X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28619"

m
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
Line 27: Line 28:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 18:31, 3 July 2014

Well Details

Well ID: 37-129-28619
Loading map...
County: Westmoreland
Municipality: Donegal Township
Operator Name: WPX ENERGY APPALACHIA LLC
First Permit Date: 2011-07-08
Last Permit Date: 2011-07-08
Spud Date: None
Unconventional: Yes
Horizontal: Yes
Violations: None
Latitude: 40.149102
Longitude: -79.350402

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1983752 2011-06-21 No Violations Noted Site visit was in response to OG-57 waiver request for a site within 100 feet of a wetland. Waiver is being approved with the following comments. Site will be reworking a previously built pad and well and expanding it. Currently no disturbance was within 100 feet of the wetlands. Proper BMPs should be installed and maintain to protect the wetland area from all erosion and sedimentation.
2016823 2011-11-03 No Violations Noted Site visit was due to spud notification.

Rig on site drilling top hole. HRI was actively building fresh water storage impoundment. Toes of slope had been hydroseeded early in the morning. BMPs in place and working properly. Pits dug but not yet lined. No violations noted.

2024889 2011-11-23 No Violations Noted HORIZONTAL MARCELLUS

PATTERSON RIG 480 DRILLING ON WILLIAMS PAD. E&S, PITS, AND HOUSE KEEPING GOOD

2026140 2011-12-12 No Violations Noted Site visit was due to spud notification.

Patterson-UTI Rig 480 was on site. Jack Deuitt and Dave Sheffield were the company men. Impoundment construction was complete. Site pad was rutted and very muddy. Company men stated that new stone would be installed after rig skid. BMPs were in place. Drill pit was installed and sound. One side of pit was near capacity (but within freeboard limits) with fluid. Company men were notified. No violations noted at this time.

2043159 2012-02-10 No Violations Noted Site visit was part of routine inspection.

Rig had completed drilling and was removed from site. Pits were being dewatered and were scheduled fro removeal early next week. Access road and site were stable. E&S controls were in place and functioning properly. No violations noted at this time.

2065873 2012-05-08 No Violations Noted No issues noted on site.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

References