X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-059-24417"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-059-24417
 
| Well ID: 34-059-24417
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.02869261, -81.34617389 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.028632426, -81.34654436 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Guernsey County, Ohio|Guernsey]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Guernsey_County,_Ohio|Guernsey]]
 +
|-
 +
| Municipality: [[Wills_Township,_Guernsey_County,_Ohio|Wills Township]]
 
|-
 
|-
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
 
|-
 
|-
| Well Pad ID:  
+
| Well Pad ID: [[US-OH-001114]]
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: FINERAN B
 
|-
 
|-
| First Permit Date:  
+
| License Status: Well Drilled
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2019-01-14
 
|-
 
|-
 
| Spud Date: 2014-08-26
 
| Spud Date: 2014-08-26
 
|-
 
|-
| Unconventional:
+
| Spud Drilling Contractor: [[H&P DRILLING]]
|-
 
| Configuration:  
 
 
|-
 
|-
| Well Status: Drilling
+
| Final Drill Date: 2019-01-26
 
|-
 
|-
| Violations: 0
+
| Well Total Depth: 24700 ft
 
|-
 
|-
| Latitude: 40.02869261
+
| Configuration: Horizontal
 
|-
 
|-
| Longitude: -81.34617389
+
| Latitude: 40.028632426
 
|-
 
|-
 +
| Longitude: -81.34654436
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Well Status
!scope="col" | DATE
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Comment
!scope="col" | COMMENT
+
|-
!scope="col" | VIOLATION ID
+
| APP
!scope="col" | VIOLATION CODE
+
| 2014-08-25
!scope="col" | VIOLATION COMMENT
+
| Proposed Formations:TRENTON, Issued Date:8/25/2014, Expired Date:8/24/2016 12:00:00 PM, Drilling unit acres:683.601, Proposed Well Type:ST, Proposed Well Class:STRT
 +
|-
 +
| APP
 +
| 2016-12-16
 +
| Proposed Formations:TRENTON, Issued Date:12/16/2016, Expired Date:12/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
 +
|-
 +
| APP
 +
| 2018-10-30
 +
| Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/30/2018, Expired Date:10/29/2020 12:00:00 PM, Drilling unit acres:254.083, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| APP
 +
| 2019-01-14
 +
| Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/14/2019, Expired Date:1/13/2021 12:00:00 PM, Drilling unit acres:657.067, Proposed Well Type:OG, Proposed Well Class:POOL
 
|-
 
|-
| 524251870
+
| Reached Total Depth
| 2014-09-15
+
| 2019-01-26
|
 
| On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had drilled a 22inch diameter hole to the depth of 439 feet and ran 439 feet of 18.625 inch 87.5#/ft. J-55 casing. Halliburton was on site gained circulation with 165bbls fresh water then pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 290 sacks of BondCem cement with a weight of 15.8ppg verified by mud scales and a yield of 2.31cuft/sk. Cement was displaced with 120bbls of fresh water. Good circulation throughout job no cement was returned to surface only gel spacer. Alpha-Hunter Drilling Rig #9 ran 75 feet of 1 inch pipe and Halliburton topped off with 126 sacks of Class A 15.6ppg and a yield of 1.18. Good cement returns of 6bbls to surface.
 
 
|  
 
|  
 +
|-
 +
| Record Last Modified
 +
| 2019-04-08
 
|  
 
|  
 +
|-
 +
| Construction Permit Expires
 +
| 2021-01-13
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 
|-
 
|-
| -77444923
+
| 0077444923
 
| 2015-04-29
 
| 2015-04-29
|  
+
| Preliminary Restoration
 +
| No Violations
 
| On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, the site passed preliminary restoration according to ORC 1509.072A.
 
| On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, the site passed preliminary restoration according to ORC 1509.072A.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0384400814
 +
| 2019-02-12
 +
| Completion Testing
 +
| No Violations
 +
| The well was awaiting hydraulic stimulation operations. Pro Frac Services were on location pumping the first stage on the 7 H 3405924418.
 +
|-
 +
| 0524251870
 +
| 2014-09-15
 +
| Casing String Witnessed
 +
| No Violations
 +
| On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had drilled a 22inch diameter hole to the depth of 439 feet and ran 439 feet of 18.625 inch 87.5#/ft. J-55 casing. Halliburton was on site gained circulation with 165bbls fresh water then pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 290 sacks of BondCem cement with a weight of 15.8ppg verified by mud scales and a yield of 2.31cuft/sk. Cement was displaced with 120bbls of fresh water. Good circulation throughout job no cement was returned to surface only gel spacer. Alpha-Hunter Drilling Rig #9 ran 75 feet of 1 inch pipe and Halliburton topped off with 126 sacks of Class A 15.6ppg and a yield of 1.18. Good cement returns of 6bbls to surface.
 +
|-
 +
| 0818102540
 +
| 2019-01-22
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| During my inspection today, I was accompanied by Pat Shreve. H&P Drilling Rig 531 was on location tripping the drill pipe out of the hole after reaching total depth. Eclipse Company Man on location was Wade Gray.
 +
|-
 +
| 0953919454
 +
| 2019-05-13
 +
| Completion Testing
 +
| No Violations
 +
| During my inspection the well was equipped with a work over valve. All frac plugs have been drilled out and the well is awaiting flow back operations. Deep Well Snubbing Unit 15 was rigged up on the 3H well.
 
|-
 
|-
| 991545861
+
| 0991545861
 
| 2014-09-17
 
| 2014-09-17
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had completed cementing of their 13.325 inch intermediate casing and was rigging up their BOP with testing to follow.
 
| On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had completed cementing of their 13.325 inch intermediate casing and was rigging up their BOP with testing to follow.
|  
+
|-
|  
+
| 0994463842
|  
+
| 2019-05-28
 +
| Completion Testing
 +
| No Violations
 +
| The purpose of my inspection was a status check. During my inspection the wells were being prepared for flow back operations. Deep Well Snubbing Unit rig number 15 was being hauled from location. Production equipment was being assembled on location.
 +
|-
 +
| 1161136766
 +
| 2019-01-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The inspection revealed that the H&P 531 RIG is drilling at a depth of 13,646 feet in the lateral. The consultant Jack Turner stated that the total depth is 24,681 feet and will be reaching in 7 days.
 +
|-
 +
| 1548252902
 +
| 2019-01-22
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
 
 +
|-
 +
| 2084285340
 +
| 2019-04-30
 +
| Completion Testing
 +
| No Violations
 +
| The purpose of my inspection was a status check on completion operations. During my inspection the well had just recently had 111 stages of frac plugs drilled out and production tubing installed. A service rig was on location rigged up on the 7H well drilling out frac plugs.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 20:32, 30 July 2019

Well Details

Well ID: 34-059-24417
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Wills Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001114
Farm/Lease Name: FINERAN B
License Status: Well Drilled
License Date: 2019-01-14
Spud Date: 2014-08-26
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2019-01-26
Well Total Depth: 24700 ft
Configuration: Horizontal
Latitude: 40.028632426
Longitude: -81.34654436

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-08-25 Proposed Formations:TRENTON, Issued Date:8/25/2014, Expired Date:8/24/2016 12:00:00 PM, Drilling unit acres:683.601, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-12-16 Proposed Formations:TRENTON, Issued Date:12/16/2016, Expired Date:12/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2018-10-30 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/30/2018, Expired Date:10/29/2020 12:00:00 PM, Drilling unit acres:254.083, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2019-01-14 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/14/2019, Expired Date:1/13/2021 12:00:00 PM, Drilling unit acres:657.067, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-01-26
Record Last Modified 2019-04-08
Construction Permit Expires 2021-01-13

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0077444923 2015-04-29 Preliminary Restoration No Violations On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, the site passed preliminary restoration according to ORC 1509.072A.
0384400814 2019-02-12 Completion Testing No Violations The well was awaiting hydraulic stimulation operations. Pro Frac Services were on location pumping the first stage on the 7 H 3405924418.
0524251870 2014-09-15 Casing String Witnessed No Violations On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had drilled a 22inch diameter hole to the depth of 439 feet and ran 439 feet of 18.625 inch 87.5#/ft. J-55 casing. Halliburton was on site gained circulation with 165bbls fresh water then pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 290 sacks of BondCem cement with a weight of 15.8ppg verified by mud scales and a yield of 2.31cuft/sk. Cement was displaced with 120bbls of fresh water. Good circulation throughout job no cement was returned to surface only gel spacer. Alpha-Hunter Drilling Rig #9 ran 75 feet of 1 inch pipe and Halliburton topped off with 126 sacks of Class A 15.6ppg and a yield of 1.18. Good cement returns of 6bbls to surface.
0818102540 2019-01-22 Drill / Deepen / Reopen No Violations During my inspection today, I was accompanied by Pat Shreve. H&P Drilling Rig 531 was on location tripping the drill pipe out of the hole after reaching total depth. Eclipse Company Man on location was Wade Gray.
0953919454 2019-05-13 Completion Testing No Violations During my inspection the well was equipped with a work over valve. All frac plugs have been drilled out and the well is awaiting flow back operations. Deep Well Snubbing Unit 15 was rigged up on the 3H well.
0991545861 2014-09-17 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had completed cementing of their 13.325 inch intermediate casing and was rigging up their BOP with testing to follow.
0994463842 2019-05-28 Completion Testing No Violations The purpose of my inspection was a status check. During my inspection the wells were being prepared for flow back operations. Deep Well Snubbing Unit rig number 15 was being hauled from location. Production equipment was being assembled on location.
1161136766 2019-01-17 Drill / Deepen / Reopen No Violations The inspection revealed that the H&P 531 RIG is drilling at a depth of 13,646 feet in the lateral. The consultant Jack Turner stated that the total depth is 24,681 feet and will be reaching in 7 days.
1548252902 2019-01-22 Drill / Deepen / Reopen No Violations
2084285340 2019-04-30 Completion Testing No Violations The purpose of my inspection was a status check on completion operations. During my inspection the well had just recently had 111 stages of frac plugs drilled out and production tubing installed. A service rig was on location rigged up on the 7H well drilling out frac plugs.

For data sources see[3]

References