X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20304"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20304
 
| Well ID: 37-111-20304
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.757744, -79.356552 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.757744, -79.356552 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Somerset County, Pennsylvania|Somerset]]
 
| County: [[Somerset County, Pennsylvania|Somerset]]
Line 9: Line 9:
 
| Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]]
 
| Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]]
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[149073]]
+
| Well Pad ID: [[149073|149073]]
 
|-
 
|-
 
| Farm/Lease Name: PMG GRACE UNIT 1H
 
| Farm/Lease Name: PMG GRACE UNIT 1H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 39.757744
 
| Latitude: 39.757744
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 387685.0
 +
| style="text-align:right;" | 177.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 278404.0
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 216760.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 14968.0
 +
| style="text-align:right;" | 28.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 24831.0
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 24716.0
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2011-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 220.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| EPA ID: 748-163
 +
| PATRIOT WATER TREATMENT
 +
| WARREN
 +
| OH
 +
|-
 +
|-
 +
| 2011-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 781.73
 +
| Tons
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PAD013826847
 +
| MCCUTCHEON ENTERPRISES INC
 +
| APOLLO
 +
| PA
 +
|-
 +
|-
 +
| 2011-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 190.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| EPA ID: 748-163
 +
| PATRIOT WATER TREATMENT
 +
| WARREN
 +
| OH
 +
|-
 +
|-
 +
| 2011-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 410.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| EPA ID: 748-163
 +
| PATRIOT WATER TREATMENT
 +
| WARREN
 +
| OH
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 240.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 108.6
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
| RONCO WASTE PROCESSING FACILITY
 +
| MASONTOWN
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 538.5
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 7.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
| RONCO WASTE PROCESSING FACILITY
 +
| MASONTOWN
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 4.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| FLOWBACK FRACTURING SAND
 +
| style="text-align:right;" | 33.56
 +
| Tons
 +
| LANDFILL
 +
| 100280
 +
| VALLEY LANDFILL
 +
| IRWIN
 +
| PA
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 3.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 26.67
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 +
| WARREN DRILLING CO #1 (SWIW #6)
 +
| DEXTER CITY
 +
| OH
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 41: Line 346:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1997544
 
| 1997544
Line 50: Line 357:
 
No violations noted at this time.
 
No violations noted at this time.
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 56: Line 365:
 
| 2011-09-08
 
| 2011-09-08
 
| No Violations Noted
 
| No Violations Noted
|  At the time of inspection, Well ID Sign, ES plan, and ESCGP-1 present. Access road entrance and roadway appear adequately rocked and stable. Well drilled and actively being vented while onsite, not yet in production. Temporary BMPs installed according to plan (both 12in and 18in compost soxs) and functioning. Noted ¿stressed¿ vegetation alongside and surrounding sediment traps.  It appears as possible evidence that sediment traps are not properly functioning and/or water is improperly draining to traps.  Although no (active) accelerated erosion or sedimentation issues are noted during this inspection, due to recent heavy rains, it is recommend that operator examine and monitor sediment traps and areas surrounding to ensure that proper drainage is occurring  in order to prevent a possible pollution event.  Noted red staining at toe slope of pad, again previously attributed to decomposition of mulch/tress. Accompanied by WQS Marc Maestra during inspection.
+
|  At the time of inspection, Well ID Sign, ES plan, and ESCGP-1 present. Access road entrance and roadway appear adequately rocked and stable. Well drilled and actively being vented while onsite, not yet in production. Temporary BMPs installed according to plan (both 12in and 18in compost soxs) and functioning. Noted ﾿stressed﾿ vegetation alongside and surrounding sediment traps.  It appears as possible evidence that sediment traps are not properly functioning and/or water is improperly draining to traps.  Although no (active) accelerated erosion or sedimentation issues are noted during this inspection, due to recent heavy rains, it is recommend that operator examine and monitor sediment traps and areas surrounding to ensure that proper drainage is occurring  in order to prevent a possible pollution event.  Noted red staining at toe slope of pad, again previously attributed to decomposition of mulch/tress. Accompanied by WQS Marc Maestra during inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 64: Line 375:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, well sign (multi- well pad), ES Plan, ESCGP-1, PPC Plan present. Site gated and locked, as well as monitored by security.  Access road and well pad adequately rocked and maintained. Well drilled. Well head protected from third party access with metal fencing. No accelerated erosion or sedimentation issues noted during inspection. Bmp's are installed and appear to be functioning, although operator should continue to monitor and maintain all bmp's until final permanent restoration is complete.  Previously disturbed areas have been temporarily seeded/mulched with observed growth. No violations noted during this inspection.
 
| At the time of inspection, well sign (multi- well pad), ES Plan, ESCGP-1, PPC Plan present. Site gated and locked, as well as monitored by security.  Access road and well pad adequately rocked and maintained. Well drilled. Well head protected from third party access with metal fencing. No accelerated erosion or sedimentation issues noted during inspection. Bmp's are installed and appear to be functioning, although operator should continue to monitor and maintain all bmp's until final permanent restoration is complete.  Previously disturbed areas have been temporarily seeded/mulched with observed growth. No violations noted during this inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 70: Line 383:
 
| 2011-06-28
 
| 2011-06-28
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI.  9 5/8¿ pipe set at 3800 feet with Universal performed cement using gas block.  Chevron present performing site inspection.  Deviation of hole is less than 1 %.  DEP performed a site walk and did not find any issues.
+
| At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI.  9 5/8﾿ pipe set at 3800 feet with Universal performed cement using gas block.  Chevron present performing site inspection.  Deviation of hole is less than 1 %.  DEP performed a site walk and did not find any issues.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 83: Line 398:
 
No violations noted at this time.
 
No violations noted at this time.
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 97: Line 414:
 
No violations noted at this time.
 
No violations noted at this time.
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 104: Line 423:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Well head was modified in order to drill gas well Grace 2H.
 
| At the time of inspection, no E&S issues were present at the site.  Well head was modified in order to drill gas well Grace 2H.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 111: Line 432:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the site appeared to be in sound condition.  The E&S plan was onsite and properly installed and maintained.  The Department notes that a significant precipitation event occurred in the past 24 hours and the site shows no accelerated erosion on the well pad area or the access road.
 
| At the time of inspection the site appeared to be in sound condition.  The E&S plan was onsite and properly installed and maintained.  The Department notes that a significant precipitation event occurred in the past 24 hours and the site shows no accelerated erosion on the well pad area or the access road.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 118: Line 441:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the site appeared to be in sound condition.  The E&S plan was onsite and properly installed and maintained.
 
| At the time of inspection the site appeared to be in sound condition.  The E&S plan was onsite and properly installed and maintained.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 125: Line 450:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of this inspection, well sign ES plan, PPC plan, ESCGP-1 onsite. Site gated by 24hr security. Well(s) drilled. Bmp's installed and functioning according to Es plan.  No accelerated erosion or sedimentation issues noted with site or access road. No industrial waste issues present. Operator plans to drill 4H in the near future.  One roll off box located onsite. ROC Rep Blair onsite during inspection.
 
| At the time of this inspection, well sign ES plan, PPC plan, ESCGP-1 onsite. Site gated by 24hr security. Well(s) drilled. Bmp's installed and functioning according to Es plan.  No accelerated erosion or sedimentation issues noted with site or access road. No industrial waste issues present. Operator plans to drill 4H in the near future.  One roll off box located onsite. ROC Rep Blair onsite during inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 132: Line 459:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
 
| At the time of inspection, no E&S issues were present at the site.  Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 139: Line 468:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
 
| At the time of inspection, no E&S issues were present at the site.  Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 146: Line 477:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Crown rig 8 was set up on well 3H to drill the curve and horizontal section.
 
| At the time of inspection, no E&S issues were present at the site.  Crown rig 8 was set up on well 3H to drill the curve and horizontal section.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 153: Line 486:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well appeared to be drilled but not equipped for production.  The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan.  No observation of accelerated erosion or sedimentation in relation to the well pad area or access road.  The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
 
| At the time of inspection the well appeared to be drilled but not equipped for production.  The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan.  No observation of accelerated erosion or sedimentation in relation to the well pad area or access road.  The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 160: Line 495:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Gas well was not in production
 
| At the time of inspection, no E&S issues were present at the site.  Gas well was not in production
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2144612
| style="text-align:right;" | 0.0
+
| 2013-02-25
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all on-site.
| style="text-align:right;" | 0.0
+
At time of inspection, 1H drilled, but not yet equipped for production. 2H, 3H also drilled, not yet equipped for production.
| style="text-align:right;" | 0.0
+
Access road in good condition, adequately rocked. No accelerated erosion or sedimentation issues observed in relation to well pad or access road.
| style="text-align:right;" | 0.0
+
Department recommends Operator remove debris from rock-lined ditches.  
 +
Spoke to company representative Beth Smock on 2/8/13 who informed Department that a 20x20 stone pad muster point was constructed alongside access road directly before well pad entrance. At time of inspection, Department noted that muster point did not go outside LOD and observed no potential E&S issues from its construction. Dept representative Samantha Foulk field-approved this change to the E&S plan. (Refer to ESCGP-1 admin inspection ID 2150218).
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2160659
| style="text-align:right;" | 0.0
+
| 2013-04-23
| style="text-align:right;" | 0.0
+
| Pending
| style="text-align:right;" | 0.0
+
| Incident inspection.  Company reported a 10 gallon spill. Company could not find spill location. Asked company to locate spill.
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2163938
| style="text-align:right;" | 0.0
+
| 2013-05-02
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Follow up inspection to a 4/21/13 spill. Spill Cleaned up correctely.
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2169703
| style="text-align:right;" | 0.0
+
| 2013-05-22
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2182694
| style="text-align:right;" | 0.0
+
| 2013-07-11
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Met with chevron on site. No issues noted.
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2229820
| style="text-align:right;" | 0.0
+
| 2013-09-26
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| At the time of inspection, no E&S issues were present at the site. Well was in production.
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
+
|  
 
|-
 
|-
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-1
+
| 2311292
| DRILLING FLUID WASTE
+
| 2014-10-08
| style="text-align:right;" | 220.0
+
| No Violations Noted
| Bbl
+
| Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
|  
| EPA ID: 748-163
 
| PATRIOT WATER TREATMENT
 
| WARREN
 
| OH
 
|-
 
|-
 
| 2011-2
 
| DRILL CUTTINGS
 
| style="text-align:right;" | 781.73
 
| Tons
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PAD013826847
 
| MCCUTCHEON ENTERPRISE
 
| APOLLO
 
| PA
 
|-
 
|-
 
| 2011-2
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 190.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| EPA ID: 748-163
 
| PATRIOT WATER TREATMENT
 
| WARREN
 
| OH
 
|-
 
|-
 
| 2011-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 410.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| EPA ID: 748-163
 
| PATRIOT WATER TREATMENT
 
| WARREN
 
| OH
 
|-
 
|-
 
| 2012-1
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 240.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE FOR DRILLING OR PLUGGING
 
 
|  
 
|  
| PA
 
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 23:37, 25 June 2015

Well Details

Well ID: 37-111-20304
Loading map...
County: Somerset
Municipality: Addison Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149073
Farm/Lease Name: PMG GRACE UNIT 1H
First Permit Date: 2011-05-31
Last Permit Date: 2011-05-31
Spud Date: 2011-06-11
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.757744
Longitude: -79.356552

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 387685.0 177.0 0.0 0.0 0.0 0.0
2014-1 278404.0 181.0 0.0 0.0 0.0 0.0
2014-2 216760.0 184.0 0.0 0.0 0.0 0.0
2015-02 14968.0 28.0 0.0 0.0 0.0 0.0
2015-01 24831.0 31.0 0.0 0.0 0.0 0.0
2015-03 24716.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 DRILLING FLUID WASTE 220.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163 PATRIOT WATER TREATMENT WARREN OH
2011-2 DRILL CUTTINGS 781.73 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD013826847 MCCUTCHEON ENTERPRISES INC APOLLO PA
2011-2 FRACING FLUID WASTE 190.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163 PATRIOT WATER TREATMENT WARREN OH
2011-2 PRODUCED FLUID 410.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163 PATRIOT WATER TREATMENT WARREN OH
2012-1 DRILLING FLUID WASTE 240.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 108.6 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 FRACING FLUID WASTE 538.5 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 FRACING FLUID WASTE 7.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FLOWBACK FRACTURING SAND 33.56 Tons LANDFILL 100280 VALLEY LANDFILL IRWIN PA
2014-1 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 26.67 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1997544 2011-08-04 No Violations Noted Site visit was part of routine inspection. Paule Wyrwas was present during inspection. Spoke with Tim Trib, Chief Company Man on site.

UDI Rig 59 was actively drilling. Drainage pipe mentioned in previous inspection was still flowing fresh water. No further erosion. Red staining was still apparent but did not seem larger and was mostly dry. No violations noted at this time.

2003200 2011-09-08 No Violations Noted At the time of inspection, Well ID Sign, ES plan, and ESCGP-1 present. Access road entrance and roadway appear adequately rocked and stable. Well drilled and actively being vented while onsite, not yet in production. Temporary BMPs installed according to plan (both 12in and 18in compost soxs) and functioning. Noted ﾿stressed﾿ vegetation alongside and surrounding sediment traps. It appears as possible evidence that sediment traps are not properly functioning and/or water is improperly draining to traps. Although no (active) accelerated erosion or sedimentation issues are noted during this inspection, due to recent heavy rains, it is recommend that operator examine and monitor sediment traps and areas surrounding to ensure that proper drainage is occurring in order to prevent a possible pollution event. Noted red staining at toe slope of pad, again previously attributed to decomposition of mulch/tress. Accompanied by WQS Marc Maestra during inspection.
2016742 2011-11-03 No Violations Noted At the time of inspection, well sign (multi- well pad), ES Plan, ESCGP-1, PPC Plan present. Site gated and locked, as well as monitored by security. Access road and well pad adequately rocked and maintained. Well drilled. Well head protected from third party access with metal fencing. No accelerated erosion or sedimentation issues noted during inspection. Bmp's are installed and appear to be functioning, although operator should continue to monitor and maintain all bmp's until final permanent restoration is complete. Previously disturbed areas have been temporarily seeded/mulched with observed growth. No violations noted during this inspection.
1985992 2011-06-28 No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI. 9 5/8﾿ pipe set at 3800 feet with Universal performed cement using gas block. Chevron present performing site inspection. Deviation of hole is less than 1 %. DEP performed a site walk and did not find any issues.
1986652 2011-06-30 No Violations Noted Site visit was part of routine inspection. Spoke with Bill Delcambre, Chief Company Man on site.

UDI Rig 59 was actively drilling. McCutcheon was cleaning fresh water tanks and drilling mud tanks. On the north toe of slope of the pad a small diameter pipe was draining what appeared to be fresh water from underneath the site. Some on site erosion had taken place along this outfall. No sediment had left the site. Also, some red staining and standing water was evident along the rock channel after the outfall of the sediment trap. Construction was being conducted on the adjacent fresh water storage impoundment. No violations noted at this time.

2051548 2012-03-14 No Violations Noted Site visit was part of routine inspection.

Well was drilled and in production. Pad had been rerocked and graded. Freash water impoundment was stable and nearly full of water. Slopes and ditches were well vegetated both on pad and impoundment. No E&S issues. No violations noted at this time.

2067333 2012-05-04 No Violations Noted At the time of inspection, no E&S issues were present at the site. Well head was modified in order to drill gas well Grace 2H.
2069203 2012-05-10 No Violations Noted At the time of inspection the site appeared to be in sound condition. The E&S plan was onsite and properly installed and maintained. The Department notes that a significant precipitation event occurred in the past 24 hours and the site shows no accelerated erosion on the well pad area or the access road.
2069224 2012-05-18 No Violations Noted At the time of inspection the site appeared to be in sound condition. The E&S plan was onsite and properly installed and maintained.
2078296 2012-06-20 No Violations Noted At the time of this inspection, well sign ES plan, PPC plan, ESCGP-1 onsite. Site gated by 24hr security. Well(s) drilled. Bmp's installed and functioning according to Es plan. No accelerated erosion or sedimentation issues noted with site or access road. No industrial waste issues present. Operator plans to drill 4H in the near future. One roll off box located onsite. ROC Rep Blair onsite during inspection.
2094686 2012-08-06 No Violations Noted At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
2094814 2012-08-14 No Violations Noted At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
2095539 2012-08-28 No Violations Noted At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 3H to drill the curve and horizontal section.
2107614 2012-10-09 No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2123137 2012-12-12 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2144612 2013-02-25 No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all on-site.

At time of inspection, 1H drilled, but not yet equipped for production. 2H, 3H also drilled, not yet equipped for production. Access road in good condition, adequately rocked. No accelerated erosion or sedimentation issues observed in relation to well pad or access road. Department recommends Operator remove debris from rock-lined ditches. Spoke to company representative Beth Smock on 2/8/13 who informed Department that a 20x20 stone pad muster point was constructed alongside access road directly before well pad entrance. At time of inspection, Department noted that muster point did not go outside LOD and observed no potential E&S issues from its construction. Dept representative Samantha Foulk field-approved this change to the E&S plan. (Refer to ESCGP-1 admin inspection ID 2150218).

2160659 2013-04-23 Pending Incident inspection. Company reported a 10 gallon spill. Company could not find spill location. Asked company to locate spill.
2163938 2013-05-02 No Violations Noted Follow up inspection to a 4/21/13 spill. Spill Cleaned up correctely.
2169703 2013-05-22 No Violations Noted
2182694 2013-07-11 No Violations Noted Met with chevron on site. No issues noted.
2229820 2013-09-26 No Violations Noted At the time of inspection, no E&S issues were present at the site. Well was in production.
2311292 2014-10-08 No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[3]

References