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. All erosion control BMP﾿s appeared to have been implemented properly. Noted that earthmoving activity was ongoing adjacent to the drill pad. Spoke with operator Matt Barch via phone regarding this matter and he stated that this was work to construct the frac pit and that an ESCGP-1 covering this activity was obtained and was with the contractor performing site construction at that time. | |||
1880296 | 2010-04-23 | No Violations Noted | At the time of inspection, no E&S and IW issues. Pit aligned with 20 mil plastic aligned drilling pit and frac pit aligned also and security fence. No free board issues with pit. Well connected production equipment. Swab rig was present at the wellhead. Heavy equipment was on-site to start restoring site and pits. | |||
1884554 | 2010-05-12 | Violation(s) Noted | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. | 587052 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | |
1884554 | 2010-05-12 | Violation(s) Noted | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. | 587052 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | |
1884554 | 2010-05-12 | Violation(s) Noted | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. | 587053 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | |
1884554 | 2010-05-12 | Violation(s) Noted | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. | 587053 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | |
1918459 | 2010-10-06 | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Pit aligned with proper plastic and no freeboard issues. Keystone Vacuum was removing fluids from pit. E&S controls were in place. Chief was in the process of flow back and flaring gas well from Fracking procedure. Due to Chief policy of ﾿fire retardation suites﾿, DEP was not allowed to enter the site pad but was able to view the flare and site conditions from the Security station. Based on visual view of the site, the flame was showing no smoke or air quality problems. The site showed no signs of stress vegetation or air quality problems. DEP called Chief (JD Slater ﾿ Compliance Manager). He reviewed the log for Sunday and showed no reports of site air quality concerns. | |||
1922566 | 2010-10-13 | No Violations Noted | Well site properly signed with ES plan available for review during inspection. No accelerated erosion or sedimentation issues noted with well site, access road, or impoundment. Culverts, ditches, and sediment traps sufficiently rocked and functioning. Observed large amounts of sand atop pad. No pits on site, only frac tanks. No observation of industrial discharge. Operator actively repairing a ﾿minor﾿ leak on well head during our well inspection. Well fraced in Aug and recently burnt off (flared). Site was being monitored by security 24hrs a day. Accompanied by WQS Dana Burk, and WQSS Ed Ritzer. | |||
1922591 | 2010-10-14 | No Violations Noted | Operator should correct API # on sign, Frac pit w/ adequate free board | |||
1997389 | 2011-08-04 | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Well was in production. Well showing 3000 psi at wellhead and was connected to condensation unit followed by 2 ﾿ 100 bbls brine tanks. Both units located in a containment area. DEP representatives present were Paul Wyrwas and Marc Maestra. Marc inspected the site pad and perimeter of the site pad and found no issues. | |||
1997539 | 2011-08-04 | No Violations Noted | Site visit was part of routine inspection. Paul Wyrwas was present during inspection.
Well was completed and in production. BMPs were in place and effectively dealing with storm water. Brine and production tanks were in containment dikes and appeared properly constructed. No violations noted at this time. |
|||
2016289 | 2011-11-03 | No Violations Noted | During this inspection, Site ID sign, ES plan, ESCGP-1, and PPC Plan present. Site gated. Access road stable. Well drilled and in production Two brine tanks located on site located in containment unit appear sound. No IW issues noted. Previously disturbed areas restored with adequate vegetative cover. Pad adequately rocked. No accelerated erosion or sedimentation issues noted onsite or access road. Noted large rock pile on back side of pad, recommend operator remove in order to prevent a possible pollution event. No violations noted at time of inspection. | |||
1969535 | 2011-04-29 | No Violations Noted | At the time of inspection, valid site Id sign, ES plan, and ESCGP-1 located onsite. Site gated from third party access (, but pipeline installation ongoing during inspection). Access road stable, no accelerated ES issues. Well pad adequately stabilized with rock. Drilling completed 05/06/10. Two brine tanks located onsite and surrounded by containment unit. Disturbed areas have been seeded/mulched operator may need to reseed/mulch to achieve uniform vegetative cover; no accelerated erosion or sedimentation issues noted. Temporary bmp﾿s are in place and functioning; operator should continue to routinely monitor/maintain all bmp﾿s until all earth disturbance activities been completed and final restoration (according to regulation) is achieved. No industrial waste issues observed. | |||
1975389 | 2011-04-26 | No Violations Noted | well inactive. process of connecting pipeline | |||
1986075 | 2011-06-14 | No Violations Noted | review of inactive status. apporved | |||
2051538 | 2012-03-14 | No Violations Noted | Site visit was part of routine inspection.
Well was drilled and in production. Pad had been rerocked and graded. Freash water impoundment was stable and nearly full of water. Slopes and ditches were well vegetated both on pad and impoundment. No E&S issues. No violations noted at this time. |
|||
2067339 | 2012-05-04 | No Violations Noted | ||||
2069244 | 2012-05-18 | No Violations Noted | At the time of inspection the drill pit and cuttings contained within were being removed. The Department notes that the well pad area and the access road show no sign of accelerated erosion. The Department also notes the E&S plan was onsite, implemented as designed, and properly maintained. | |||
2070173 | 2012-05-10 | No Violations Noted | At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.
Site has one well currently drilled and in prodcution. Current operator, Chevron is actively "removing" a drill pit previously encapsulated by former well owners. Chevron chose to remove previously encapsulated pit offsite prior drilling additional wells on this location. At the time of this inspection, it appears that site and previsously distrubed areas have been stablized, aside from pit, no accelerated erosion or sedimentation issues noted. ES plan implemented and maintained. Reccomended that operator placed excavated pit materials on/in containment structure while awaiting to be loaded into trucks for disposal. 2nd dept also reccomended that operator ensures trucks are cleaned prior to returning with clean fill for reclamation in order to prevent a possible cross contamination pollution event No violations noted at this time. WQS Sam Steingrabe also onsite |
|||
2076225 | 2012-06-13 | No Violations Noted | At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.It appears that site and previously disturbed areas have been stabilized no accelerated erosion or sedimentation issues noted. Bmp's implemented and maintained. Chevron removed a drill pit previously encapsulated by former well owners. Chevron chose to dispose of previously encapsulated pit offsite prior to drilling additional wells on this location. Pit contents and liner have been removed offsite, operator agreed to supply department with manifests for all materials removed from pit (including liner)--operator unable to account for liquid removal prior to encapsulation as it was handled by previous owner. Operator also has plans to file an Amended Restoration Report to indicate that the previously encapsulated pit has been removed off site. Based on current observation, dept concurred w/ opr proceeding w/ plans to backfill pit, it visibly appears contimanted soils/materials removed | |||
2078166 | 2012-06-20 | No Violations Noted | Inspection result of operators notification that previously encapsulated pit has been successfully removed and backfilled. During today's inspection, department noted that area of previously encapsulated pit had been back filled with clean fill material, but due to recent heavy rains it appears that soil has "settled." Due soft nature of the fill it was recommended that operator add additional fill prior to rocking area to ensure that material is properly compacted and stabilized as operator has plans to drill another well on location and drill rig may be placed over area recently back filled. Again, department is currently awaiting final response from operator including disposal records, amended restoration report, as well as written report on activities undertaken for removal of previously encapsulated drill pit. | |||
2088107 | 2012-08-01 | No Violations Noted | Routine inspection. The site was without issues. | |||
2092836 | 2012-05-24 | No Violations Noted | Gas well was in production. No E&S issues were present during the inspection.
|
|||
2093088 | 2012-06-21 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production | |||
2094698 | 2012-08-06 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production | |||
2094798 | 2012-08-14 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production
|
|||
2095561 | 2012-08-28 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production
|
|||
2107615 | 2012-10-09 | No Violations Noted | At the time of inspection the Operator indicated that a cast iron plug was set in the well to prepare for additional wells to be drilled. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained. | |||
2120846 | 2012-11-30 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
|
|||
2121603 | 2012-11-28 | No Violations Noted | Inspection result of spud notification. Multi-well pad.
Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site. At the time of this inspection, 1H had been drilled. Actively drilling 5H, cellars for 2H,3H,4H constructed, 6H staked. Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch. Observed tophole cuttings along soil pile. Department spoke with company representative who stated plans were to incorporate cuttings into soil pile and disperse across pad. Operator will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation. Access road adequately rocked and no E&S issues were noted in relation to access road. Department recommends that Operator continues to monitor and maintain access road and well-site as necessary. |
|||
2123089 | 2012-11-12 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
|
|||
2128475 | 2012-12-17 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. | |||
2128645 | 2013-01-08 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. | |||
2130307 | 2013-01-14 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well.
|
|||
2136131 | 2013-01-31 | In Compliance with Policy | Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 1/31/13. According to Mr. Small, on 1/30/13 while HWR company was loading excavator parked where access road branches off towards impoundment, hydraulic line burst, spilling approximately two quarts of hydraulic oil onto access road. Spill was immediately soaked up and the impacted gravel shoveled into drum. Samples taken, will dispose of in landfill. It appears situation was handled according to policy and a follow-up inspection will be conducted in future to ensure full compliance. | |||
2143461 | 2013-02-11 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
|
|||
2143507 | 2013-02-22 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 6H.
|
|||
2144627 | 2013-02-25 | No Violations Noted | Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 1H had been drilled. 2H, 3H, 4H, 5H, 6H all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing.Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121603) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted in relation to well pad or access road. Department recommends that Operator remove debris from rock-lined ditches. | |||
2151599 | 2013-03-13 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.
|
|||
2168502 | 2013-05-22 | No Violations Noted | Met with Curtis Small with Chevron and inspected the site. No issues were noted. | |||
2169711 | 2013-05-22 | No Violations Noted | ||||
2173629 | 2013-06-10 | No Violations Noted | Routine inspection no issues noted. | |||
2228147 | 2013-11-26 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H.
|
|||
2228305 | 2013-10-31 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H. | |||
2228693 | 2013-10-09 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H | |||
2229875 | 2013-09-26 | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was setting up drilling for well 4H.
|
|||
2250957 | 2013-03-05 | No Violations Noted | On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
The sign was correctly marked. No mud was being drug out to the main road. Checked in with the guard and donned the required PPE. They were preparing the well pad for the frack equipment that will be coming on site. A road leading up to the Caymen pipeline was being reworked. This will allow the Caymen workers will have access to the pipeline. A minor gas leak was observed at the Caymen pipeline. Chevron called Caymen and a Caymen worker responded to the site and repaired the leak. The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed. |
|||
2235790 | 2014-01-13 | No Violations Noted | On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
The entrance road to the well pad was well graveled. No mud was being drug out onto the main road. Checked in with the guard. Walked over the impoundment and met with Harvey Horner with Nuverra. Nuverra was working on the small truck turn around pad that is adjacent and on the Northern side of the impoundment. They were adding stone to the pad. Walked over to the well pad. The well pad was inspected. The # 1 well was not marked. Please mark this well and notify this inspector when the well is marked. Large plastic pipe was being unloaded onto the well pad. No signs of spills were noticed on the well pad. |
|||
2244496 | 2014-02-10 | No Violations Noted | Met with Curtis Small and inspected the well pad. Chevron propsed aded an aditional ramp tp allow the pipeline company access to their well controls. The access road will be temporary. | |||
2252437 | 2014-03-10 | No Violations Noted | On 3/10/14 met with Alex Grant with Chevron and inspected the site.
The sign was correctly marked. No mud was being drug out to the main road. Checked in with the guard and donned the required PPE. They were preparing the well pad for the frack equipment that will be coming on site. A road leading up to the Caymen pipeline was reworked. This will allow the Caymen workers will have access to the pipeline. The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed. |
|||
2311107 | 2014-10-08 | No Violations Noted | Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans. |
For data sources see[3]