X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28534"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28534
 
| Well ID: 37-129-28534
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.174502, -79.696422 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.174502, -79.696422 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[South Huntingdon Township, Westmoreland County, Pennsylvania|South Huntingdon Township]]
 
|-
 
|-
 
| Operator Name: [[BARON GROUP INC]]
 
| Operator Name: [[BARON GROUP INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: D EVANS 8
 
|-
 
|-
 
| First Permit Date: 2011-02-17
 
| First Permit Date: 2011-02-17
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.174502
 
| Latitude: 40.174502
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2011-0
| style="text-align:right;" | 3918.89
+
| style="text-align:right;" | 2385.9
| style="text-align:right;" | 365.0
+
| style="text-align:right;" | 91.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 62:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2013-0
| style="text-align:right;" | 2385.9
+
| style="text-align:right;" | 3918.89
| style="text-align:right;" | 91.0
+
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 4148.76
 +
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 80:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 79: Line 104:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 85: Line 110:
 
|-
 
|-
 
| 2011-0
 
| 2011-0
| FRACING FLUID WASTE
+
| DRILLING FLUID WASTE
| style="text-align:right;" | 375.0
+
| style="text-align:right;" | 100.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| PA0095273
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
| CREEKSIDE
+
| JOSEPHINE
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
 
| 2011-0
 
| 2011-0
| DRILLING FLUID WASTE
+
| FRACING FLUID WASTE
| style="text-align:right;" | 100.0
+
| style="text-align:right;" | 375.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095273
+
| PA0095443
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| CREEKSIDE TREATMENT FACILITY
| JOSEPHINE
+
| CREEKSIDE
 
| PA
 
| PA
 
|-
 
|-
Line 112: Line 137:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
Line 128: Line 153:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 135: Line 166:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1984247
 
| 1984247
Line 140: Line 173:
 
| No Violations Noted
 
| No Violations Noted
 
| LOCATION BUILT, FENCE AROUND PIT, AND E&S CONTROLS.
 
| LOCATION BUILT, FENCE AROUND PIT, AND E&S CONTROLS.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 147: Line 182:
 
| No Violations Noted
 
| No Violations Noted
 
| Drill rig located onsite and drilling was ongoing at the time of the inspection.  Drill pit onsite and it had more than the required two feet of lined freeboard.  Site required minimal erosion controls due to the location being in a field with dense vegetation.  Operator should continue to monitor the site to insure compliance with all apllicable regulations until completion of well development activities.
 
| Drill rig located onsite and drilling was ongoing at the time of the inspection.  Drill pit onsite and it had more than the required two feet of lined freeboard.  Site required minimal erosion controls due to the location being in a field with dense vegetation.  Operator should continue to monitor the site to insure compliance with all apllicable regulations until completion of well development activities.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 154: Line 191:
 
| No Violations Noted
 
| No Violations Noted
 
| Whipstock Rig #20 drilling the D. Evans #8 well permit #129-28534 for the Baron Group.  Depth of 2550' pit good, house keeping good and E&S controls in place.
 
| Whipstock Rig #20 drilling the D. Evans #8 well permit #129-28534 for the Baron Group.  Depth of 2550' pit good, house keeping good and E&S controls in place.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 165: Line 204:
 
While on location I attempted to gather and/or confirm all available information to assemble a time line of well construction vs. water supply.  See pages 2-4 for additional information on timeline investigation
 
While on location I attempted to gather and/or confirm all available information to assemble a time line of well construction vs. water supply.  See pages 2-4 for additional information on timeline investigation
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 18:30, 26 June 2015

Well Details

Well ID: 37-129-28534
Loading map...
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: BARON GROUP INC
Well Pad ID:
Farm/Lease Name: D EVANS 8
First Permit Date: 2011-02-17
Last Permit Date: 2011-02-17
Spud Date: 2011-08-20
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.174502
Longitude: -79.696422

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 2385.9 91.0 0.0 0.0 0.0 0.0
2012-0 5045.0 366.0 0.0 0.0 0.0 0.0
2013-0 3918.89 365.0 0.0 0.0 0.0 0.0
2014-0 4148.76 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-0 DRILLING FLUID WASTE 160.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 DRILLING FLUID WASTE 100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-0 FRACING FLUID WASTE 375.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 FRACING FLUID WASTE 870.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2013-0 PRODUCED FLUID 30.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW003 FLUID RECOVERY SERVICE ROUSEVILLE FACILITY PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1984247 2011-06-19 No Violations Noted LOCATION BUILT, FENCE AROUND PIT, AND E&S CONTROLS.
1997913 2011-08-22 No Violations Noted Drill rig located onsite and drilling was ongoing at the time of the inspection. Drill pit onsite and it had more than the required two feet of lined freeboard. Site required minimal erosion controls due to the location being in a field with dense vegetation. Operator should continue to monitor the site to insure compliance with all apllicable regulations until completion of well development activities.
2002895 2011-08-24 No Violations Noted Whipstock Rig #20 drilling the D. Evans #8 well permit #129-28534 for the Baron Group. Depth of 2550' pit good, house keeping good and E&S controls in place.
2003529 2011-08-23 No Violations Noted Whipstock 20 preparing to run 7 inch casing and cement. Site clean, E&S good, no problems at this time.

While on location I attempted to gather and/or confirm all available information to assemble a time line of well construction vs. water supply. See pages 2-4 for additional information on timeline investigation Whipstock 20 preparing to run 7 inch casing and cement. Site clean, E&S good, no problems at this time. While on location I attempted to gather and/or confirm all available information to assemble a time line of well construction vs. water supply. See pages 2-4 for additional information on timeline investigation

For data sources see[3]

References