X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20193"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-131-20193
 
| Well ID: 37-131-20193
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.597747, -75.985941 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.597747, -75.985942 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Wyoming County, Pennsylvania|Wyoming]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Wyoming_County,_Pennsylvania|Wyoming]]
 +
|-
 +
| Municipality: [[Washington Township,_Wyoming_County,_Pennsylvania|Washington Township]]
 
|-
 
|-
 
| Operator Name: [[CARRIZO (MARCELLUS) LLC]]
 
| Operator Name: [[CARRIZO (MARCELLUS) LLC]]
 
|-
 
|-
| Well Pad ID: [[145304|145304]]
+
| Well Pad ID: [[145304]]
 
|-
 
|-
 
| Farm/Lease Name: YARASAVAGE 4H
 
| Farm/Lease Name: YARASAVAGE 4H
 
|-
 
|-
| First Permit Date: 2011-07-13
+
| License Status: Active
|-
 
| Last Permit Date: 2011-07-13
 
|-
 
| Spud Date: 2011-08-05
 
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 08/05/2011
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 7/13/2011
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 2
+
| Configuration: Horizontal Well
 
|-
 
|-
 
| Latitude: 41.597747
 
| Latitude: 41.597747
 
|-
 
|-
| Longitude: -75.985941
+
| Longitude: -75.985942
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2011-2
+
| 2011
| style="text-align:right;" | 0.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2013
| style="text-align:right;" | 0.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 303,537.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 128
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 1,570,717.19
 +
| style="text-align: right;" | 309
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2015
| style="text-align:right;" | 0.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 174,628.86
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 52
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 467,127.56
 +
| style="text-align: right;" | 103
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2017
| style="text-align:right;" | 15227.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 5.0
+
| style="text-align: right;" | 924,415.07
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 261
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 795,602.16
 +
| style="text-align: right;" | 359
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 2019
| style="text-align:right;" | 288310.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 123.0
+
| style="text-align: right;" | 135,849.63
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2014-1
+
| 2011-S02
| style="text-align:right;" | 700803.0
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 142.0
+
| style="text-align: right;" | 160.92 Tons
| style="text-align:right;" | 0.0
+
| LANDFILL
| style="text-align:right;" | 0.0
+
| THR029
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2012-S01
 +
| Drill Cuttings (in Tons)
 +
| style="text-align: right;" | 898.00 Tons
 +
| LANDFILL
 +
| THR029
 
|-
 
|-
| 2014-2
+
| 2013-S01
| style="text-align:right;" | 869827.0
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 167.0
+
| style="text-align: right;" | 6,421.00 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2013-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 2,893.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 
|-
 
|-
| 2015-02
+
| 2014-S01
| style="text-align:right;" | 0.0
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 57.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123NE003
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 212.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR119
 
|-
 
|-
| 2015-01
+
| 2014-S02
| style="text-align:right;" | 5119.13
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 6,025.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 6,025.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC010
 
|-
 
|-
| 2015-03
+
| 2014-S02
| style="text-align:right;" | 6906.84
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 5.0
+
| style="text-align: right;" | 194.00 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|}
+
| 2015-M01
For data sources see<ref>{{cite web
+
| Produced Fluid (in Barrels)
| title = Oil and Gas Historical Production Report
+
| style="text-align: right;" | 1.32 Bbl
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| date = 2015-05-26
+
| WMGR123
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-2
+
| 2015-M03
| DRILL CUTTINGS
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 160.92
+
| style="text-align: right;" | 0.48 Bbl
| Tons
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| LANDFILL
+
| WMGR123NE003
| THR029
 
| TUNNELL HILL RECLAMATION LANDFILL
 
| NEWLEXINGTON
 
| OH
 
 
|-
 
|-
 +
| 2015-M03
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 2.89 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2012-1
+
| 2015-M05
| DRILL CUTTINGS
+
| Basic Sediment (in Barrels)
| style="text-align:right;" | 898.0
+
| style="text-align: right;" | 50.00 Bbl
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| THR029
 
| THR029
| TUNNELL HILL RECLAMATION LANDFILL
 
| NEWLEXINGTON
 
| OH
 
 
|-
 
|-
 +
| 2015-M11
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 11.26 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC018
 
|-
 
|-
| 2013-1
+
| 2015-M12
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 21.53 Bbl
| Bbl
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| REUSE OTHER THAN ROAD SPREADING
+
| WMGR123
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
|  
 
 
|-
 
|-
 +
| 2016-M04
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 9.29 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 
|-
 
|-
| 2013-2
+
| 2016-M05
| PRODUCED FLUID
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 9.29 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NE003
+
| WMGR123NC018
| SHASKAS SOUTH PAD
 
| MONTROSE
 
| PA
 
 
|-
 
|-
 +
| 2016-M06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 13.77 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 
|-
 
|-
| 2014-1
+
| 2016-M07
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 57.0
+
| style="text-align: right;" | 32.55 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE003
 
| WMGR123NE003
| SHASKAS SOUTH PAD
 
| MONTROSE
 
| PA
 
 
|-
 
|-
 +
| 2016-M08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.43 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 
|-
 
|-
| 2014-2
+
| 2016-M11
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 212.0
+
| style="text-align: right;" | 34.87 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR119
+
| WMGR123NC010
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
+
|-
| WILLIAMSPORT
+
| 2016-M11
| PA
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 17.17 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 
|-
 
|-
 +
| 2016-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 17.59 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 
|-
 
|-
| 2014-2
+
| 2017-M01
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 89.79 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
 
| WMGR123NC010
 
| WMGR123NC010
| HYDRO RECOVERY LP ANTRIM FACILITY
 
| WELLSBORO
 
| PA
 
 
|-
 
|-
 +
| 2017-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 34.62 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
| 2014-2
+
| 2017-M03
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 33.44 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| WMGR123NC018
| WMGR0123
+
|-
| HYDRO RECOVERY LP BLOSSBURG FACILITY
+
| 2017-M05
| BLOSSBURG
+
| Produced Fluid (in Barrels) RWC 802
| PA
+
| style="text-align: right;" | 34.55 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2017-M06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 49.15 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2017-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 20.61 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2017-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 20.14 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 +
|-
 +
| 2017-M08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 48.62 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 
|-
 
|-
 +
| 2017-M09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 12.34 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 
|-
 
|-
| 2014-2
+
| 2017-M12
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 194.0
+
| style="text-align: right;" | 48.94 Bbl
| Bbl
+
| REUSE (AT WELL PAD)
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
 
|  
 
|  
 +
|-
 +
| 2018-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 46.77 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.24 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 45.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2018-M08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 45.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 17.14 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 +
|-
 +
| 2019-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 45.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2019-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
| 15-Jan
+
| 2019-M03
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 0.77
+
| style="text-align: right;" | 30.00 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| WMGR123NC018
| WMGR0123
 
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1994088
 
| 1994088
| 2011-08-08
+
| Primary Facility
 +
| 08/08/2011
 +
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
 
| Pete Martin Drilling doing conductor - one hole a day, 3 are done, on the 4th of 6.
 
| Pete Martin Drilling doing conductor - one hole a day, 3 are done, on the 4th of 6.
Have permits.  No drillers logs, showed me the paperwork they have and said they would note on it the formations and water.
 
Still working on site and E&S.
 
No site ID sign.
 
Talked to Tom Weller on 8/9/2011 - problems will be taken care of.
 
| 617180
 
| 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling
 
|
 
|-
 
 
|-
 
|-
 
| 1997642
 
| 1997642
| 2011-08-22
+
| Primary Facility
 +
| 08/22/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Joe from JP Reilly,  on site constructing cellars
 
| Joe from JP Reilly,  on site constructing cellars
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2002325
 
| 2002325
| 2011-08-04
+
| Primary Facility
 +
| 08/04/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2036976
 
| 2036976
| 2012-01-25
+
| Primary Facility
 +
| 01/25/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2049616
 
| 2049616
| 2012-03-06
+
| Primary Facility
 +
| 03/06/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| NE Energy Rig 10,  Comp. Man - Bruce Despelder, checked drillers log - at 5117'
 
| NE Energy Rig 10,  Comp. Man - Bruce Despelder, checked drillers log - at 5117'
28"? at 30'  8/8/2011
 
13 3/8" @ 805' W/ 770 sx  10/30/2011
 
9 5/8" @ 1662' w/ 580 sx  11/1/2011
 
Just got back to drilling, down for a generator problem.  Started @ 1682', try to get to 700' before stopping.
 
BOP test 2/29/2012 - good.
 
Discussed need to correct permit number on site sign, and pump water out of containment in back corner - it has a sheen on it.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2067068
 
| 2067068
| 2012-05-07
+
| Primary Facility
 +
| 05/07/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Nabors M 61,  Comp. Man - John Savage,  checked drillers log - @ 8218'
 
| Nabors M 61,  Comp. Man - John Savage,  checked drillers log - @ 8218'
Tully top    6080' MD
+
|-
Hamilton  6230'
+
| 2155795
U. Marcellus 7996'  45 - 65 units  gas
+
| Primary Facility
Started 5/3/12 @ 6240'Top curve @ 7762'still on curve.
+
| 04/08/2013
BOP test 5/2/2012
+
| Follow-up Inspection
Discussed need to keep patching plastic, empty drip pans, general housekeeping.
+
| No Violations Noted
 +
| Rigged up wellheads to frac.  Started 1st stage @ 7 PM, Sat., 4/6/2013Very tight, worked till  23:30 PmM and shut down. Decision was made to use different wellhead. On Sun, 4/7/2013, set 2 BPs, @ 6000+' and 5000+'.
 +
|-
 +
| 2248496
 +
| Primary Facility
 +
| 05/10/2013
 +
| Follow-up Inspection
 +
| Violation(s) Noted
 
|  
 
|  
 +
|-
 +
| 2382843
 +
| Primary Facility
 +
| 06/24/2015
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2490763
 +
| Primary Facility
 +
| 2016-06-01
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
| 2545124
 +
| Primary Facility
 +
| 2016-12-15
 +
| Site Restoration
 +
| No Violations Noted
 +
|
 
|-
 
|-
| 2155795
+
| 2545125
| 2013-04-08
+
| Primary Facility
 +
| 2016-12-15
 +
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
| Rigged up wellheads to frac.  Started 1st stage @ 7 PM, Sat., 4/6/2013.  Very tight, worked till  23:30 PmM and shut down.  Decision was made to use different wellhead.  On Sun, 4/7/2013, set 2 BPs, @ 6000+' and 5000+'.
 
|
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
 
| 2248496
 
| 2248496
| 2013-05-10
+
| 689532
| Violation(s) Noted
+
| 05/10/2013
 
|  
 
|  
| 689532
+
| 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
| 78.86 - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
+
| Administrative
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 01:25, 18 July 2019

Well Details

Well ID: 37-131-20193
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Well Pad ID: 145304
Farm/Lease Name: YARASAVAGE 4H
License Status: Active
Spud Date: 08/05/2011
Permit Date: 7/13/2011
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.597747
Longitude: -75.985942

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 303,537.00 128 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 1,570,717.19 309 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 174,628.86 52 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 467,127.56 103 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 924,415.07 261 0.00 0 0.00 0
2018 CARRIZO (MARCELLUS) LLC 795,602.16 359 0.00 0 0.00 0
2019 CARRIZO (MARCELLUS) LLC 135,849.63 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-S02 Drill Cuttings (in Tons) 160.92 Tons LANDFILL THR029
2012-S01 Drill Cuttings (in Tons) 898.00 Tons LANDFILL THR029
2013-S01 Produced Fluid (in Barrels) 6,421.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 2,893.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014-S01 Produced Fluid (in Barrels) 57.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014-S02 Produced Fluid (in Barrels) 212.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014-S02 Produced Fluid (in Barrels) 6,025.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-S02 Produced Fluid (in Barrels) 6,025.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014-S02 Produced Fluid (in Barrels) 194.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M01 Produced Fluid (in Barrels) 1.32 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-M03 Produced Fluid (in Barrels) 0.48 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015-M03 Produced Fluid (in Barrels) 2.89 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M05 Basic Sediment (in Barrels) 50.00 Bbl LANDFILL THR029
2015-M11 Produced Fluid (in Barrels) 11.26 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015-M12 Produced Fluid (in Barrels) 21.53 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 9.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 9.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016-M06 Produced Fluid (in Barrels) RWC 802 13.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016-M07 Produced Fluid (in Barrels) RWC 802 32.55 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016-M08 Produced Fluid (in Barrels) RWC 802 15.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2016-M11 Produced Fluid (in Barrels) RWC 802 34.87 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016-M11 Produced Fluid (in Barrels) RWC 802 17.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016-M12 Produced Fluid (in Barrels) RWC 802 17.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M01 Produced Fluid (in Barrels) RWC 802 89.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M02 Produced Fluid (in Barrels) RWC 802 34.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M03 Produced Fluid (in Barrels) RWC 802 33.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M05 Produced Fluid (in Barrels) RWC 802 34.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M06 Produced Fluid (in Barrels) RWC 802 49.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M07 Produced Fluid (in Barrels) RWC 802 20.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M07 Produced Fluid (in Barrels) RWC 802 20.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017-M08 Produced Fluid (in Barrels) RWC 802 48.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017-M09 Produced Fluid (in Barrels) RWC 802 12.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017-M12 Produced Fluid (in Barrels) RWC 802 48.94 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 46.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M03 Produced Fluid (in Barrels) RWC 802 15.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M04 Produced Fluid (in Barrels) RWC 802 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M05 Produced Fluid (in Barrels) RWC 802 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M06 Produced Fluid (in Barrels) RWC 802 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 30.00 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M10 Produced Fluid (in Barrels) RWC 802 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M11 Produced Fluid (in Barrels) RWC 802 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M12 Produced Fluid (in Barrels) RWC 802 17.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019-M01 Produced Fluid (in Barrels) RWC 802 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M02 Produced Fluid (in Barrels) RWC 802 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M03 Produced Fluid (in Barrels) RWC 802 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1994088 Primary Facility 08/08/2011 Drilling/Alteration Violation(s) Noted Pete Martin Drilling doing conductor - one hole a day, 3 are done, on the 4th of 6.
1997642 Primary Facility 08/22/2011 Drilling/Alteration No Violations Noted Joe from JP Reilly, on site constructing cellars
2002325 Primary Facility 08/04/2011 Routine/Complete Inspection No Violations Noted
2036976 Primary Facility 01/25/2012 Routine/Complete Inspection No Violations Noted
2049616 Primary Facility 03/06/2012 Drilling/Alteration No Violations Noted NE Energy Rig 10, Comp. Man - Bruce Despelder, checked drillers log - at 5117'
2067068 Primary Facility 05/07/2012 Drilling/Alteration No Violations Noted Nabors M 61, Comp. Man - John Savage, checked drillers log - @ 8218'
2155795 Primary Facility 04/08/2013 Follow-up Inspection No Violations Noted Rigged up wellheads to frac. Started 1st stage @ 7 PM, Sat., 4/6/2013. Very tight, worked till 23:30 PmM and shut down. Decision was made to use different wellhead. On Sun, 4/7/2013, set 2 BPs, @ 6000+' and 5000+'.
2248496 Primary Facility 05/10/2013 Follow-up Inspection Violation(s) Noted
2382843 Primary Facility 06/24/2015 Routine/Partial Inspection No Violations Noted
2490763 Primary Facility 2016-06-01 Routine/Complete Inspection No Violations Noted
2545124 Primary Facility 2016-12-15 Site Restoration No Violations Noted
2545125 Primary Facility 2016-12-15 Site Restoration No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2248496 689532 05/10/2013 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative

For data sources see[6]

References