X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-027-21660"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-027-21660
 
| Well ID: 37-027-21660
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.020463, -78.056647 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.020464, -78.056647 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Centre County, Pennsylvania|Centre]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Snow Shoe Township, Centre County, Pennsylvania|Snow Shoe Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[WPX ENERGY APPALACHIA LLC]]
+
| County: [[Centre_County,_Pennsylvania|Centre]]
 
|-
 
|-
| Well Pad ID: [[149180|149180]]
+
| Municipality: [[Snow Shoe Township,_Centre_County,_Pennsylvania|Snow Shoe Township]]
 
|-
 
|-
| Farm/Lease Name: RESOURCE RECOVERY 3 1H
+
| Operator Name: [[XPR RESOURCES LLC]]
 
|-
 
|-
| First Permit Date: 2010-12-14
+
| Well Pad ID: [[149180]]
 
|-
 
|-
| Last Permit Date: 2010-12-14
+
| Farm/Lease Name: RESOURCE RECOVERY 3 1H
 
|-
 
|-
| Spud Date: 2011-02-14
+
| License Status: Active
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 02/14/2011
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 12/14/2010
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 10
+
| Configuration: Horizontal Well
 
|-
 
|-
| Latitude: 41.020463
+
| Latitude: 41.020464
 
|-
 
|-
 
| Longitude: -78.056647
 
| Longitude: -78.056647
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2011
| style="text-align:right;" | 309127.0
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 102.0
+
| style="text-align: right;" | 309,127.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 102
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 488,412.61
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2013
| style="text-align:right;" | 285678.0
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 180.0
+
| style="text-align: right;" | 290,932.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 219,463.93
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2015
| style="text-align:right;" | 202734.61
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 194,631.27
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 164,597.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2017
| style="text-align:right;" | 157563.82
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 138,002.16
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 364
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 136,092.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 2019
| style="text-align:right;" | 133368.18
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 27,221.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2014-1
 
| style="text-align:right;" | 113045.7
 
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-2
 
| style="text-align:right;" | 106418.23
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 15146.87
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 18044.78
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 17838.97
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 605.0
+
| style="text-align: right;" | 605.00 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100419
 
| 100419
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 
| MCCLELLANDTOWN
 
| PA
 
 
|-
 
|-
 +
| 2011-1
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 2,140.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 780.0
+
| style="text-align: right;" | 780.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,155.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2011-1
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 2.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 238.0
+
| style="text-align: right;" | 238.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 190.0
+
| style="text-align: right;" | 190.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 716.0
+
| style="text-align: right;" | 716.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 4.0
+
| style="text-align: right;" | 4,440.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2012-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 6,193.71 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 432.7
+
| style="text-align: right;" | 432.70 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
| 34-155-23795
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 6.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 3,212.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-151-23420
 
| 34-151-23420
| BELDEN & BLAKE WELL # 2
 
| HARTVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 505.0
+
| style="text-align: right;" | 505.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-151-23420
 
| 34-151-23420
| BELDEN & BLAKE WELL # 2
 
| HARTVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 210.0
+
| style="text-align: right;" | 210.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
| 34-155-23795
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2014-2
 
| 2014-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 3,300.00 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| WMGR123SW005
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
|
 
| PA
 
|-
 
 
|-
 
|-
 
| 2014-2
 
| 2014-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 110.0
+
| style="text-align: right;" | 110.00 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
| WMGR119
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
 
| WILLIAMSPORT
 
| PA
 
 
|-
 
|-
 +
| 2014-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,320.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2014-2
+
| 2015-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 302.00 Bbl
| Bbl
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 220.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| WMGR123SW005
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
+
|-
 +
| 2016-2
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 275.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 110.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2017-04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 110.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
|-
 +
| 2017-05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 55.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-06
 +
| Waste comment only
 +
| style="text-align: right;" |  Comment
 +
|
 +
|
 +
|-
 +
| 2017-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 179.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-08
 +
| Waste comment only
 +
| style="text-align: right;" |  Comment
 +
|
 +
|
 +
|-
 +
| 2017-11
 +
| Waste comment only
 +
| style="text-align: right;" |  Comment
 +
|
 
|  
 
|  
| PA
+
|-
 +
| 2017-12
 +
| Waste comment only
 +
| style="text-align: right;" |  Comment
 +
|
 +
|
 +
|-
 +
| 2018-02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 148.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018-11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 75.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1952536
 
| 1952536
| 2011-02-25
+
| Primary Facility
 +
| 02/25/2011
 +
| Compliance Evaluation
 
| Violation(s) Noted
 
| Violation(s) Noted
 
|  
 
|  
| 605447
 
| 307CSL - Discharge of industrial waste to waters of Commonwealth without a permit.
 
| Violation noted by John Sengle on 2/25/2011documented as corrected by Sam Jones inspection of 3/4/2011.
 
|-
 
 
|-
 
|-
 
| 1956546
 
| 1956546
| 2011-01-31
+
| Primary Facility
 +
| 01/31/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1962206
 
| 1962206
| 2011-02-15
+
| Primary Facility
 +
| 02/15/2011
 +
| Routine/Complete Inspection
 
| Viol(s) Noted &  Immediately Corrected
 
| Viol(s) Noted &  Immediately Corrected
 
|  
 
|  
| 607894
 
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| E&S mat is coming off ast various locations, HRI immediately repaired the E&S issues
 
|-
 
 
|-
 
|-
 
| 1963712
 
| 1963712
| 2011-02-28
+
| Primary Facility
 +
| 02/28/2011
 +
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1965713
 
| 1965713
| 2011-03-04
+
| Primary Facility
 +
| 03/04/2011
 +
| Routine/Complete Inspection
 
| Viol(s) Noted &  Immediately Corrected
 
| Viol(s) Noted &  Immediately Corrected
 
|  
 
|  
| 608892
 
| 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment.
 
| fluid level in pit exceeding 2' freeboard from excessive rain, pumper trucks on site removing fluids from the pit
 
|-
 
 
|-
 
|-
 
| 1980488
 
| 1980488
| 2011-04-18
+
| Primary Facility
 +
| 04/18/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1980623
 
| 1980623
| 2011-04-25
+
| Primary Facility
 +
| 04/25/2011
 +
| Routine/Complete Inspection
 
| Viol(s) Noted &  Immediately Corrected
 
| Viol(s) Noted &  Immediately Corrected
 
|  
 
|  
| 613529
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| Had pummper trucks on site and pumping fluid out
 
|-
 
 
|-
 
|-
 
| 1981779
 
| 1981779
| 2011-05-06
+
| Primary Facility
 +
| 05/06/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1986263
 
| 1986263
| 2011-05-12
+
| Primary Facility
 +
| 05/12/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 1988805
 
| 1988805
| 2011-06-02
+
| Primary Facility
 +
| 06/02/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2003958
 +
| Primary Facility
 +
| 07/29/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2005666
 +
| Primary Facility
 +
| 08/10/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2019243
 +
| Primary Facility
 +
| 09/06/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
|-
+
| 2021085
| 2003958
+
| Primary Facility
| 2011-07-29
+
| 09/15/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2023572
 +
| Primary Facility
 +
| 09/27/2011
 +
| Routine/Complete Inspection
 +
| Viol(s) Noted &  Immediately Corrected
 
|  
 
|  
 +
|-
 +
| 2024057
 +
| Primary Facility
 +
| 12/05/2011
 +
| Follow-up Inspection
 +
| Violation(s) Noted
 
|  
 
|  
 +
|-
 +
| 2024084
 +
| Primary Facility
 +
| 12/02/2011
 +
| Routine/Complete Inspection
 +
| Viol(s) Noted &  Immediately Corrected
 
|  
 
|  
 
|-
 
|-
 +
| 2024156
 +
| Primary Facility
 +
| 09/28/2011
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
|
 
|-
 
|-
| 2005666
+
| 2026337
| 2011-08-10
+
| Primary Facility
 +
| 10/25/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2029562
 +
| Primary Facility
 +
| 11/01/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2035158
 +
| Primary Facility
 +
| 12/02/2011
 +
| Routine/Complete Inspection
 +
| Viol(s) Noted &  Immediately Corrected
 
|  
 
|  
 +
|-
 +
| 2080709
 +
| Primary Facility
 +
| 05/21/2012
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
| 2145231
 +
| Primary Facility
 +
| 02/19/2013
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 
|-
 
|-
| 2019243
+
| 2180649
| 2011-09-06
+
| Primary Facility
 +
| 07/02/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2182884
 +
| Primary Facility
 +
| 07/11/2013
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2226779
 +
| Primary Facility
 +
| 12/03/2013
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2450446
 +
| Primary Facility
 +
| 2016-02-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
| 2647293
 +
| Primary Facility
 +
| 2017-10-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine inspection of XPR Resources LLC, Recovery Recovery Well Pad 3 on October 10, 2017.  No one was onsite during my inspection. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel leads to an existing pond. The contractor applied E&S blanket along the developed channel and seed has been applied. The ditch along the access road leading to the well pad has been cleaned out. All BMPs remain in place. The pad remains at full build-out size (350'x550').
 +
 +
There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. A trace of water was present within the produced fluids containment with a conductivity of 300 uS/cm.
 +
 +
No violations noted.
 +
|-
 +
| 2670061
 +
| Primary Facility
 +
| 2017-12-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The weather is 26 Deg. F and cloudy, windy at time of inspection.
 +
Routine inspection of XPR Resources LLC, Resource Recovery 3 Pad, Well # 1H on December 12, 2017.
 +
There are 4 producing wells on this pad: (Permits: 027-21660; 027-21661; 027-21662; 027-21663).
 +
Both annulus lines are open and plumbed to GPU at time of inspection. 0% combustible gas was detected at the annulus vent or in the area immediately surrounding the well. Digital gauge for the production tubing reads 145 PSI and located at Gas Processing Unit. No violations noted.
 +
XPR Resources LLC Representatives - Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator and Heather Empfield, Permitting & Geologist ¿ XPR Resources.
 +
DEP Representative ¿ Ulyana Trynovich, Oil and Gas Inspector.
 
|-
 
|-
| 2021085
+
| 2795359
| 2011-09-15
+
| Primary Facility
 +
| 2018-10-17
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|  
+
| Routine site inspection with Heather Empfield of XPR Resources LLC at Recovery Recovery Well Pad 3 on October 17, 2018. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel is fully vegetated and leads to an existing wet pond. The ditch along the access road leading to the well pad has been cleaned out. The pad remains at full build-out size (350'x550').
|  
+
 
|  
+
There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). Each well head is properly tagged. There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. As discussed during the site inspection with Ms. Empfield, the Department recommends submitting well site restoration reports for the 4 active wells onsite via Greenport.
|  
+
 
 +
No violations noted.
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 1952536
 +
| 605447
 +
| 02/25/2011
 +
| 03/04/2011
 +
| 307CSL - Discharge of industrial waste to waters of Commonwealth without a permit.
 +
| Environmental Health & Safety
 +
| Violation noted by John Sengle on 2/25/2011documented as corrected by Sam Jones inspection of 3/4/2011.
 +
|-
 +
| 1962206
 +
| 607894
 +
| 02/15/2011
 +
| 02/28/2011
 +
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 +
| Administrative
 +
| E&S mat is coming off ast various locations, HRI immediately repaired the E&S issues
 +
|-
 +
| 1965713
 +
| 608892
 +
| 03/04/2011
 +
| 03/04/2011
 +
| 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment.
 +
| Administrative
 +
| fluid level in pit exceeding 2' freeboard from excessive rain, pumper trucks on site removing fluids from the pit
 
|-
 
|-
 +
| 1980623
 +
| 613529
 +
| 04/25/2011
 +
| 04/25/2011
 +
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 +
| Administrative
 +
| Had pummper trucks on site and pumping fluid out
 
|-
 
|-
 
| 2023572
 
| 2023572
| 2011-09-27
 
| Viol(s) Noted &  Immediately Corrected
 
|
 
 
| 625965
 
| 625965
 +
| 09/27/2011
 +
| 09/28/2011
 
| 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected.
 
| 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected.
 +
| Administrative
 
| Failure to keep flow back and residue splash within the confines of the pit, need to clean up residue
 
| Failure to keep flow back and residue splash within the confines of the pit, need to clean up residue
|-
 
 
|-
 
|-
 
| 2024057
 
| 2024057
| 2011-12-05
 
| Violation(s) Noted
 
|
 
 
| 626131
 
| 626131
| 401CLS - Discharge of pollultional material to waters of Commonwealth.
+
| 12/05/2011
 +
| 02/01/2012
 +
| 401CSL - Discharge of pollultional material to waters of Commonwealth.
 +
| Environmental Health & Safety
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2024057
 
| 2024057
| 2011-12-05
 
| Violation(s) Noted
 
|
 
 
| 626132
 
| 626132
 +
| 12/05/2011
 +
| 02/01/2012
 
| 6018.301 - Residual Waste is mismanaged.
 
| 6018.301 - Residual Waste is mismanaged.
 +
| Environmental Health & Safety
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2024057
 
| 2024057
| 2011-12-05
 
| Violation(s) Noted
 
|
 
 
| 626133
 
| 626133
 +
| 12/05/2011
 +
| 02/01/2012
 
| 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected.
 
| 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected.
 +
| Administrative
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2024084
 
| 2024084
| 2011-12-02
 
| Viol(s) Noted &  Immediately Corrected
 
|
 
 
| 626164
 
| 626164
| 78.54 - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
+
| 12/02/2011
 +
| 12/05/2011
 +
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
 +
| Environmental Health & Safety
 
| Fluids and wastes from the area around the well head and cellar were allowed to make it to teh ground an dinto water in a pipeline trench
 
| Fluids and wastes from the area around the well head and cellar were allowed to make it to teh ground an dinto water in a pipeline trench
 
|-
 
|-
 +
| 2035158
 +
| 629644
 +
| 12/02/2011
 +
| 12/05/2011
 +
| 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances.
 +
| Administrative
 +
| Pit had insufficient capacity to keep all fluids and materials from teh flowing back of well into teh pit prior to removal to tanks or a centralized impoundment
 +
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2024156
+
| 605447
| 2011-09-28
+
| 268375
| No Violations Noted
+
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 03/04/2011
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 626131
 +
| 277897
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 11/12/2014
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 626132
 +
| 277897
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 11/12/2014
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 626133
 +
| 277897
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 11/12/2014
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 08/27/2011
 +
| 08/27/2011
 +
| style="text-align: right;" | 8530.00
 +
| style="text-align: right;" | 3,899,773.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="16"| 1
 +
| rowspan="3"| BE-9M
 +
| rowspan="3"| Halliburton Energy Services
 +
| rowspan="3"| Biocide
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00700000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2026337
 
| 2011-10-25
 
| No Violations Noted
 
|
 
|
 
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Tri-n-butyl tetradecyl phosphonium chloride
 +
| 81741-28-8
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00230000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2029562
+
|- valign="top"
| 2011-11-01
+
| rowspan="2"| WG-36 Gelling Agent
| No Violations Noted
+
| rowspan="2"| Halliburton Energy Services
|  
+
| rowspan="2"| Gel
|  
 
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Guar gum
 +
| 9000-30-0
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.00180000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2035158
+
|- valign="top"
| 2011-12-02
+
| rowspan="1"| FR-66 Friction Reducer
| Viol(s) Noted &  Immediately Corrected
+
| rowspan="1"| Halliburton Energy Services
|  
+
| rowspan="1"| Friction Reducer
| 629644
+
| Distillates, petroleum, hydrotreated light
| 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances.
+
| 64742-47-8
| Pit had insufficient capacity to keep all fluids and materials from teh flowing back of well into teh pit prior to removal to tanks or a centralized impoundment
+
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| SP Breaker
 +
| rowspan="1"| Halliburton Energy Services
 +
| rowspan="1"| Breaker
 +
| Sodium persulfate
 +
| 7775-27-1
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.00090000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2080709
+
|- valign="top"
| 2012-05-21
+
| rowspan="1"| Water
| No Violations Noted
+
| rowspan="1"| ARM Group
|  
+
| rowspan="1"| Carrier/Base Fluid
|  
+
| Water
|  
 
 
|  
 
|  
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 86.20
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Hydrochloric Acid
 +
| rowspan="1"| Halliburton Energy Services
 +
| rowspan="1"| Acid
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.09
 +
| style="text-align: right;" |
 
|-
 
|-
| 2145231
+
|- valign="top"
| 2013-02-19
+
| rowspan="1"|
| No Violations Noted
+
| rowspan="1"|
|  
+
| rowspan="1"|  
|  
 
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| LP-65
 +
| rowspan="1"| Halliburton Energy Services
 +
| rowspan="1"| Scale Inhibitor
 +
| Ammonium chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00330000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="3"| GBW-30 Breaker
 +
| rowspan="3"| Halliburton Energy Services
 +
| rowspan="3"| Breaker
 +
| Hemicellulase enzyme
 +
| 9012-54-8
 +
| style="text-align: right;" | 15.00
 +
| style="text-align: right;" | 0.00010000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2180649
+
| Carbohydrates
| 2013-07-02
 
| No Violations Noted
 
 
|  
 
|  
|  
+
| style="text-align: right;" | 95.00
|  
+
| style="text-align: right;" | 0.00080000
|  
+
| style="text-align: right;" |
|-
 
 
|-
 
|-
| 2182884
 
| 2013-07-11
 
| No Violations Noted
 
|
 
|
 
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| BA-40L
 +
| rowspan="1"| Halliburton Energy Services
 +
| rowspan="1"| Buffer
 +
| Carbonic acid, dipotassium salt
 +
| 584-08-7
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 
|-
 
|-
| 2226779
+
|- valign="top"
| 2013-12-03
+
| rowspan="1"| Sand- Silica Sand
| No Violations Noted
+
| rowspan="1"| Halliburton Energy Services
|  
+
| rowspan="1"| Proppant
|  
+
| Quartz
|  
+
| 14808-60-7
|  
+
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 13.64
 +
| style="text-align: right;" |  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 19:58, 14 July 2019

Well Details

Well ID: 37-027-21660
Loading map...
Country: United States
State: Pennsylvania
County: Centre
Municipality: Snow Shoe Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 149180
Farm/Lease Name: RESOURCE RECOVERY 3 1H
License Status: Active
Spud Date: 02/14/2011
Permit Date: 12/14/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.020464
Longitude: -78.056647

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 XPR RESOURCES LLC 309,127.00 102 0.00 0 0.00 0
2012 XPR RESOURCES LLC 488,412.61 364 0.00 0 0.00 0
2013 XPR RESOURCES LLC 290,932.00 365 0.00 0 0.00 0
2014 XPR RESOURCES LLC 219,463.93 365 0.00 0 0.00 0
2015 XPR RESOURCES LLC 194,631.27 365 0.00 0 0.00 0
2016 XPR RESOURCES LLC 164,597.00 366 0.00 0 0.00 0
2017 XPR RESOURCES LLC 138,002.16 364 0.00 0 0.00 0
2018 XPR RESOURCES LLC 136,092.00 365 0.00 0 0.00 0
2019 XPR RESOURCES LLC 27,221.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-1 Drill Cuttings (in Tons) 605.00 Tons LANDFILL 100419
2011-1 Drilling Fluid Waste (in Barrels) 2,140.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-1 Drilling Fluid Waste (in Barrels) 780.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011-1 Drilling Fluid Waste (in Barrels) 1,155.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-1 Fracing Fluid Waste (in Barrels) 238.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-1 Produced Fluid (in Barrels) 190.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-2 Fracing Fluid Waste (in Barrels) 716.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-1 Produced Fluid (in Barrels) 4,440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-2 Produced Fluid (in Barrels) 6,193.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-2 Produced Fluid (in Barrels) 432.70 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013-1 Produced Fluid (in Barrels) 3,212.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2013-2 Produced Fluid (in Barrels) 505.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2014-1 Produced Fluid (in Barrels) 210.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2014-2 Fracing Fluid Waste (in Barrels) 3,300.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014-2 Produced Fluid (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014-2 Produced Fluid (in Barrels) 1,320.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015-2 Produced Fluid (in Barrels) 302.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-1 Produced Fluid (in Barrels) RWC 802 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-2 Produced Fluid (in Barrels) RWC 802 275.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-03 Produced Fluid (in Barrels) RWC 802 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-04 Produced Fluid (in Barrels) RWC 802 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-05 Produced Fluid (in Barrels) RWC 802 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-06 Waste comment only Comment
2017-07 Produced Fluid (in Barrels) RWC 802 179.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-08 Waste comment only Comment
2017-11 Waste comment only Comment
2017-12 Waste comment only Comment
2018-02 Produced Fluid (in Barrels) RWC 802 148.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-11 Produced Fluid (in Barrels) RWC 802 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1952536 Primary Facility 02/25/2011 Compliance Evaluation Violation(s) Noted
1956546 Primary Facility 01/31/2011 Routine/Complete Inspection No Violations Noted
1962206 Primary Facility 02/15/2011 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
1963712 Primary Facility 02/28/2011 Compliance Evaluation Outstanding Violations - No Viols Req'd
1965713 Primary Facility 03/04/2011 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
1980488 Primary Facility 04/18/2011 Routine/Complete Inspection No Violations Noted
1980623 Primary Facility 04/25/2011 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
1981779 Primary Facility 05/06/2011 Routine/Complete Inspection No Violations Noted
1986263 Primary Facility 05/12/2011 Routine/Complete Inspection No Violations Noted
1988805 Primary Facility 06/02/2011 Routine/Complete Inspection No Violations Noted
2003958 Primary Facility 07/29/2011 Routine/Complete Inspection No Violations Noted
2005666 Primary Facility 08/10/2011 Routine/Complete Inspection No Violations Noted
2019243 Primary Facility 09/06/2011 Routine/Complete Inspection No Violations Noted
2021085 Primary Facility 09/15/2011 Routine/Complete Inspection No Violations Noted
2023572 Primary Facility 09/27/2011 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
2024057 Primary Facility 12/05/2011 Follow-up Inspection Violation(s) Noted
2024084 Primary Facility 12/02/2011 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
2024156 Primary Facility 09/28/2011 Follow-up Inspection No Violations Noted
2026337 Primary Facility 10/25/2011 Routine/Complete Inspection No Violations Noted
2029562 Primary Facility 11/01/2011 Routine/Complete Inspection No Violations Noted
2035158 Primary Facility 12/02/2011 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
2080709 Primary Facility 05/21/2012 Routine/Complete Inspection No Violations Noted
2145231 Primary Facility 02/19/2013 Routine/Complete Inspection No Violations Noted
2180649 Primary Facility 07/02/2013 Routine/Complete Inspection No Violations Noted
2182884 Primary Facility 07/11/2013 Routine/Complete Inspection No Violations Noted
2226779 Primary Facility 12/03/2013 Routine/Complete Inspection No Violations Noted
2450446 Primary Facility 2016-02-11 Routine/Complete Inspection No Violations Noted
2647293 Primary Facility 2017-10-06 Routine/Complete Inspection No Violations Noted Routine inspection of XPR Resources LLC, Recovery Recovery Well Pad 3 on October 10, 2017. No one was onsite during my inspection. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel leads to an existing pond. The contractor applied E&S blanket along the developed channel and seed has been applied. The ditch along the access road leading to the well pad has been cleaned out. All BMPs remain in place. The pad remains at full build-out size (350'x550').

There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. A trace of water was present within the produced fluids containment with a conductivity of 300 uS/cm.

No violations noted.

2670061 Primary Facility 2017-12-12 Routine/Complete Inspection No Violations Noted The weather is 26 Deg. F and cloudy, windy at time of inspection.

Routine inspection of XPR Resources LLC, Resource Recovery 3 Pad, Well # 1H on December 12, 2017. There are 4 producing wells on this pad: (Permits: 027-21660; 027-21661; 027-21662; 027-21663). Both annulus lines are open and plumbed to GPU at time of inspection. 0% combustible gas was detected at the annulus vent or in the area immediately surrounding the well. Digital gauge for the production tubing reads 145 PSI and located at Gas Processing Unit. No violations noted. XPR Resources LLC Representatives - Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator and Heather Empfield, Permitting & Geologist ¿ XPR Resources. DEP Representative ¿ Ulyana Trynovich, Oil and Gas Inspector.

2795359 Primary Facility 2018-10-17 Routine/Complete Inspection No Violations Noted Routine site inspection with Heather Empfield of XPR Resources LLC at Recovery Recovery Well Pad 3 on October 17, 2018. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel is fully vegetated and leads to an existing wet pond. The ditch along the access road leading to the well pad has been cleaned out. The pad remains at full build-out size (350'x550').

There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). Each well head is properly tagged. There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. As discussed during the site inspection with Ms. Empfield, the Department recommends submitting well site restoration reports for the 4 active wells onsite via Greenport.

No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1952536 605447 02/25/2011 03/04/2011 307CSL - Discharge of industrial waste to waters of Commonwealth without a permit. Environmental Health & Safety Violation noted by John Sengle on 2/25/2011documented as corrected by Sam Jones inspection of 3/4/2011.
1962206 607894 02/15/2011 02/28/2011 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. Administrative E&S mat is coming off ast various locations, HRI immediately repaired the E&S issues
1965713 608892 03/04/2011 03/04/2011 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. Administrative fluid level in pit exceeding 2' freeboard from excessive rain, pumper trucks on site removing fluids from the pit
1980623 613529 04/25/2011 04/25/2011 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative Had pummper trucks on site and pumping fluid out
2023572 625965 09/27/2011 09/28/2011 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. Administrative Failure to keep flow back and residue splash within the confines of the pit, need to clean up residue
2024057 626131 12/05/2011 02/01/2012 401CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety
2024057 626132 12/05/2011 02/01/2012 6018.301 - Residual Waste is mismanaged. Environmental Health & Safety
2024057 626133 12/05/2011 02/01/2012 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. Administrative
2024084 626164 12/02/2011 12/05/2011 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety Fluids and wastes from the area around the well head and cellar were allowed to make it to teh ground an dinto water in a pipeline trench
2035158 629644 12/02/2011 12/05/2011 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. Administrative Pit had insufficient capacity to keep all fluids and materials from teh flowing back of well into teh pit prior to removal to tanks or a centralized impoundment

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
605447 268375 NOV - Notice of Violation Comply/Closed 03/04/2011
626131 277897 NOV - Notice of Violation Comply/Closed 11/12/2014
626132 277897 NOV - Notice of Violation Comply/Closed 11/12/2014
626133 277897 NOV - Notice of Violation Comply/Closed 11/12/2014

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/27/2011 08/27/2011 8530.00 3,899,773.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BE-9M Halliburton Energy Services Biocide Methanol 67-56-1 30.00 0.00700000
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00230000
WG-36 Gelling Agent Halliburton Energy Services Gel
Guar gum 9000-30-0 100.00 0.00180000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00090000
Water ARM Group Carrier/Base Fluid Water 100.00 86.20
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.09
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00330000
GBW-30 Breaker Halliburton Energy Services Breaker Hemicellulase enzyme 9012-54-8 15.00 0.00010000
Carbohydrates 95.00 0.00080000
BA-40L Halliburton Energy Services Buffer Carbonic acid, dipotassium salt 584-08-7 60.00 0.01
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 13.64

For data sources see[7]

References