X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-23173"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-23173
 
| Well ID: 37-125-23173
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.226357, -80.516472 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.226357, -80.516472 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Washington County, Pennsylvania|Washington]]
 
| County: [[Washington County, Pennsylvania|Washington]]
Line 9: Line 9:
 
| Municipality: [[Independence Township, Washington County, Pennsylvania|Independence Township]]
 
| Municipality: [[Independence Township, Washington County, Pennsylvania|Independence Township]]
 
|-
 
|-
| Operator Name: [[RANGE RESOURCES APPALACHIA LLC|RANGE RESOURCES APPALACHIA LLC]]
+
| Operator Name: [[RANGE RESOURCES APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[147866]]
+
| Well Pad ID: [[147866|147866]]
 
|-
 
|-
 
| Farm/Lease Name: BROWNLEE 1H
 
| Farm/Lease Name: BROWNLEE 1H
Line 25: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Producing: No
+
| Well Status: ACTIVE
 
|-
 
|-
 
| Violations: 6
 
| Violations: 6
Line 32: Line 32:
 
|-
 
|-
 
| Longitude: -80.516472
 
| Longitude: -80.516472
|-
 
|}
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | DATE
 
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
|-
 
| 1731843
 
| 2008-08-27
 
| No Violations Noted
 
| Complaint about stream being dried up - no hard evidence that Range caused situation - gave them PPOP
 
|
 
|-
 
|-
 
| 1853132
 
| 2009-12-18
 
| No Violations Noted
 
| Inactive status applied for on this well. Cellar full of water and covered. Appears well is not completed beyond the vertical bore as stated in completion report. No open pit and site partially reclaimed.
 
|
 
|-
 
|-
 
| 1955612
 
| 2011-03-02
 
| Violation(s) Noted
 
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 
| 606148
 
|-
 
|-
 
| 1955612
 
| 2011-03-02
 
| Violation(s) Noted
 
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 
| 606149
 
|-
 
|-
 
| 1955612
 
| 2011-03-02
 
| Violation(s) Noted
 
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 
| 606150
 
|-
 
|-
 
| 1955612
 
| 2011-03-02
 
| Violation(s) Noted
 
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 
| 606151
 
|-
 
|-
 
| 1955612
 
| 2011-03-02
 
| Violation(s) Noted
 
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 
| 606152
 
|-
 
|-
 
| 1955612
 
| 2011-03-02
 
| Violation(s) Noted
 
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 
| 606153
 
|-
 
|-
 
| 2011277
 
| 2011-10-07
 
| No Violations Noted
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
Line 115: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2011-0
+
| 2008-0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2009-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 133: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2011-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 142: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2008-0
+
| 2011-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 151: Line 89:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 164: Line 108:
 
|-
 
|-
 
| 2008-0
 
| 2008-0
| FRACKING FLUID
+
| DRILLING
| style="text-align:right;" | 5866.0
+
| style="text-align:right;" | 906.0
 
| Bbl
 
| Bbl
 
| MUNICIPAL SEWAGE TREATMENT PLANT
 
| MUNICIPAL SEWAGE TREATMENT PLANT
 +
| PA0026158
 +
| MON VALLEY SEWAGE AUTHORITY SEWAGE TREATMENT PLANT
 
|  
 
|  
| CHARLEROI BORO STP
+
| PA
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 2008-0
 
| 2008-0
 
| DRILLING
 
| DRILLING
| style="text-align:right;" | 7266.0
+
| style="text-align:right;" | 6.0
 
| Bbl
 
| Bbl
| MUNICIPAL SEWAGE TREATMENT PLANT
+
| OTHER
 +
|
 
|  
 
|  
| MON VALLEY STP
 
 
|  
 
|  
 
|  
 
|  
Line 187: Line 131:
 
| 2008-0
 
| 2008-0
 
| FRACKING FLUID
 
| FRACKING FLUID
| style="text-align:right;" | 5866.0
+
| style="text-align:right;" | 2.0
 
| Bbl
 
| Bbl
 
| MUNICIPAL SEWAGE TREATMENT PLANT
 
| MUNICIPAL SEWAGE TREATMENT PLANT
|  
+
| PA0026891
| MON VALLEY STP
+
| CHARLEROI BORO AUTHORITY
|  
+
| CHARLEROI
|  
+
| PA
 
|-
 
|-
 
|-
 
|-
 
| 2008-0
 
| 2008-0
| DRILLING
+
| FRACKING FLUID
| style="text-align:right;" | 7266.0
+
| style="text-align:right;" | 3.0
 
| Bbl
 
| Bbl
| OTHER
+
| MUNICIPAL SEWAGE TREATMENT PLANT
|  
+
| PA0026158
| NOT LISTED
+
| MON VALLEY SEWAGE AUTHORITY SEWAGE TREATMENT PLANT
|
 
 
|  
 
|  
 +
| PA
 
|-
 
|-
 
|-
 
|-
Line 213: Line 157:
 
| OTHER
 
| OTHER
 
|  
 
|  
| NOT LISTED
+
|  
 
|  
 
|  
 
|  
 
|  
Line 220: Line 164:
 
| 2009-0
 
| 2009-0
 
| DRILLING
 
| DRILLING
| style="text-align:right;" | 1064.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| OTHER
 
| OTHER
 
|  
 
|  
| NOT LISTED
+
|  
 
|  
 
|  
 
|  
 
|  
Line 235: Line 179:
 
| OTHER
 
| OTHER
 
|  
 
|  
| NOT LISTED
+
|  
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1731843
 +
| 2008-08-27
 +
| No Violations Noted
 +
| Complaint about stream being dried up - no hard evidence that Range caused situation - gave them PPOP
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1853132
 +
| 2009-12-18
 +
| No Violations Noted
 +
| Inactive status applied for on this well. Cellar full of water and covered. Appears well is not completed beyond the vertical bore as stated in completion report. No open pit and site partially reclaimed.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1955612
 +
| 2011-03-02
 +
| Violation(s) Noted
 +
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 +
| 606148
 +
| 78.53 - Failure to implement and maintain BMPs in accordance with Chapter 102.
 +
|
 +
|-
 +
|-
 +
| 1955612
 +
| 2011-03-02
 +
| Violation(s) Noted
 +
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 +
| 606149
 +
| 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
 +
|
 +
|-
 +
|-
 +
| 1955612
 +
| 2011-03-02
 +
| Violation(s) Noted
 +
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 +
| 606150
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
|
 +
|-
 +
|-
 +
| 1955612
 +
| 2011-03-02
 +
| Violation(s) Noted
 +
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 +
| 606151
 +
| 102.4HQBMP - Failure to implement Special Protection BMPs for HQ or EV stream.
 +
|
 +
|-
 +
|-
 +
| 1955612
 +
| 2011-03-02
 +
| Violation(s) Noted
 +
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 +
| 606152
 +
| 105.11 - Water obstruction or encroachment constructed, operated, maintained, modified, enlarged or abandoned without a 105 permit.
 +
|
 +
|-
 +
|-
 +
| 1955612
 +
| 2011-03-02
 +
| Violation(s) Noted
 +
| I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter  was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached.
 +
| 606153
 +
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 +
|
 +
|-
 +
|-
 +
| 2011277
 +
| 2011-10-07
 +
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 01:06, 25 June 2015

Well Details

Well ID: 37-125-23173
Loading map...
County: Washington
Municipality: Independence Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 147866
Farm/Lease Name: BROWNLEE 1H
First Permit Date: 2008-05-20
Last Permit Date: 2008-05-20
Spud Date: 2008-08-18
Unconventional: Yes
Horizontal: No
Well Status: ACTIVE
Violations: 6
Latitude: 40.226357
Longitude: -80.516472

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2008-0 DRILLING 906.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT PA0026158 MON VALLEY SEWAGE AUTHORITY SEWAGE TREATMENT PLANT PA
2008-0 DRILLING 6.0 Bbl OTHER
2008-0 FRACKING FLUID 2.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT PA0026891 CHARLEROI BORO AUTHORITY CHARLEROI PA
2008-0 FRACKING FLUID 3.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT PA0026158 MON VALLEY SEWAGE AUTHORITY SEWAGE TREATMENT PLANT PA
2009-0 BRINE 208.0 Bbl OTHER
2009-0 DRILLING 1.0 Bbl OTHER
2009-0 FRACKING FLUID 150.0 Bbl OTHER

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1731843 2008-08-27 No Violations Noted Complaint about stream being dried up - no hard evidence that Range caused situation - gave them PPOP
1853132 2009-12-18 No Violations Noted Inactive status applied for on this well. Cellar full of water and covered. Appears well is not completed beyond the vertical bore as stated in completion report. No open pit and site partially reclaimed.
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606148 78.53 - Failure to implement and maintain BMPs in accordance with Chapter 102.
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606149 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606150 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606151 102.4HQBMP - Failure to implement Special Protection BMPs for HQ or EV stream.
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606152 105.11 - Water obstruction or encroachment constructed, operated, maintained, modified, enlarged or abandoned without a 105 permit.
1955612 2011-03-02 Violation(s) Noted I inspected this site on 03/02/2011 for ESCGP-1 (ESX10-125-0062) Major Modification Application (submitted on 01/13/2011). A deficiency letter was sent on 01/21/2011, but the response on 02/22/2011 didn't include all information related with the deficiencies. However, I found the site constructions were different from the drawings (plans) originally issued on 08/16/2010 (e.g. pipeline, impoundment, etc.). Impoundments were not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table. In addition, the inspection found "failure to implement Special Protection BMPs for HQ or EV stream." The pipelines were also found where they were not indicated and/or not located in the valid ESCGP-1and on stream w/o 105 permits. See the details attached. 606153 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
2011277 2011-10-07 No Violations Noted

For data sources see[3]

References