If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-23096 | | Well ID: 34-153-23096 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.948217286, -81.63678927 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: | + | | State: Ohio |
+ | |- | ||
+ | | County: [[Summit_County,_Ohio|Summit]] | ||
+ | |- | ||
+ | | Municipality: [[New_Franklin,_Ohio|New Franklin]] | ||
|- | |- | ||
| Operator Name: [[DOMINION EAST OHIO]] | | Operator Name: [[DOMINION EAST OHIO]] | ||
Line 13: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: COLLOCA UNIT |
|- | |- | ||
− | | | + | | License Status: Storage Well |
|- | |- | ||
− | | | + | | License Date: 2010-02-03 |
|- | |- | ||
| Spud Date: 2009-09-14 | | Spud Date: 2009-09-14 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[WHIPSTOCK OHIO DRILLING]] |
+ | |- | ||
+ | | Final Drill Date: 2009-09-28 | ||
+ | |- | ||
+ | | Well Total Depth: 4105 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Well Status: | + | | Latitude: 40.948217286 |
+ | |- | ||
+ | | Longitude: -81.63678927 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
|- | |- | ||
− | | | + | | APP |
+ | | 2009-09-03 | ||
+ | | Proposed Formations:CLINTON, Issued Date:9/3/2009, Expired Date:9/3/2010 6:00:00 AM, Drilling unit acres:60, Proposed Well Type:OG, Proposed Well Class:POOL | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
+ | | 2009-09-28 | ||
+ | | | ||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 2009-11-17 | ||
+ | | | ||
+ | |- | ||
+ | | Change of Owner | ||
+ | | 2010-04-30 | ||
+ | | Operator changed from 8321, DOMINION EXPL& PROD INC to 8632, DOMINION FIELD SERVICES INC | ||
+ | |- | ||
+ | | Change of Owner | ||
+ | | 2014-02-20 | ||
+ | | Operator changed from 8632, DOMINION FIELD SERVICES INC to 240, DOMINION EAST OHIO | ||
+ | |- | ||
+ | | APP | ||
+ | | 2014-03-03 | ||
+ | | Proposed Formations:CLINTON, Issued Date:3/3/2014, Expired Date:3/2/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class: | ||
+ | |- | ||
+ | | APP | ||
+ | | 2014-03-04 | ||
+ | | Proposed Formations:CLINTON, Issued Date:3/4/2014, Expired Date:3/3/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class: | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2015-03-04 | ||
+ | | | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-15 | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | | 2010-02-03 |
+ | | style="text-align: right;" | 3897 | ||
+ | | style="text-align: right;" | 3964 | ||
+ | | style="text-align: right;" | 22 | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | == Stimulations Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Stimulation Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Fluid Volume |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Company |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Comments |
|- | |- | ||
− | |||
− | |||
| | | | ||
+ | | H2O | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 1752 Bbl | ||
+ | | style="text-align: right;" | 61135 | ||
| | | | ||
− | | | + | | 574,341 SCF NITROGEN ASSIST |
− | | style="text-align:right;" | 440 | + | |- |
− | | | + | |} |
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblStimulation Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2009 | ||
+ | | [[DOMINION EXPL& PROD INC]] | ||
+ | | style="text-align: right;" | 1019 | ||
+ | | style="text-align: right;" | 440 | ||
+ | | style="text-align: right;" | 59 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[DOMINION FIELD SERVICES INC]] | ||
+ | | style="text-align: right;" | 8443 | ||
+ | | style="text-align: right;" | 1461 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[DOMINION EAST OHIO]] | ||
+ | | style="text-align: right;" | 13241 | ||
+ | | style="text-align: right;" | 818 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
+ | | 2012 | ||
+ | | [[DOMINION FIELD SERVICES INC]] | ||
+ | | style="text-align: right;" | 9717 | ||
+ | | style="text-align: right;" | 628 | ||
+ | | style="text-align: right;" | 366 | ||
|- | |- | ||
− | | | + | | 2013 |
− | | style="text-align:right;" | | + | | [[DOMINION FIELD SERVICES INC]] |
− | | | + | | style="text-align: right;" | 6869 |
− | + | | style="text-align: right;" | 544 | |
− | | | + | | style="text-align: right;" | 355 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
|- | |- | ||
− | | | + | | 2009 |
− | | style="text-align:right;" | | + | | [[DOMINION EXPL& PROD INC]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 51 | |
− | + | | style="text-align: right;" | 59 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2010 | ||
+ | | [[DOMINION FIELD SERVICES INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 371 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2011 |
− | | style="text-align:right;" | | + | | [[DOMINION EAST OHIO]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2012 | ||
+ | | [[DOMINION FIELD SERVICES INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 201 | ||
+ | | style="text-align: right;" | 366 | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
− | | style="text-align:right;" | | + | | [[DOMINION FIELD SERVICES INC]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 310 | |
− | + | | style="text-align: right;" | 355 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Ohio Department of Natural Resources | + | | title = Risk Based Data Management System - Production Table - Brine Data |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | + | |- |
− | + | | 0039802026 | |
+ | | 2009-09-22 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Whipstock continued to drill the Salina without establishing circulation. TD of 3356 was reached and Whipstock laid down the drillstring in order to run the 7 casing. | ||
+ | |- | ||
+ | | 0570623632 | ||
+ | | 2009-10-01 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Whipstock Drilling has moved off the location and the drilling pits are being pumped down. The pits are fenced, lined and in good condition. | ||
+ | |- | ||
+ | | 0671429852 | ||
+ | | 2018-02-15 | ||
+ | | Storage Well | ||
+ | | No Violations | ||
+ | | I did a status check inspection for this storage well. The well is equipped with a plunger-lift system. The diked tank battery consists of two steel tanks, a plastic brine tank, a horizontal separator, a vertical separator and a meter. The well and tank battery are fenced in with locked gates. The well is legibly identified. No compliance issues are cited at this time. | ||
+ | |- | ||
+ | | 0784993064 | ||
+ | | 2009-09-17 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Whipstock first encountered water at 2657 in the Oriskany. The water volume was contolled with the addition of soap. Additional water was reported at 2892 which forced Whipstock to convert from air to fluid drilling. | ||
+ | |- | ||
+ | | 0796735971 | ||
+ | | 2009-10-07 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Daily Excavating and ChemTech are on site to solidify the drilling pits. | ||
|- | |- | ||
| 1093192274 | | 1093192274 | ||
| 2009-09-11 | | 2009-09-11 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| The drilling location and the lease road have been built. The rig is scheduled to move on location on 9/14. | | The drilling location and the lease road have been built. The rig is scheduled to move on location on 9/14. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1187439220 |
− | |||
| 2009-09-09 | | 2009-09-09 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| Daily Excavating was on site to start building the lease road and the location. No violations at this time. | | Daily Excavating was on site to start building the lease road and the location. No violations at this time. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1254183271 | | 1254183271 | ||
| 2009-09-18 | | 2009-09-18 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Whipstock Drilling encountered the top of the Big Lime at 2392 | + | | No Violations |
− | + | | Whipstock Drilling encountered the top of the Big Lime at 2392 while drilling with air. At a depth of 2657 they had a show of water from the Oriskany which caused them to start soaping. At 2892 the water volume forced a conversion to fluid drilling before brine started flowing to surface. The weight of the brine was measured at 9.2 ppg. Whipstock mixed a pill of gel and cottonseed hulls in an attempt to control brine flow and loss. The pill was unsuccessful and Dominion decided to pump a cement plug to shut off the zone. Petroset mixed and pumped a 300 sack plug of Class A cement without circulating during the job. The plug was down at 06:15 am on 9/18. Whipstock waited 24 hours before going back to drilling. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1293778904 | | 1293778904 | ||
| 2014-12-26 | | 2014-12-26 | ||
− | | | + | | UrbanProduction Wells |
+ | | No Violations | ||
| I was on location to conduct a status check of this well. The well is of plunger lift construction. The tank battery consists of two 140 BBL production tanks, a mechanical separator and a 1500 gallon poly brine tank. The valves at the wellhead were open. The low pressure relief valve, spark arrestor and charcoal filter were installed on one of the 140 BBL production tanks. The tank battery was diked. The fencing around the wellhead and tank battery is an 8 foot high chain link fence and topped with three strands of barbed wire. The man doors to the tank battery and well were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found. | | I was on location to conduct a status check of this well. The well is of plunger lift construction. The tank battery consists of two 140 BBL production tanks, a mechanical separator and a 1500 gallon poly brine tank. The valves at the wellhead were open. The low pressure relief valve, spark arrestor and charcoal filter were installed on one of the 140 BBL production tanks. The tank battery was diked. The fencing around the wellhead and tank battery is an 8 foot high chain link fence and topped with three strands of barbed wire. The man doors to the tank battery and well were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1422512417 | ||
+ | | 2017-01-26 | ||
+ | | Storage Well | ||
+ | | No Violations | ||
+ | | At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were closed and locked. The well was fenced and locked. The tank battery still contained production equipment and consisted of two 100 BBL production tanks, one 50 BBL poly brine tank, and a mechanical separator. The valves on the separator were closed. The tank battery was diked and fenced with a locked man door. The fence had been damaged by a downed tree on the northwest side and the tree debris has been removed but fence still needs repaired. The proper, legible signage was located at the tank battery. Lease access was stable. I contacted Dominion East Ohio about repairing the fence around the tank battery. | ||
|- | |- | ||
− | | | + | | 1475456531 |
| 2009-09-21 | | 2009-09-21 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | After waiting on the second cement plug, Whipstock ran the 7-7/8 drillstring back in the hole and tagged the cement at 1953 | + | | No Violations |
− | + | | After waiting on the second cement plug, Whipstock ran the 7-7/8 drillstring back in the hole and tagged the cement at 1953. For the next 24 hours, Whipstock drilled cement back to a depth of 2892. Whipstock continued drilling the Salina to a depth of 2975 where circulation was lost again. Dominion decided to continue drilling without circulation through the salt intervals before setting an intermediate string of 7 casing. Fluid loss to this point totaled nearly 4000 bbl. | |
− | |||
− | |||
|- | |- | ||
− | | | + | | 1491836148 |
− | |||
| 2009-09-14 | | 2009-09-14 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| Whipstock Drilling has spudded the well and is drilling conductor hole. Surface casing should be ready to cement in the morning. The working pit has been dug and lined. The blow pit will be dug in the morning. | | Whipstock Drilling has spudded the well and is drilling conductor hole. Surface casing should be ready to cement in the morning. The working pit has been dug and lined. The blow pit will be dug in the morning. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1656125621 | | 1656125621 | ||
| 2010-06-23 | | 2010-06-23 | ||
− | | | + | | Preliminary Restoration |
+ | | No Violations | ||
| Preliminary restoration is approved. | | Preliminary restoration is approved. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1672153618 | | 1672153618 | ||
| 2009-09-28 | | 2009-09-28 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| Whipstock Drilling has reached TD and is starting to lay down drill pipe. The intermediate casing job has apparently been successful in containing the water flow from the Salina Group. | | Whipstock Drilling has reached TD and is starting to lay down drill pipe. The intermediate casing job has apparently been successful in containing the water flow from the Salina Group. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1767022051 | | 1767022051 | ||
| 2009-09-23 | | 2009-09-23 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | After waiting 12 hours for the 7 cement, Appalachian Well Surveys ran a cement bond log. The logging tool set down at 3233 | + | | No Violations |
− | + | | After waiting 12 hours for the 7 cement, Appalachian Well Surveys ran a cement bond log. The logging tool set down at 3233 and found the top of cement on the backside of the 7 casing at 2998. This placed the top of the cement near the base of the loss circulation zone. In order to place cement above this zone, Appalachian perforated the 7 with 8 shots from 2530 to 2532. Petroset mixed and displaced 150 sacks of Class A cement with 3% calcium chloride. The plug was down at 12:50 am on 9/24 and the well was shut in for 8 hours. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1776146716 | | 1776146716 | ||
| 2009-09-19 | | 2009-09-19 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| After waiting on cement spotted on 9/18, Whipstock ran the 7-7/8 drillstring back into the hole. They did not encounter any of the cement but there was a diminution in the flow volume. Dominion decided to place a second cement plug across the same interval. On 9/19, Petroset pumped another 300 sack plug of Class A cement this time with 2% calcium chloride added. Circulation was maintained throughout the cement mixing and displacement. The plug down was at 14:40 on 9/19. | | After waiting on cement spotted on 9/18, Whipstock ran the 7-7/8 drillstring back into the hole. They did not encounter any of the cement but there was a diminution in the flow volume. Dominion decided to place a second cement plug across the same interval. On 9/19, Petroset pumped another 300 sack plug of Class A cement this time with 2% calcium chloride added. Circulation was maintained throughout the cement mixing and displacement. The plug down was at 14:40 on 9/19. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2065177295 | ||
+ | | 2019-01-16 | ||
+ | | Storage Well | ||
+ | | No Violations | ||
+ | | My inspection found the well is equipped with a plunger-lift system. The diked tank battery consists of two steel tanks, a plastic brine tank, a meter run, a vertical and horizontal separator. The well is legibly identified. No compliance issues are cited at this time. | ||
|- | |- | ||
| 2079933940 | | 2079933940 | ||
| 2009-11-24 | | 2009-11-24 | ||
− | | | + | | Production Wells |
+ | | No Violations | ||
| The well is in production and the required fences and identification are posted. The affected areas have been graded, seeded and mulched. Preliminary restoration will be approved as soon as the vegetation has established. | | The well is in production and the required fences and identification are posted. The affected areas have been graded, seeded and mulched. Preliminary restoration will be approved as soon as the vegetation has established. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
|- | |- | ||
− | | | + | |}--> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-153-23096 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.948217286,"lon":-81.63678927,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: New Franklin | |
Operator Name: DOMINION EAST OHIO | |
Well Pad ID: | |
Farm/Lease Name: COLLOCA UNIT | |
License Status: Storage Well | |
License Date: 2010-02-03 | |
Spud Date: 2009-09-14 | |
Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING | |
Final Drill Date: 2009-09-28 | |
Well Total Depth: 4105 ft | |
Configuration: Vertical | |
Latitude: 40.948217286 | |
Longitude: -81.63678927 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-09-03 | Proposed Formations:CLINTON, Issued Date:9/3/2009, Expired Date:9/3/2010 6:00:00 AM, Drilling unit acres:60, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-09-28 | |
Completion Report Received | 2009-11-17 | |
Change of Owner | 2010-04-30 | Operator changed from 8321, DOMINION EXPL& PROD INC to 8632, DOMINION FIELD SERVICES INC |
Change of Owner | 2014-02-20 | Operator changed from 8632, DOMINION FIELD SERVICES INC to 240, DOMINION EAST OHIO |
APP | 2014-03-03 | Proposed Formations:CLINTON, Issued Date:3/3/2014, Expired Date:3/2/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class: |
APP | 2014-03-04 | Proposed Formations:CLINTON, Issued Date:3/4/2014, Expired Date:3/3/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class: |
Construction Permit Expires | 2015-03-04 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-02-03 | 3897 | 3964 | 22 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 1752 Bbl | 61135 | 574,341 SCF NITROGEN ASSIST |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | DOMINION EXPL& PROD INC | 1019 | 440 | 59 |
2010 | DOMINION FIELD SERVICES INC | 8443 | 1461 | 365 |
2011 | DOMINION EAST OHIO | 13241 | 818 | 365 |
2012 | DOMINION FIELD SERVICES INC | 9717 | 628 | 366 |
2013 | DOMINION FIELD SERVICES INC | 6869 | 544 | 355 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | DOMINION EXPL& PROD INC | Brine | 51 | 59 |
2010 | DOMINION FIELD SERVICES INC | Brine | 371 | 365 |
2011 | DOMINION EAST OHIO | Brine | 0 | 365 |
2012 | DOMINION FIELD SERVICES INC | Brine | 201 | 366 |
2013 | DOMINION FIELD SERVICES INC | Brine | 310 | 355 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0039802026 | 2009-09-22 | Drill / Deepen / Reopen | No Violations | Whipstock continued to drill the Salina without establishing circulation. TD of 3356 was reached and Whipstock laid down the drillstring in order to run the 7 casing. |
0570623632 | 2009-10-01 | Drill / Deepen / Reopen | No Violations | Whipstock Drilling has moved off the location and the drilling pits are being pumped down. The pits are fenced, lined and in good condition. |
0671429852 | 2018-02-15 | Storage Well | No Violations | I did a status check inspection for this storage well. The well is equipped with a plunger-lift system. The diked tank battery consists of two steel tanks, a plastic brine tank, a horizontal separator, a vertical separator and a meter. The well and tank battery are fenced in with locked gates. The well is legibly identified. No compliance issues are cited at this time. |
0784993064 | 2009-09-17 | Drill / Deepen / Reopen | No Violations | Whipstock first encountered water at 2657 in the Oriskany. The water volume was contolled with the addition of soap. Additional water was reported at 2892 which forced Whipstock to convert from air to fluid drilling. |
0796735971 | 2009-10-07 | Drill / Deepen / Reopen | No Violations | Daily Excavating and ChemTech are on site to solidify the drilling pits. |
1093192274 | 2009-09-11 | Drill / Deepen / Reopen | No Violations | The drilling location and the lease road have been built. The rig is scheduled to move on location on 9/14. |
1187439220 | 2009-09-09 | Drill / Deepen / Reopen | No Violations | Daily Excavating was on site to start building the lease road and the location. No violations at this time. |
1254183271 | 2009-09-18 | Drill / Deepen / Reopen | No Violations | Whipstock Drilling encountered the top of the Big Lime at 2392 while drilling with air. At a depth of 2657 they had a show of water from the Oriskany which caused them to start soaping. At 2892 the water volume forced a conversion to fluid drilling before brine started flowing to surface. The weight of the brine was measured at 9.2 ppg. Whipstock mixed a pill of gel and cottonseed hulls in an attempt to control brine flow and loss. The pill was unsuccessful and Dominion decided to pump a cement plug to shut off the zone. Petroset mixed and pumped a 300 sack plug of Class A cement without circulating during the job. The plug was down at 06:15 am on 9/18. Whipstock waited 24 hours before going back to drilling. |
1293778904 | 2014-12-26 | UrbanProduction Wells | No Violations | I was on location to conduct a status check of this well. The well is of plunger lift construction. The tank battery consists of two 140 BBL production tanks, a mechanical separator and a 1500 gallon poly brine tank. The valves at the wellhead were open. The low pressure relief valve, spark arrestor and charcoal filter were installed on one of the 140 BBL production tanks. The tank battery was diked. The fencing around the wellhead and tank battery is an 8 foot high chain link fence and topped with three strands of barbed wire. The man doors to the tank battery and well were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found. |
1422512417 | 2017-01-26 | Storage Well | No Violations | At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were closed and locked. The well was fenced and locked. The tank battery still contained production equipment and consisted of two 100 BBL production tanks, one 50 BBL poly brine tank, and a mechanical separator. The valves on the separator were closed. The tank battery was diked and fenced with a locked man door. The fence had been damaged by a downed tree on the northwest side and the tree debris has been removed but fence still needs repaired. The proper, legible signage was located at the tank battery. Lease access was stable. I contacted Dominion East Ohio about repairing the fence around the tank battery. |
1475456531 | 2009-09-21 | Drill / Deepen / Reopen | No Violations | After waiting on the second cement plug, Whipstock ran the 7-7/8 drillstring back in the hole and tagged the cement at 1953. For the next 24 hours, Whipstock drilled cement back to a depth of 2892. Whipstock continued drilling the Salina to a depth of 2975 where circulation was lost again. Dominion decided to continue drilling without circulation through the salt intervals before setting an intermediate string of 7 casing. Fluid loss to this point totaled nearly 4000 bbl. |
1491836148 | 2009-09-14 | Drill / Deepen / Reopen | No Violations | Whipstock Drilling has spudded the well and is drilling conductor hole. Surface casing should be ready to cement in the morning. The working pit has been dug and lined. The blow pit will be dug in the morning. |
1656125621 | 2010-06-23 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1672153618 | 2009-09-28 | Drill / Deepen / Reopen | No Violations | Whipstock Drilling has reached TD and is starting to lay down drill pipe. The intermediate casing job has apparently been successful in containing the water flow from the Salina Group. |
1767022051 | 2009-09-23 | Drill / Deepen / Reopen | No Violations | After waiting 12 hours for the 7 cement, Appalachian Well Surveys ran a cement bond log. The logging tool set down at 3233 and found the top of cement on the backside of the 7 casing at 2998. This placed the top of the cement near the base of the loss circulation zone. In order to place cement above this zone, Appalachian perforated the 7 with 8 shots from 2530 to 2532. Petroset mixed and displaced 150 sacks of Class A cement with 3% calcium chloride. The plug was down at 12:50 am on 9/24 and the well was shut in for 8 hours. |
1776146716 | 2009-09-19 | Drill / Deepen / Reopen | No Violations | After waiting on cement spotted on 9/18, Whipstock ran the 7-7/8 drillstring back into the hole. They did not encounter any of the cement but there was a diminution in the flow volume. Dominion decided to place a second cement plug across the same interval. On 9/19, Petroset pumped another 300 sack plug of Class A cement this time with 2% calcium chloride added. Circulation was maintained throughout the cement mixing and displacement. The plug down was at 14:40 on 9/19. |
2065177295 | 2019-01-16 | Storage Well | No Violations | My inspection found the well is equipped with a plunger-lift system. The diked tank battery consists of two steel tanks, a plastic brine tank, a meter run, a vertical and horizontal separator. The well is legibly identified. No compliance issues are cited at this time. |
2079933940 | 2009-11-24 | Production Wells | No Violations | The well is in production and the required fences and identification are posted. The affected areas have been graded, seeded and mulched. Preliminary restoration will be approved as soon as the vegetation has established. |
For data sources see[9]