X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20191"

(Added spill content)
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-131-20191
 
| Well ID: 37-131-20191
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.597869, -75.985947 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.597869, -75.985947 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Wyoming County, Pennsylvania|Wyoming]]
 
| County: [[Wyoming County, Pennsylvania|Wyoming]]
Line 9: Line 9:
 
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
 
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
 
|-
 
|-
| Operator Name: [[wikipedia:CARRIZO (MARCELLUS) LLC|CARRIZO (MARCELLUS) LLC]]
+
| Operator Name: [[CARRIZO (MARCELLUS) LLC]]
 
|-
 
|-
| Well Pad ID: [[145304]]
+
| Well Pad ID: [[145304|145304]]
 
|-
 
|-
 
| Farm/Lease Name: YARASAVAGE 1H
 
| Farm/Lease Name: YARASAVAGE 1H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: 2
+
| Violations: 6
 
|-
 
|-
 
| Latitude: 41.597869
 
| Latitude: 41.597869
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
==2013 Flowback Spill==
+
== Production Data ==
On March 13, 2013, a piece of equipment in [[CARRIZO (MARCELLUS) LLC|Carrizo's]] [[37-131-20191|YaharaSavage 1H]] well in [[Washington Township, Wyoming County, Pennsylvania]] broke during the final stages of drilling, releasing more than 200,000 gallons of flowback.<ref>{{cite news
 
| url =http://stateimpact.npr.org/pennsylvania/2013/03/15/dep-begins-probe-of-wyoming-county-gas-well-spill/
 
| first =Marie
 
| last =Cusick
 
| title =DEP Begins Probe of Wyoming County Gas Well Spill
 
| accessdate =07/18/2014}}</ref> Three families were evacuated due to concern of combustible natural gas build-up in the area, and were able to return the next day. Carrizo provided fresh water for the area residents until tests had been conducted showing that their water was still safe to drink. Residents were pleased with how Carrizo handled the situation.<ref>http://stateimpact.npr.org/pennsylvania/2013/03/19/after-fracking-wastewater-spill-residents-and-regulators-believe-water-is-safe/</ref> Contamination from the spill was mostly contained, though some got into shallow groundwater.<ref>http://stateimpact.npr.org/pennsylvania/2013/03/29/cause-of-wyoming-county-well-spill-still-unknown/</ref> Because of the size of the spill and the groundwater contamination, in addition to a later 9,000-gallon spill in April 2013, Carrizo was fined $192,044 by the DEP in June 2014.<ref>http://stateimpact.npr.org/pennsylvania/2014/06/19/dep-fines-carrizo-190k-for-wyoming-county-spills/</ref>
 
== Inspection Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 1993133
+
| 2011-2
| 2011-08-04
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2002322
+
| 2012-1
| 2011-08-04
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2017943
+
| 2012-2
| 2011-11-08
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Northeast Energy Rig 10                  Comp. Man - Don Hackford
+
| style="text-align:right;" | 0.0
Continue to clean up mud on containment.
+
| style="text-align:right;" | 0.0
Prob. cement 13 3/8" in AM
+
| style="text-align:right;" | 0.0
Checked drillers log - at 468'.
+
| style="text-align:right;" | 0.0
20" @ 30' on 8/11/11 w/ 4.16 yds.
 
 
 
|  
 
 
|-
 
|-
 
|-
 
|-
| 2036968
+
| 2013-1
| 2012-01-25
+
| style="text-align:right;" | 24172.0
| Violation(s) Noted
+
| style="text-align:right;" | 8.0
|  
+
| style="text-align:right;" | 0.0
| 630384
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2036968
+
| 2013-2
| 2012-01-25
+
| style="text-align:right;" | 354468.0
| Violation(s) Noted
+
| style="text-align:right;" | 123.0
|  
+
| style="text-align:right;" | 0.0
| 630385
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2073039
+
| 2014-1
| 2012-06-04
+
| style="text-align:right;" | 858908.0
| No Violations Noted
+
| style="text-align:right;" | 177.0
| drilling ahead at 13,810
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2014-2
 +
| style="text-align:right;" | 808697.0
 +
| style="text-align:right;" | 169.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 250.65
 +
| style="text-align:right;" | 1.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 115: Line 116:
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2015-01
| style="text-align:right;" | 0.0
+
| style="text-align:right;" | 144547.24
| style="text-align:right;" | 0.0
+
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 124: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 133: Line 134:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 144: Line 151:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-2
 
| DRILL CUTTINGS
 
| style="text-align:right;" | 99.11
 
| Tons
 
| LANDFILL
 
| 301626
 
| WHITE PINES LANDFILL
 
| MILLVILLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
Line 169: Line 165:
 
| 2012-1
 
| 2012-1
 
| DRILL CUTTINGS
 
| DRILL CUTTINGS
| style="text-align:right;" | 35.0
+
| style="text-align:right;" | 1.0
 +
| Tons
 +
| LANDFILL
 +
| 301626
 +
| WHITE PINES LANDFILL
 +
| MILLVILLE
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 99.11
 
| Tons
 
| Tons
 
| LANDFILL
 
| LANDFILL
Line 175: Line 182:
 
| WHITE PINES LANDFILL
 
| WHITE PINES LANDFILL
 
| MILLVILLE
 
| MILLVILLE
 +
| PA
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 7.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 3.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 +
| SHASKAS SOUTH PAD
 +
| MONTROSE
 +
| PA
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 57.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 +
| SHASKAS SOUTH PAD
 +
| MONTROSE
 +
| PA
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 212.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR119
 +
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
 +
| WILLIAMSPORT
 +
| PA
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 6.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC010
 +
| HYDRO RECOVERY LP ANTRIM FACILITY
 +
| WELLSBORO
 +
| PA
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 6.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR0123
 +
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 +
| BLOSSBURG
 +
| PA
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 194.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 15FEBU
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 0.02
 +
| Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
| TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
| PA
 +
|-
 +
|-
 +
| 15-Jan
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 72.51
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR0123
 +
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 +
| BLOSSBURG
 +
| PA
 +
|-
 +
|-
 +
| 15FEBU
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 0.02
 +
| Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
| TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE
 +
|
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1993133
 +
| 2011-08-04
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2002322
 +
| 2011-08-04
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2017943
 +
| 2011-11-08
 +
| No Violations Noted
 +
| Northeast Energy Rig 10                  Comp. Man - Don Hackford
 +
Continue to clean up mud on containment.
 +
Prob. cement 13 3/8" in AM
 +
Checked drillers log - at 468'.
 +
20" @ 30' on 8/11/11 w/ 4.16 yds.
  
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2036968
 +
| 2012-01-25
 +
| Violation(s) Noted
 +
|
 +
| 630384
 +
| 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
 +
| Release of material near mixing tank (mostly contained) and a release near the oil-based drilling mud tank (entirely off containment).  Not notification received by the Department.
 +
|-
 +
|-
 +
| 2036968
 +
| 2012-01-25
 +
| Violation(s) Noted
 +
|
 +
| 630385
 +
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
 +
| Release of material near mixing tank (mostly contained) and another release near the oil-based mud tank (entirely off containment).
 +
|-
 +
|-
 +
| 2073039
 +
| 2012-06-04
 +
| No Violations Noted
 +
| drilling ahead at 13,810
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2148413
 +
| 2013-03-14
 +
| Outstanding Violations - No Viols Req'd
 +
| On site responding to wellhead failure that occured last night(3/13/13) at around 1800PM during 23rd stage of frac.  Carrizo personel presented thier plan of action.  Waited for all equipment to arrive at site.  Began operations at 1100 AM.  At 12:06 PM, recieved a phone call from Tom Weller, Carrizo,  that well was shut in. Recieved confirmation at 13:20 PM that  well was shut, from Jim Pritts, Carrizo VP.  Went onto pad and talked to Tom Weller briefly.  They will set 2 bridge plugs in well.
 +
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2148420
 +
| 2013-03-13
 +
| Pending
 +
| well control incident arrived 18:00 3/13/13,
 +
boltd flange connection leaking below master valve.
 +
fluid escape partially under control Boots and Coots well control
 +
operational people arrived approx 05:00 14 th formulated plan
 +
to cap well
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2148854
 +
| 2013-03-14
 +
| No Violations Noted
 +
| Everything still under control from incident. Engineers stating they plan on setting multiple bridge plugs as final stage. Currently do not plan on continuing fract. Goals are to set plugs; break down iron and get site secured for cleanup of fluids. Carrizo to advise us of depths and plugs to be set.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2148881
 +
| 2013-03-14
 +
| Outstanding Violations - No Viols Req'd
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2149675
 +
| 2013-03-19
 +
| Outstanding Violations - No Viols Req'd
 +
| Site is snow covered.  Comp Man - Jim Pritts
 +
Carrizo is investigating mouse holes.  They believe there were 3 on site, and that 2 were cased and 1 was not - still excavating & checking.  Work is ongoing.
 +
Saw some of the cleanup - pits, monitoring wells, etc.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2150281
 +
| 2013-03-13
 +
| Violation(s) Noted
 +
|
 +
| 663421
 +
| 78.73A - Operator shall prevent gas and other fluids from lower formations from entering fresh groundwater.
 +
|
 +
|-
 +
|-
 +
| 2150281
 +
| 2013-03-13
 +
| Violation(s) Noted
 +
|
 +
| 663422
 +
| 401 CSL - Discharge of pollultional material to waters of Commonwealth.
 +
|
 +
|-
 +
|-
 +
| 2150281
 +
| 2013-03-13
 +
| Violation(s) Noted
 +
|
 +
| 663423
 +
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 +
|
 +
|-
 +
|-
 +
| 2150281
 +
| 2013-03-13
 +
| Violation(s) Noted
 +
|
 +
| 663424
 +
| 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances.
 +
|
 +
|-
 +
|-
 +
| 2154546
 +
| 2013-04-04
 +
| Outstanding Violations - No Viols Req'd
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2155713
 +
| 2013-04-11
 +
| Outstanding Violations - No Viols Req'd
 +
| Sample Results for water collected from Roadside Pit.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2155825
 +
| 2013-04-12
 +
| Outstanding Violations - No Viols Req'd
 +
| Received sample results for 3/14/2013 sampling.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2156512
 +
| 2013-04-15
 +
| Outstanding Violations - No Viols Req'd
 +
| Sample results of Taques Creek collected on 3/14/2013.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2157254
 +
| 2013-04-16
 +
| Outstanding Violations - No Viols Req'd
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2159845
 +
| 2013-04-22
 +
| Outstanding Violations - No Viols Req'd
 +
| Sample Results for nearby surface water collected on 3/15/2013.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2161150
 +
| 2013-04-25
 +
| Outstanding Violations - No Viols Req'd
 +
| Surface Water Analysis Results
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2161809
 +
| 2013-04-29
 +
| Outstanding Violations - No Viols Req'd
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2167762
 +
| 2013-05-21
 +
| Outstanding Violations - No Viols Req'd
 +
| Received surface water sample results from collection on 4/17/2013.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2169585
 +
| 2013-05-28
 +
| Outstanding Violations - No Viols Req'd
 +
| Conducted an inspection of the additional containment measures that were implemented to control fluids.  Fracking with other than freshwater had not commenced until the conclusion of this inspection.  Additional measures implemented at the site appear to have the potential to thoroughly address any further incident should it occur.  Some of the measures that were improved upon were the utilization of seperate manifolds and gauging for freshwater and produced water, backflow preventers and capability for lockout of produced water had been installed,  and tertiary containment was implemented in areas where the greatest potential for release exists.
 +
|
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Inspection Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 00:19, 26 June 2015

Well Details

Well ID: 37-131-20191
Loading map...
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Well Pad ID: 145304
Farm/Lease Name: YARASAVAGE 1H
First Permit Date: 2011-07-13
Last Permit Date: 2011-07-13
Spud Date: 2011-08-05
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 6
Latitude: 41.597869
Longitude: -75.985947

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 24172.0 8.0 0.0 0.0 0.0 0.0
2013-2 354468.0 123.0 0.0 0.0 0.0 0.0
2014-1 858908.0 177.0 0.0 0.0 0.0 0.0
2014-2 808697.0 169.0 0.0 0.0 0.0 0.0
2015-02 250.65 1.0 0.0 0.0 0.0 0.0
2015-01 144547.24 30.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILL CUTTINGS 403.0 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH
2012-1 DRILL CUTTINGS 1.0 Tons LANDFILL 301626 WHITE PINES LANDFILL MILLVILLE PA
2012-2 DRILL CUTTINGS 99.11 Tons LANDFILL 301626 WHITE PINES LANDFILL MILLVILLE PA
2013-1 PRODUCED FLUID 7.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-2 PRODUCED FLUID 3.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003 SHASKAS SOUTH PAD MONTROSE PA
2014-1 PRODUCED FLUID 57.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003 SHASKAS SOUTH PAD MONTROSE PA
2014-2 PRODUCED FLUID 212.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119 EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT WILLIAMSPORT PA
2014-2 PRODUCED FLUID 6.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010 HYDRO RECOVERY LP ANTRIM FACILITY WELLSBORO PA
2014-2 PRODUCED FLUID 6.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
2014-2 PRODUCED FLUID 194.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
15FEBU PRODUCED FLUID 0.02 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA
15-Jan PRODUCED FLUID 72.51 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
15FEBU PRODUCED FLUID 0.02 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1993133 2011-08-04 No Violations Noted
2002322 2011-08-04 No Violations Noted
2017943 2011-11-08 No Violations Noted Northeast Energy Rig 10 Comp. Man - Don Hackford

Continue to clean up mud on containment. Prob. cement 13 3/8" in AM Checked drillers log - at 468'. 20" @ 30' on 8/11/11 w/ 4.16 yds.

2036968 2012-01-25 Violation(s) Noted 630384 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith Release of material near mixing tank (mostly contained) and a release near the oil-based drilling mud tank (entirely off containment). Not notification received by the Department.
2036968 2012-01-25 Violation(s) Noted 630385 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Release of material near mixing tank (mostly contained) and another release near the oil-based mud tank (entirely off containment).
2073039 2012-06-04 No Violations Noted drilling ahead at 13,810
2148413 2013-03-14 Outstanding Violations - No Viols Req'd On site responding to wellhead failure that occured last night(3/13/13) at around 1800PM during 23rd stage of frac. Carrizo personel presented thier plan of action. Waited for all equipment to arrive at site. Began operations at 1100 AM. At 12:06 PM, recieved a phone call from Tom Weller, Carrizo, that well was shut in. Recieved confirmation at 13:20 PM that well was shut, from Jim Pritts, Carrizo VP. Went onto pad and talked to Tom Weller briefly. They will set 2 bridge plugs in well.


2148420 2013-03-13 Pending well control incident arrived 18:00 3/13/13,

boltd flange connection leaking below master valve. fluid escape partially under control Boots and Coots well control operational people arrived approx 05:00 14 th formulated plan to cap well

2148854 2013-03-14 No Violations Noted Everything still under control from incident. Engineers stating they plan on setting multiple bridge plugs as final stage. Currently do not plan on continuing fract. Goals are to set plugs; break down iron and get site secured for cleanup of fluids. Carrizo to advise us of depths and plugs to be set.
2148881 2013-03-14 Outstanding Violations - No Viols Req'd
2149675 2013-03-19 Outstanding Violations - No Viols Req'd Site is snow covered. Comp Man - Jim Pritts

Carrizo is investigating mouse holes. They believe there were 3 on site, and that 2 were cased and 1 was not - still excavating & checking. Work is ongoing. Saw some of the cleanup - pits, monitoring wells, etc.

2150281 2013-03-13 Violation(s) Noted 663421 78.73A - Operator shall prevent gas and other fluids from lower formations from entering fresh groundwater.
2150281 2013-03-13 Violation(s) Noted 663422 401 CSL - Discharge of pollultional material to waters of Commonwealth.
2150281 2013-03-13 Violation(s) Noted 663423 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
2150281 2013-03-13 Violation(s) Noted 663424 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances.
2154546 2013-04-04 Outstanding Violations - No Viols Req'd
2155713 2013-04-11 Outstanding Violations - No Viols Req'd Sample Results for water collected from Roadside Pit.
2155825 2013-04-12 Outstanding Violations - No Viols Req'd Received sample results for 3/14/2013 sampling.
2156512 2013-04-15 Outstanding Violations - No Viols Req'd Sample results of Taques Creek collected on 3/14/2013.
2157254 2013-04-16 Outstanding Violations - No Viols Req'd
2159845 2013-04-22 Outstanding Violations - No Viols Req'd Sample Results for nearby surface water collected on 3/15/2013.
2161150 2013-04-25 Outstanding Violations - No Viols Req'd Surface Water Analysis Results
2161809 2013-04-29 Outstanding Violations - No Viols Req'd
2167762 2013-05-21 Outstanding Violations - No Viols Req'd Received surface water sample results from collection on 4/17/2013.
2169585 2013-05-28 Outstanding Violations - No Viols Req'd Conducted an inspection of the additional containment measures that were implemented to control fluids. Fracking with other than freshwater had not commenced until the conclusion of this inspection. Additional measures implemented at the site appear to have the potential to thoroughly address any further incident should it occur. Some of the measures that were improved upon were the utilization of seperate manifolds and gauging for freshwater and produced water, backflow preventers and capability for lockout of produced water had been installed, and tertiary containment was implemented in areas where the greatest potential for release exists.

For data sources see[3]

References