If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-111-24395 | | Well ID: 34-111-24395 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.641641229, -80.92752804 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | | + | | County: [[Monroe_County,_Ohio|Monroe]] |
|- | |- | ||
− | | | + | | Municipality: [[Lee,_Monroe_County,_Ohio|Lee]] |
|- | |- | ||
− | | | + | | Operator Name: [[ECLIPSE RESOURCES I LP]] |
|- | |- | ||
− | | | + | | Well Pad ID: [[803]] |
|- | |- | ||
− | | | + | | Farm/Lease Name: STALDER UNIT A |
+ | |- | ||
+ | | License Status: Producing | ||
+ | |- | ||
+ | | License Date: 2014-05-27 | ||
|- | |- | ||
| Spud Date: 2013-06-09 | | Spud Date: 2013-06-09 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[ALPHA-HUNTER]] |
+ | |- | ||
+ | | Final Drill Date: 2013-08-20 | ||
|- | |- | ||
− | | | + | | Well Total Depth: 11828 ft |
|- | |- | ||
− | | | + | | Configuration: Horizontal |
|- | |- | ||
− | | | + | | Latitude: 39.641641229 |
|- | |- | ||
− | | | + | | Longitude: -80.92752804 |
+ | |} | ||
+ | For data sources see<ref name=RBDMS>{{cite web | ||
+ | | title = RBDMS | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" style="width: 50%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | | 2014-12-10 |
+ | | style="text-align: right;" | 6176 | ||
+ | | style="text-align: right;" | 11730 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Period |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Operator Name |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Production Days |
− | + | |- | |
− | + | | 2014 | |
+ | | [[TRIAD HUNTER LLC]] | ||
+ | | style="text-align: right;" | 264491 | ||
+ | | style="text-align: right;" | 2161 | ||
+ | | style="text-align: right;" | 24 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[TRIAD HUNTER LLC]] | ||
+ | | style="text-align: right;" | 16585 | ||
+ | | style="text-align: right;" | 1552 | ||
+ | | style="text-align: right;" | 9 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[TRIAD HUNTER LLC]] | ||
+ | | style="text-align: right;" | 950775 | ||
+ | | style="text-align: right;" | 43108 | ||
+ | | style="text-align: right;" | 367 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[TRIAD HUNTER LLC]] | ||
+ | | style="text-align: right;" | 454532 | ||
+ | | style="text-align: right;" | 10426 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2018 |
− | | | + | | [[ECLIPSE RESOURCES I LP]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 432334 |
− | + | | style="text-align: right;" | 6059 | |
− | + | | style="text-align: right;" | 348 | |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | | ||
|- | |- | ||
+ | | 2019 | ||
+ | | [[ECLIPSE RESOURCES I LP]] | ||
+ | | style="text-align: right;" | 93537 | ||
+ | | style="text-align: right;" | 1349 | ||
+ | | style="text-align: right;" | 87 | ||
|- | |- | ||
− | | | + | |} |
− | | style="text-align: | + | For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web |
− | + | | title = Ohio Combined Annual Production Data | |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | + | | date = 2019-05-07 | |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2019-05-21 }}</ref> | |
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
|- | |- | ||
+ | | 2014 | ||
+ | | [[TRIAD HUNTER LLC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 6041 | ||
+ | | style="text-align: right;" | 24 | ||
|- | |- | ||
− | | | + | | 2015 |
− | + | | [[TRIAD HUNTER LLC]] | |
− | + | | Brine | |
− | | | + | | style="text-align: right;" | 173 |
− | | | + | | style="text-align: right;" | 9 |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | | ||
|- | |- | ||
+ | | 2016 | ||
+ | | [[TRIAD HUNTER LLC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 12769 | ||
+ | | style="text-align: right;" | 367 | ||
|- | |- | ||
− | | | + | | 2017 |
− | + | | [[TRIAD HUNTER LLC]] | |
− | + | | Brine | |
− | | | + | | style="text-align: right;" | 7671 |
− | | | + | | style="text-align: right;" | 334 |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | | ||
|- | |- | ||
+ | | 2018 | ||
+ | | [[ECLIPSE RESOURCES I LP]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 10994 | ||
+ | | style="text-align: right;" | 348 | ||
|- | |- | ||
− | | | + | | 2019 |
− | + | | [[ECLIPSE RESOURCES I LP]] | |
− | + | | Brine | |
− | | | + | | style="text-align: right;" | 1194 |
− | | | + | | style="text-align: right;" | 87 |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/><ref name=Annual_Prod/> |
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | ||
− | |||
|- | |- | ||
− | | | + | | 0103380974 |
| 2013-08-12 | | 2013-08-12 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Status check inspection update on the current drilling progress found the current drilling depth to be 10,272 | + | | No Violations |
− | | | + | | Status check inspection update on the current drilling progress found the current drilling depth to be 10,272 with a projected total depth to be drilled of 11,823. The company is currently off bottom and circulating the borehole due to a equipment malfunction on one of the mud pumps, the pump is due to be repaired by the end of the day and drilling is to resume. |
− | | | + | |- |
− | | | + | | 0203316934 |
+ | | 2019-03-12 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | Status check inspection accompanied by ODNR Inspector Ken Fry found the well equipped with a lower A and upper B section with 2 diameter riser pipes attached to the service ports on the A&B sections. The riser pipes are equipped with valves and gauges for the purpose of annular pressure monitoring. The A section pressure gauge reads zero pounds and the B section pressure reads 325 pounds. The 5.5 production casing well head section flow cross is equipped with a gauge that reads 400 pounds pressure . The well head is equipped with a production tree and lubricator head with 155 pounds pressure on the production tree. The well is flowing through a sand trap separator. On site on this day were company representatives Neil Ingram and George Winland. The well head B section is above grade that will not allow the well to be temporally abandoned below grade while additional wells are drilled on the pad. | ||
+ | |- | ||
+ | | 0420846708 | ||
+ | | 2014-03-05 | ||
+ | | Completion Testing | ||
+ | | No Violations | ||
+ | | Status check inspection found Producers Services set up stimulating stage 7 of 28 to be completed Grey wire line services perforated the well bore from 10,534 to 10,384 with 4 clusters of 18 shots with a completion frac plug set at 10,559. | ||
+ | |- | ||
+ | | 0573233421 | ||
+ | | 2013-06-10 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | The said well was spudded on 06/09/13 by Express Energy services with 100 of 26 conductor set and cemented to surface on 06/09/13. | ||
+ | |- | ||
+ | | 0718447954 | ||
+ | | 2013-06-27 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Status check inspection found Alpha Hunter rig # 7 rigging up on the hole and should respud within the next 48 hours. | ||
+ | |- | ||
+ | | 0752971448 | ||
+ | | 2014-03-17 | ||
+ | | Completion Testing | ||
+ | | No Violations | ||
+ | | Status check inspection of the production casing post stimulation clean out process found a service rig on the hole currently drilling out between the 6th and 7th stimulation plug set. Recommendations were given to the company representative on site to ground all tanks being used in the process and consider using explosion proof fluid transfer portable pumps along with move the portable heaters back from the operations to a distance of not less than 50. | ||
+ | |- | ||
+ | | 0790407939 | ||
+ | | 2013-07-19 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Status check inspection found the drilling rig Alpha Hunter Rig # 7 tripping back in the hole after a bit change. The current drilling depth is 5859 with a 8.750 bit with a projected total depth of this current stage to be 6,200, the company will then plug back and start to drill and build their horizontal curve. | ||
|- | |- | ||
+ | | 0985416215 | ||
+ | | 2013-07-11 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Status check inspection and review of the 9.625 casing ran and cemented along with the review of the BOP test. Upon review of the BOP test it was noted that the pipe ram test was not done due to the proper the company not having the right pipe rams. The accumulator remotely controlled actuation control panel was not functioning and would only manually operate. The company man on site and myself agreed that a full BOP and accumulator retest was to be done before proceeding to drill again once the proper repairs were made. | ||
|- | |- | ||
| 1372777495 | | 1372777495 | ||
| 2013-07-02 | | 2013-07-02 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Status check inspection of the drilling progress found the current drilling depth to be 352 | + | | No Violations |
− | + | | Status check inspection of the drilling progress found the current drilling depth to be 352 using a 17.5 bit and drilling on air. The next casing to be set shall be 13.375 surface at 632. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1372879708 | | 1372879708 | ||
| 2013-07-03 | | 2013-07-03 | ||
− | | | + | | Casing String Witnessed |
− | | On this day I witnessed the running and setting of 634 | + | | No Violations |
− | + | | On this day I witnessed the running and setting of 634 of 13.375 surface casing. With Halliburton cement services cementing the casing back to surface. There were 2 500 barrel fresh water mix tanks to be potentially used for this cement job with one tank showing a low level of chlorides and not used on this job. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1373926503 | | 1373926503 | ||
| 2013-07-15 | | 2013-07-15 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Inspection of the drilling progress found the current drilling depth to be 3770 | + | | No Violations |
− | + | | Inspection of the drilling progress found the current drilling depth to be 3770 using a 8.750 drill bit. With the company rigging up to start drilling on fluid. The drilling supervisor and myself discussed the recent cement tickets from Halliburton services and the fact that I am still waiting on a cement additive breakdown from those jobs. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1374527478 | | 1374527478 | ||
| 2013-07-22 | | 2013-07-22 | ||
− | | | + | | Plug / Plug Back |
− | | On this day I witnessed the setting of the kick plug. The well bore was plugged back after being Open Hole logged. The well TD was 6226. One solid plug was set in 2 stages; with the 1st plug set from 6225 | + | | No Violations |
− | + | | On this day I witnessed the setting of the kick plug. The well bore was plugged back after being Open Hole logged. The well TD was 6226. One solid plug was set in 2 stages; with the 1st plug set from 6225 to 5663 then 13 stands were pulled and displaced with 79 barrels the next plug set from 5663 to 5098 and then 14 stands were pulled and displaced with 72 barrels; both plugs were displaced with oil based drill mud. Class H cement was used with a mud sweep ahead. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1374892816 | | 1374892816 | ||
| 2013-07-26 | | 2013-07-26 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Status check inspection of the drilling progress found the current drilling depth to be 5129 | + | | No Violations |
− | + | | Status check inspection of the drilling progress found the current drilling depth to be 5129 with the driller time drilling and beginning to build the top section of the horizontal curve. The company is drilling on oil base drilling mud. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1375984214 | | 1375984214 | ||
| 2013-08-08 | | 2013-08-08 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Status check inspection on the current drilling progress found the current drilling depth to be 9615 | + | | No Violations |
− | + | | Status check inspection on the current drilling progress found the current drilling depth to be 9615 using a 8.750 drill bit, the drilling progress is currently delayed due to issues with the mud pump. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1376586374 | | 1376586374 | ||
| 2013-08-15 | | 2013-08-15 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| The total depth to be drilled has been reached at 11,829. With a Azimuth of 315.23 degrees. | | The total depth to be drilled has been reached at 11,829. With a Azimuth of 315.23 degrees. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1377012316 | | 1377012316 | ||
| 2013-08-20 | | 2013-08-20 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| On this day I received from the company man on site the records from the casing long string cement job. I also spoke with Tim Neil from Triad Hunter and we are working with Halliburton to get the incomplete cement ticket information so I may complete the casing cement reports. | | On this day I received from the company man on site the records from the casing long string cement job. I also spoke with Tim Neil from Triad Hunter and we are working with Halliburton to get the incomplete cement ticket information so I may complete the casing cement reports. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1403209629 | | 1403209629 | ||
| 2014-03-05 | | 2014-03-05 | ||
− | | | + | | Completion Testing |
− | | Status check inspection found Producers Services set up stimulating stage 6 of 28 to be completed Grey wire line services perforated the well bore from 10,580 | + | | No Violations |
− | | | + | | Status check inspection found Producers Services set up stimulating stage 6 of 28 to be completed Grey wire line services perforated the well bore from 10,580 to 10,730 with 4 clusters of 18 shots with a completion frac plug set at 10,755. |
− | | | + | |- |
− | | | + | | 1451796983 |
+ | | 2016-02-16 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | Status check inspection found the well head equipped with (2) 5.185 master control primary gate valves assembled on the B-section well head along with (2) tubing head master valves and a primary control hydraulic emergency shut down in line valve on the tubing head stack located between the 2 tubing manual valves. There is a sand trap separator hooked into the production outlet flow line near the well head supported by a 100 barrel production tank located on location near the well head. The well does have production tubing in it and the well is currently in production with a total of 10- 400 barrel production tanks located on a production pad adjacent to the well pad with 7 gas processing units along with a gas compressor also located on the adjacent production pad. The well was put back on line after being turned over to the companys production department on and after 12/17/2015. Addressing the preliminary restoration- upon inspection of the well pad it was observed that the primary perimeter boundary affected by the well pad construction is secure and has no stability or erosion issues with vegetation established on the well pad perimeter. The well pad itself has earthen material that was stockpiled after a well control incident during December of 2014, According to Sam Miracle with Triads Engineering Department the material is slated to be addressed once the weather breaks this spring. There is also a large portable polymer lined water tank on the well pad location that is being emptied of all fluids currently and is to be disassembled and removed from the location in the future. | ||
|- | |- | ||
+ | | 1826588398 | ||
+ | | 2017-12-07 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | Preliminary restoration status check inspection found the area affected by the well pad construction perimeter boundary to be stable with vegetation established. There is a 2nd pad site that us used as a production pad that the lease road to the pad runs through that also has the perimeter established with vegetation, on the second pad is the tank farm that consists of a total of 10 steel design 500 barrel fluid capacity steel tanks situated inside a polymer lined steel containment area. There is also a large gas compressor and 5 gas processing units on the second pad site. Addressing the primary pad site there are 5 wells completed on the pad with all 5 wells found to be in operation on the pad. Proper well identification is posted on each well and at the tank farm battery site. The lease road is of stone construction. Bruce Carpenter with Eclipse Resources recently contacted me and indicated that Eclipse has taken over ownership of the wells and equipment. | ||
|- | |- | ||
− | | | + | | 2025227400 |
| 2013-07-08 | | 2013-07-08 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Status check inspection of the current well bore segment total drilling depth reached at 3075 | + | | No Violations |
− | | | + | | Status check inspection of the current well bore segment total drilling depth reached at 3075 using a 12.250 bit. The drilling company Alpha Hunter rig # 7 is pulling out of the hole with the drill string in preparation of running the 9.625 casing. A copy of the casing tally was received and reviewed. |
− | | | + | |- |
− | | | + | |} |
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref name=RBDMS/> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
|- | |- | ||
+ | |}--> | ||
+ | |||
+ | == Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
|- | |- | ||
− | |||
| 2014-03-05 | | 2014-03-05 | ||
− | | | + | | H2O |
− | | | + | | style="text-align: right;" | 0 |
− | + | | style="text-align: right;" | 9434 Gal | |
− | + | | style="text-align: right;" | 450700 | |
− | + | | [[Producers Service Corporation]] | |
+ | | Stage 6 of 28 to be stimulated, perforated with 4 clusters of 18 shots with a completion plug set at 10,580'. | ||
+ | Other Stages See Images. | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
|- | |- | ||
− | | | + | | APP |
− | | 2013- | + | | 2013-05-21 |
− | | | + | | Proposed Formations:MARCELLUS THRU ONODAGA, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | APP | ||
+ | | 2013-07-02 | ||
+ | | Proposed Formations:MARCELLUS SHALE, Issued Date:7/2/2013, Expired Date:7/2/2015 12:00:00 PM, Drilling unit acres:617.3, Proposed Well Type:OG, Proposed Well Class:EDPW | ||
|- | |- | ||
− | | | + | | Plugged Back |
− | | 2013- | + | | 2013-07-22 |
| | | | ||
− | | | + | |- |
+ | | Reached Total Depth | ||
+ | | 2013-08-20 | ||
| | | | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | Completion Report Received |
− | | 2014- | + | | 2014-12-09 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
− | | | + | | Construction Permit Expires |
− | + | | 2015-07-02 | |
− | | | ||
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
+ | | Change of Owner | ||
+ | | 2017-12-22 | ||
+ | | Operator changed from 8610, TRIAD HUNTER LLC to 8844, ECLIPSE RESOURCES I LP | ||
|- | |- | ||
− | | | + | | Record Last Modified |
− | | | + | | 2017-12-22 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/> |
− | + | ==References== | |
− | + | <references/> | |
− | |||
− | |||
− | |||
− | == References == | ||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-111-24395 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.641641229,"lon":-80.92752804,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Lee | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: 803 | |
Farm/Lease Name: STALDER UNIT A | |
License Status: Producing | |
License Date: 2014-05-27 | |
Spud Date: 2013-06-09 | |
Spud Drilling Contractor: ALPHA-HUNTER | |
Final Drill Date: 2013-08-20 | |
Well Total Depth: 11828 ft | |
Configuration: Horizontal | |
Latitude: 39.641641229 | |
Longitude: -80.92752804 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-12-10 | 6176 | 11730 | 0 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | TRIAD HUNTER LLC | 264491 | 2161 | 24 |
2015 | TRIAD HUNTER LLC | 16585 | 1552 | 9 |
2016 | TRIAD HUNTER LLC | 950775 | 43108 | 367 |
2017 | TRIAD HUNTER LLC | 454532 | 10426 | 365 |
2018 | ECLIPSE RESOURCES I LP | 432334 | 6059 | 348 |
2019 | ECLIPSE RESOURCES I LP | 93537 | 1349 | 87 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | TRIAD HUNTER LLC | Brine | 6041 | 24 |
2015 | TRIAD HUNTER LLC | Brine | 173 | 9 |
2016 | TRIAD HUNTER LLC | Brine | 12769 | 367 |
2017 | TRIAD HUNTER LLC | Brine | 7671 | 334 |
2018 | ECLIPSE RESOURCES I LP | Brine | 10994 | 348 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1194 | 87 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0103380974 | 2013-08-12 | Drill / Deepen / Reopen | No Violations | Status check inspection update on the current drilling progress found the current drilling depth to be 10,272 with a projected total depth to be drilled of 11,823. The company is currently off bottom and circulating the borehole due to a equipment malfunction on one of the mud pumps, the pump is due to be repaired by the end of the day and drilling is to resume. |
0203316934 | 2019-03-12 | Production Wells | No Violations | Status check inspection accompanied by ODNR Inspector Ken Fry found the well equipped with a lower A and upper B section with 2 diameter riser pipes attached to the service ports on the A&B sections. The riser pipes are equipped with valves and gauges for the purpose of annular pressure monitoring. The A section pressure gauge reads zero pounds and the B section pressure reads 325 pounds. The 5.5 production casing well head section flow cross is equipped with a gauge that reads 400 pounds pressure . The well head is equipped with a production tree and lubricator head with 155 pounds pressure on the production tree. The well is flowing through a sand trap separator. On site on this day were company representatives Neil Ingram and George Winland. The well head B section is above grade that will not allow the well to be temporally abandoned below grade while additional wells are drilled on the pad. |
0420846708 | 2014-03-05 | Completion Testing | No Violations | Status check inspection found Producers Services set up stimulating stage 7 of 28 to be completed Grey wire line services perforated the well bore from 10,534 to 10,384 with 4 clusters of 18 shots with a completion frac plug set at 10,559. |
0573233421 | 2013-06-10 | Drill / Deepen / Reopen | No Violations | The said well was spudded on 06/09/13 by Express Energy services with 100 of 26 conductor set and cemented to surface on 06/09/13. |
0718447954 | 2013-06-27 | Drill / Deepen / Reopen | No Violations | Status check inspection found Alpha Hunter rig # 7 rigging up on the hole and should respud within the next 48 hours. |
0752971448 | 2014-03-17 | Completion Testing | No Violations | Status check inspection of the production casing post stimulation clean out process found a service rig on the hole currently drilling out between the 6th and 7th stimulation plug set. Recommendations were given to the company representative on site to ground all tanks being used in the process and consider using explosion proof fluid transfer portable pumps along with move the portable heaters back from the operations to a distance of not less than 50. |
0790407939 | 2013-07-19 | Drill / Deepen / Reopen | No Violations | Status check inspection found the drilling rig Alpha Hunter Rig # 7 tripping back in the hole after a bit change. The current drilling depth is 5859 with a 8.750 bit with a projected total depth of this current stage to be 6,200, the company will then plug back and start to drill and build their horizontal curve. |
0985416215 | 2013-07-11 | Drill / Deepen / Reopen | No Violations | Status check inspection and review of the 9.625 casing ran and cemented along with the review of the BOP test. Upon review of the BOP test it was noted that the pipe ram test was not done due to the proper the company not having the right pipe rams. The accumulator remotely controlled actuation control panel was not functioning and would only manually operate. The company man on site and myself agreed that a full BOP and accumulator retest was to be done before proceeding to drill again once the proper repairs were made. |
1372777495 | 2013-07-02 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling progress found the current drilling depth to be 352 using a 17.5 bit and drilling on air. The next casing to be set shall be 13.375 surface at 632. |
1372879708 | 2013-07-03 | Casing String Witnessed | No Violations | On this day I witnessed the running and setting of 634 of 13.375 surface casing. With Halliburton cement services cementing the casing back to surface. There were 2 500 barrel fresh water mix tanks to be potentially used for this cement job with one tank showing a low level of chlorides and not used on this job. |
1373926503 | 2013-07-15 | Drill / Deepen / Reopen | No Violations | Inspection of the drilling progress found the current drilling depth to be 3770 using a 8.750 drill bit. With the company rigging up to start drilling on fluid. The drilling supervisor and myself discussed the recent cement tickets from Halliburton services and the fact that I am still waiting on a cement additive breakdown from those jobs. |
1374527478 | 2013-07-22 | Plug / Plug Back | No Violations | On this day I witnessed the setting of the kick plug. The well bore was plugged back after being Open Hole logged. The well TD was 6226. One solid plug was set in 2 stages; with the 1st plug set from 6225 to 5663 then 13 stands were pulled and displaced with 79 barrels the next plug set from 5663 to 5098 and then 14 stands were pulled and displaced with 72 barrels; both plugs were displaced with oil based drill mud. Class H cement was used with a mud sweep ahead. |
1374892816 | 2013-07-26 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling progress found the current drilling depth to be 5129 with the driller time drilling and beginning to build the top section of the horizontal curve. The company is drilling on oil base drilling mud. |
1375984214 | 2013-08-08 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress found the current drilling depth to be 9615 using a 8.750 drill bit, the drilling progress is currently delayed due to issues with the mud pump. |
1376586374 | 2013-08-15 | Drill / Deepen / Reopen | No Violations | The total depth to be drilled has been reached at 11,829. With a Azimuth of 315.23 degrees. |
1377012316 | 2013-08-20 | Drill / Deepen / Reopen | No Violations | On this day I received from the company man on site the records from the casing long string cement job. I also spoke with Tim Neil from Triad Hunter and we are working with Halliburton to get the incomplete cement ticket information so I may complete the casing cement reports. |
1403209629 | 2014-03-05 | Completion Testing | No Violations | Status check inspection found Producers Services set up stimulating stage 6 of 28 to be completed Grey wire line services perforated the well bore from 10,580 to 10,730 with 4 clusters of 18 shots with a completion frac plug set at 10,755. |
1451796983 | 2016-02-16 | Preliminary Restoration | No Violations | Status check inspection found the well head equipped with (2) 5.185 master control primary gate valves assembled on the B-section well head along with (2) tubing head master valves and a primary control hydraulic emergency shut down in line valve on the tubing head stack located between the 2 tubing manual valves. There is a sand trap separator hooked into the production outlet flow line near the well head supported by a 100 barrel production tank located on location near the well head. The well does have production tubing in it and the well is currently in production with a total of 10- 400 barrel production tanks located on a production pad adjacent to the well pad with 7 gas processing units along with a gas compressor also located on the adjacent production pad. The well was put back on line after being turned over to the companys production department on and after 12/17/2015. Addressing the preliminary restoration- upon inspection of the well pad it was observed that the primary perimeter boundary affected by the well pad construction is secure and has no stability or erosion issues with vegetation established on the well pad perimeter. The well pad itself has earthen material that was stockpiled after a well control incident during December of 2014, According to Sam Miracle with Triads Engineering Department the material is slated to be addressed once the weather breaks this spring. There is also a large portable polymer lined water tank on the well pad location that is being emptied of all fluids currently and is to be disassembled and removed from the location in the future. |
1826588398 | 2017-12-07 | Preliminary Restoration | No Violations | Preliminary restoration status check inspection found the area affected by the well pad construction perimeter boundary to be stable with vegetation established. There is a 2nd pad site that us used as a production pad that the lease road to the pad runs through that also has the perimeter established with vegetation, on the second pad is the tank farm that consists of a total of 10 steel design 500 barrel fluid capacity steel tanks situated inside a polymer lined steel containment area. There is also a large gas compressor and 5 gas processing units on the second pad site. Addressing the primary pad site there are 5 wells completed on the pad with all 5 wells found to be in operation on the pad. Proper well identification is posted on each well and at the tank farm battery site. The lease road is of stone construction. Bruce Carpenter with Eclipse Resources recently contacted me and indicated that Eclipse has taken over ownership of the wells and equipment. |
2025227400 | 2013-07-08 | Drill / Deepen / Reopen | No Violations | Status check inspection of the current well bore segment total drilling depth reached at 3075 using a 12.250 bit. The drilling company Alpha Hunter rig # 7 is pulling out of the hole with the drill string in preparation of running the 9.625 casing. A copy of the casing tally was received and reviewed. |
For data sources see[1]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-03-05 | H2O | 0 | 9434 Gal | 450700 | Producers Service Corporation | Stage 6 of 28 to be stimulated, perforated with 4 clusters of 18 shots with a completion plug set at 10,580'.
Other Stages See Images. |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-21 | Proposed Formations:MARCELLUS THRU ONODAGA, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-07-02 | Proposed Formations:MARCELLUS SHALE, Issued Date:7/2/2013, Expired Date:7/2/2015 12:00:00 PM, Drilling unit acres:617.3, Proposed Well Type:OG, Proposed Well Class:EDPW |
Plugged Back | 2013-07-22 | |
Reached Total Depth | 2013-08-20 | |
Completion Report Received | 2014-12-09 | |
Construction Permit Expires | 2015-07-02 | |
Change of Owner | 2017-12-22 | Operator changed from 8610, TRIAD HUNTER LLC to 8844, ECLIPSE RESOURCES I LP |
Record Last Modified | 2017-12-22 |
For data sources see[1]