X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23168"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23168
 
| Well ID: 34-153-23168
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.01807426, -81.56015352 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.018018745, -81.56031205 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Summit County, Ohio|Summit]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Summit_County,_Ohio|Summit]]
 +
|-
 +
| Municipality: [[Coventry_Township,_Summit_County,_Ohio|Coventry Township]]
 
|-
 
|-
 
| Operator Name: [[CARGILL INC]]
 
| Operator Name: [[CARGILL INC]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: CITY OF AKRON (SMP #4)
 
|-
 
|-
| First Permit Date:  
+
| License Status: Active Injection
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2013-12-07
 
|-
 
|-
 
| Spud Date: 2013-12-07
 
| Spud Date: 2013-12-07
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[DALLAS MORRIS]]
 +
|-
 +
| Final Drill Date: 2013-12-29
 +
|-
 +
| Well Total Depth: 3158 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Well Drilled
+
| Latitude: 41.018018745
 
|-
 
|-
| Violations: 0
+
| Longitude: -81.56031205
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
| Latitude: 41.01807426
+
| APP
 +
| 2013-08-20
 +
| Proposed Formations:SALINA, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
 
|-
 
|-
| Longitude: -81.56015352
+
| Reached Total Depth
 +
| 2013-12-29
 +
|
 +
|-
 +
| Completion Report Received
 +
| 2014-05-05
 +
|
 +
|-
 +
| Construction Permit Expires
 +
| 2014-08-20
 +
|
 +
|-
 +
| Last Compliance Report
 +
| 2016-05-16
 +
|
 +
|-
 +
| Record Last Modified
 +
| 2017-02-10
 +
|
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
| 126031980
+
| 0126031980
 
| 2013-12-08
 
| 2013-12-08
|  
+
| Solution Mining Project
 +
| No Violations
 
| Dallas Morris Rig # 15 spudded City of Akron Well # 78 @ 0500 hrs. I did not observe any violations at this time.
 
| Dallas Morris Rig # 15 spudded City of Akron Well # 78 @ 0500 hrs. I did not observe any violations at this time.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0183468973
 +
| 2016-08-16
 +
| Solution Mining Project
 +
| No Violations
 +
| There were no violations at the time of inspection.
 +
|-
 +
| 0419189501
 +
| 2013-12-08
 +
| Casing String Witnessed
 +
| No Violations
 +
| I was on location to witness the cementing of the Conductor casing. Dallas Morris Rig #15 drove 24 casing to 7. The Rig drilled 20 hole to 120 and ran 16 casing to 102. Universal Well Services moved in and cemented the 16 casing with 140 sacks of Type 1, 3 %  CaCl2 and displaced to 82 with 18.5 Bbls. fresh water. I observed approximately 11 Bbls of cement returns to the half round. Displacement pressure was 178 psi. Water temp. was 42 degrees and pH was 7. No violations were identied at this inspection.
 
|-
 
|-
 
| 1386606583
 
| 1386606583
 
| 2013-12-06
 
| 2013-12-06
|  
+
| Solution Mining Project
 +
| No Violations
 
| Dallas Morris Drilling Rig #15 moving on location and rigging. Conducted prespud meeting with Mike Schumacher ( 586.530.8111 ) of Cargill Inc. to discuss casing hardware, wait on cement ( WOC ) time, Inspector notication, corrective measures if the horizontal lateral from Well #77 to Well #76  is encountered. No violations found at this time.
 
| Dallas Morris Drilling Rig #15 moving on location and rigging. Conducted prespud meeting with Mike Schumacher ( 586.530.8111 ) of Cargill Inc. to discuss casing hardware, wait on cement ( WOC ) time, Inspector notication, corrective measures if the horizontal lateral from Well #77 to Well #76  is encountered. No violations found at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1387469764
 
| 1387469764
 
| 2013-12-18
 
| 2013-12-18
|  
+
| Solution Mining Project
| I checked the drilling progress on the City Of Akron # 78 well being drilled by Dallas Morris Rig # 15. At this inspection the rig was drilling at 1416' KB with a rate of penetration of 16.8 '/hr. The rig is using a Fresh Water mud system at this time. No violations were identified at this inspection
+
| No Violations
|
+
| I checked the drilling progress on the City Of Akron # 78 well being drilled by Dallas Morris Rig # 15. At this inspection the rig was drilling at 1416 KB with a rate of penetration of 16.8 /hr. The rig is using a Fresh Water mud system at this time. No violations were identified at this inspection
|
 
|
 
|-
 
 
|-
 
|-
 
| 1387557582
 
| 1387557582
 
| 2013-12-29
 
| 2013-12-29
|  
+
| Solution Mining Project
 +
| No Violations
 
| I inspected the drilling of the City of Akron #78 ( SMP # 4 ) @ 0945 hrs. Presently, drill string is hung in hole. Bit is at 2040 KB. Mud pump problems leading to dirty hole conditions and hung bit and sub. Scheduled to switch to brine fluid drilling system today. I found Hydralic fluid on the ground around the Mud pumps and instructed the rig crew to lay down absorbent diapers to remove the fluid. The spill was cleaned -up satisfactory.
 
| I inspected the drilling of the City of Akron #78 ( SMP # 4 ) @ 0945 hrs. Presently, drill string is hung in hole. Bit is at 2040 KB. Mud pump problems leading to dirty hole conditions and hung bit and sub. Scheduled to switch to brine fluid drilling system today. I found Hydralic fluid on the ground around the Mud pumps and instructed the rig crew to lay down absorbent diapers to remove the fluid. The spill was cleaned -up satisfactory.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1388409095
 
| 1388409095
 
| 2013-12-29
 
| 2013-12-29
|  
+
| Solution Mining Project
| I was on this location to inspect the placement and cementing of the 7 casing string. Dallas Morris Rig #15 ran 69 joints of 7 , 23# , J-55 , ERW, R-3 , ST&C , 8rd. Casing. Total run-in tally -3046' GL. Casing hardware included Float Guide shoe, 12 centralizers ( ran on every 6th collar ). Universal Well Services cemented with 830 sacks of Type 1 w/ 5lbs per sack Gilsonite, 3% NaCl , 1/4% ( Vol. ) foamcheck. Mix water was saturated Brine ( 10.1 ). I observed 35 barrels of cement circulated to the steel pits. No violations were identified .
+
| No Violations
|
+
| I was on this location to inspect the placement and cementing of the 7 casing string. Dallas Morris Rig #15 ran 69 joints of 7 , 23# , J-55 , ERW, R-3 , ST&C , 8rd. Casing. Total run-in tally -3046 GL. Casing hardware included Float Guide shoe, 12 centralizers ( ran on every 6th collar ). Universal Well Services cemented with 830 sacks of Type 1 w/ 5lbs per sack Gilsonite, 3% NaCl , 1/4% ( Vol. ) foamcheck. Mix water was saturated Brine ( 10.1 ). I observed 35 barrels of cement circulated to the steel pits. No violations were identified .
|
 
|
 
|-
 
 
|-
 
|-
 
| 1391095261
 
| 1391095261
 
| 2014-01-30
 
| 2014-01-30
|  
+
| Solution Mining Project
 +
| No Violations
 
| I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conditions required a pressure test to a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the 7 casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and  @1349 hrs. Hilco pressured up to 600 psi to start the test.. At 1354 hrs. -600 psi. , @ 1359 hrs. - 593 psi. , @ 1404 hrs. - 590 psi. , test ended @ 1408 hrs. with a final pressure reading of 590 psi. A 10 psi drop is within the 5 % allowable ( 30 psi ) limits. Test passed
 
| I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conditions required a pressure test to a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the 7 casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and  @1349 hrs. Hilco pressured up to 600 psi to start the test.. At 1354 hrs. -600 psi. , @ 1359 hrs. - 593 psi. , @ 1404 hrs. - 590 psi. , test ended @ 1408 hrs. with a final pressure reading of 590 psi. A 10 psi drop is within the 5 % allowable ( 30 psi ) limits. Test passed
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1418659102
 
| 1418659102
 
| 2014-12-05
 
| 2014-12-05
|  
+
| Preliminary Restoration
 +
| No Violations
 
| Preliminary restoration was complete and meets all requirements.
 
| Preliminary restoration was complete and meets all requirements.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1531231030
 +
| 2018-07-09
 +
| Solution Mining Project
 +
| No Violations
 +
| I was on location for a MIT.  I met with Carey Morgan with Cargill.  The net pressure change for the well was 0.002 psi/hr which is well below the minimum required net pressure change of 0.05 psi/hr.  I observed no leaks or spill during the test.
 
|-
 
|-
| -1715752944
+
| 1715752944
 
| 2013-12-17
 
| 2013-12-17
|  
+
| Solution Mining Project
| I performed a status check on the City of Akron # 78 ( SMP #4 ) and found that the Dallas Morris drilling rig had shut down at 1138' KB. Their Mud Pump engine blew-up and were awaiting a replacement. Not drilling ahead, shutdown.No violations
+
| No Violations
|
+
| I performed a status check on the City of Akron # 78 ( SMP #4 ) and found that the Dallas Morris drilling rig had shut down at 1138 KB. Their Mud Pump engine blew-up and were awaiting a replacement. Not drilling ahead, shutdown.No violations
|
 
|
 
 
|-
 
|-
 +
| 2128332066
 +
| 2018-01-31
 +
| Solution Mining Project
 +
| No Violations
 +
| I was on location to inspect the UIC well.  I found no spill or leaks.  There is a locked chain link fence around the well.  An identification sign is posted on the fence.  A wooden structure is built over the well.  There are no violations at this time.
 
|-
 
|-
| 419189501
+
|}
| 2013-12-08
+
<!--==== Violations Commited ====
|  
+
{| class="wikitable sortable" width="95%"
| I was on location to witness the cementing of the Conductor casing. Dallas Morris Rig #15 drove 24 casing to 7'. The Rig drilled 20 hole to 120' and ran 16 casing to 102'. Universal Well Services moved in and cemented the 16 casing with 140 sacks of Type 1, 3 %  CaCl2 and displaced to 82' with 18.5 Bbls. fresh water. I observed approximately 11 Bbls of cement returns to the half round. Displacement pressure was 178 psi. Water temp. was 42 degrees and pH was 7. No violations were identied at this inspection.
+
!scope="col" style="text-align: center"| Inspection ID
|  
+
!scope="col" style="text-align: center"| Violation ID
|  
+
!scope="col" style="text-align: center"| Violation Date
|  
+
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 
|-
 
|-
|}
+
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 11:02, 24 July 2019

Well Details

Well ID: 34-153-23168
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Coventry Township
Operator Name: CARGILL INC
Well Pad ID:
Farm/Lease Name: CITY OF AKRON (SMP #4)
License Status: Active Injection
License Date: 2013-12-07
Spud Date: 2013-12-07
Spud Drilling Contractor: DALLAS MORRIS
Final Drill Date: 2013-12-29
Well Total Depth: 3158 ft
Configuration: Vertical
Latitude: 41.018018745
Longitude: -81.56031205

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-20 Proposed Formations:SALINA, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Reached Total Depth 2013-12-29
Completion Report Received 2014-05-05
Construction Permit Expires 2014-08-20
Last Compliance Report 2016-05-16
Record Last Modified 2017-02-10

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0126031980 2013-12-08 Solution Mining Project No Violations Dallas Morris Rig # 15 spudded City of Akron Well # 78 @ 0500 hrs. I did not observe any violations at this time.
0183468973 2016-08-16 Solution Mining Project No Violations There were no violations at the time of inspection.
0419189501 2013-12-08 Casing String Witnessed No Violations I was on location to witness the cementing of the Conductor casing. Dallas Morris Rig #15 drove 24 casing to 7. The Rig drilled 20 hole to 120 and ran 16 casing to 102. Universal Well Services moved in and cemented the 16 casing with 140 sacks of Type 1, 3 % CaCl2 and displaced to 82 with 18.5 Bbls. fresh water. I observed approximately 11 Bbls of cement returns to the half round. Displacement pressure was 178 psi. Water temp. was 42 degrees and pH was 7. No violations were identied at this inspection.
1386606583 2013-12-06 Solution Mining Project No Violations Dallas Morris Drilling Rig #15 moving on location and rigging. Conducted prespud meeting with Mike Schumacher ( 586.530.8111 ) of Cargill Inc. to discuss casing hardware, wait on cement ( WOC ) time, Inspector notication, corrective measures if the horizontal lateral from Well #77 to Well #76 is encountered. No violations found at this time.
1387469764 2013-12-18 Solution Mining Project No Violations I checked the drilling progress on the City Of Akron # 78 well being drilled by Dallas Morris Rig # 15. At this inspection the rig was drilling at 1416 KB with a rate of penetration of 16.8 /hr. The rig is using a Fresh Water mud system at this time. No violations were identified at this inspection
1387557582 2013-12-29 Solution Mining Project No Violations I inspected the drilling of the City of Akron #78 ( SMP # 4 ) @ 0945 hrs. Presently, drill string is hung in hole. Bit is at 2040 KB. Mud pump problems leading to dirty hole conditions and hung bit and sub. Scheduled to switch to brine fluid drilling system today. I found Hydralic fluid on the ground around the Mud pumps and instructed the rig crew to lay down absorbent diapers to remove the fluid. The spill was cleaned -up satisfactory.
1388409095 2013-12-29 Solution Mining Project No Violations I was on this location to inspect the placement and cementing of the 7 casing string. Dallas Morris Rig #15 ran 69 joints of 7 , 23# , J-55 , ERW, R-3 , ST&C , 8rd. Casing. Total run-in tally -3046 GL. Casing hardware included Float Guide shoe, 12 centralizers ( ran on every 6th collar ). Universal Well Services cemented with 830 sacks of Type 1 w/ 5lbs per sack Gilsonite, 3% NaCl , 1/4% ( Vol. ) foamcheck. Mix water was saturated Brine ( 10.1 ). I observed 35 barrels of cement circulated to the steel pits. No violations were identified .
1391095261 2014-01-30 Solution Mining Project No Violations I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conditions required a pressure test to a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the 7 casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @1349 hrs. Hilco pressured up to 600 psi to start the test.. At 1354 hrs. -600 psi. , @ 1359 hrs. - 593 psi. , @ 1404 hrs. - 590 psi. , test ended @ 1408 hrs. with a final pressure reading of 590 psi. A 10 psi drop is within the 5 % allowable ( 30 psi ) limits. Test passed
1418659102 2014-12-05 Preliminary Restoration No Violations Preliminary restoration was complete and meets all requirements.
1531231030 2018-07-09 Solution Mining Project No Violations I was on location for a MIT. I met with Carey Morgan with Cargill. The net pressure change for the well was 0.002 psi/hr which is well below the minimum required net pressure change of 0.05 psi/hr. I observed no leaks or spill during the test.
1715752944 2013-12-17 Solution Mining Project No Violations I performed a status check on the City of Akron # 78 ( SMP #4 ) and found that the Dallas Morris drilling rig had shut down at 1138 KB. Their Mud Pump engine blew-up and were awaiting a replacement. Not drilling ahead, shutdown.No violations
2128332066 2018-01-31 Solution Mining Project No Violations I was on location to inspect the UIC well. I found no spill or leaks. There is a locked chain link fence around the well. An identification sign is posted on the fence. A wooden structure is built over the well. There are no violations at this time.

For data sources see[3]

References