If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-115-24673 | | Well ID: 34-115-24673 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.709689401, -81.95731466 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: | + | | State: Ohio |
+ | |- | ||
+ | | County: [[Morgan_County,_Ohio|Morgan]] | ||
+ | |- | ||
+ | | Municipality: [[Deerfield,_Morgan_County,_Ohio|Deerfield]] | ||
|- | |- | ||
| Operator Name: [[ARTEX OIL COMPANY]] | | Operator Name: [[ARTEX OIL COMPANY]] | ||
Line 13: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: DAYSPRING UNIT |
|- | |- | ||
− | | | + | | License Status: Producing |
|- | |- | ||
− | | | + | | License Date: 2013-04-03 |
|- | |- | ||
| Spud Date: 2013-04-03 | | Spud Date: 2013-04-03 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[KILBARGER DRLG]] |
+ | |- | ||
+ | | Final Drill Date: 2013-04-18 | ||
+ | |- | ||
+ | | Well Total Depth: 6437 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | | + | | Latitude: 39.709689401 |
|- | |- | ||
− | | | + | | Longitude: -81.95731466 |
− | |- | + | |} |
− | | | + | For data sources see<ref name=RBDMS>{{cite web |
+ | | title = RBDMS | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" style="width: 50%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | | 2014-04-01 |
+ | | style="text-align: right;" | 6275 | ||
+ | | style="text-align: right;" | 6341 | ||
+ | | style="text-align: right;" | 53 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Period |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Operator Name |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Production Days |
− | !scope="col" | | + | |- |
− | !scope="col" | OIL | + | | 2014 |
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | style="text-align: right;" | 279929 | ||
+ | | style="text-align: right;" | 908 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | style="text-align: right;" | 185282 | ||
+ | | style="text-align: right;" | 521 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | style="text-align: right;" | 113951 | ||
+ | | style="text-align: right;" | 438 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | style="text-align: right;" | 90552 | ||
+ | | style="text-align: right;" | 297 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | style="text-align: right;" | 66714 | ||
+ | | style="text-align: right;" | 92 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web | ||
+ | | title = Ohio Combined Annual Production Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 139 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 108 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 63 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 46 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2018 |
− | + | | [[ARTEX OIL COMPANY]] | |
− | + | | Brine | |
− | | | + | | style="text-align: right;" | 24 |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | 365 | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/><ref name=Annual_Prod/> |
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | + | |- |
− | + | | 0798706389 | |
+ | | 2013-09-26 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | Preliminary restoration is passed in accordance to 1509.072. | ||
+ | |- | ||
+ | | 0966949572 | ||
+ | | 2018-12-18 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | I was on location today to do a field inspection on this well. The well is producing through the 2 inch diameter tubing that is ran inside the 4.5 inch diameter casing. There are 2 -100 barrel storage tanks located at the end of the lease road. The identification for the well is located on the production tank. There are no violations at this time. | ||
|- | |- | ||
| 1314406500 | | 1314406500 | ||
| 2013-06-03 | | 2013-06-03 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of | + | | No Violations |
− | + | | I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artexs most recently drilled wells. The pit was filled and there were dozers on location smoothing out the road and well location. The wellhead is shut in until they install production lines. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1365036757 | | 1365036757 | ||
| 2013-04-03 | | 2013-04-03 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| I was on location to witness the cementing of the conductor casing by Formation Cement Company. There was good returns on the cement job. | | I was on location to witness the cementing of the conductor casing by Formation Cement Company. There was good returns on the cement job. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1365175220 | | 1365175220 | ||
| 2013-04-05 | | 2013-04-05 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 719 | + | | No Violations |
− | + | | I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 719. The casing shoe depth was 687. Centralizers were not run on the surface casing and the baffle insert was at a depth of 644. The operator encountered hard sandstone with fresh water at 601-632 which slowed drilling earlier. Formation cement on location. The plug was down at 10:55am with good cement returns, and casing pressure was held at 600 psi for 5 minutes. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1375900083 | | 1375900083 | ||
| 2013-08-07 | | 2013-08-07 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| The well is currently shut in however the lines have been buried and tied into a new separator and tank up at top of acces road. There is a good dike around the tank. Operator still needs to seed and mulch location. | | The well is currently shut in however the lines have been buried and tied into a new separator and tank up at top of acces road. There is a good dike around the tank. Operator still needs to seed and mulch location. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref name=RBDMS/> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
+ | |- | ||
+ | | 2013-04-24 | ||
+ | | ACID | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | [[Producers Service Corporation]] | ||
+ | | 53 SHOTS | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2013-03-08 | ||
+ | | Proposed Formations:QUEENSTON THRU KNOX, Issued Date:3/8/2013, Expired Date:3/8/2015 12:00:00 PM, Drilling unit acres:50, Proposed Well Type:OG, Proposed Well Class:EDPW | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
− | | 2013- | + | | 2013-04-18 |
| | | | ||
− | | | + | |- |
+ | | Completion Report Received | ||
+ | | 2014-03-31 | ||
| | | | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2015-03-08 | ||
| | | | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-15 | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/> |
− | + | ==References== | |
− | + | <references/> | |
− | |||
− | |||
− | |||
− | == References == | ||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-115-24673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.709689401,"lon":-81.95731466,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Deerfield | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: DAYSPRING UNIT | |
License Status: Producing | |
License Date: 2013-04-03 | |
Spud Date: 2013-04-03 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2013-04-18 | |
Well Total Depth: 6437 ft | |
Configuration: Vertical | |
Latitude: 39.709689401 | |
Longitude: -81.95731466 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-04-01 | 6275 | 6341 | 53 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ARTEX OIL COMPANY | 279929 | 908 | 365 |
2015 | ARTEX OIL COMPANY | 185282 | 521 | 365 |
2016 | ARTEX OIL COMPANY | 113951 | 438 | 365 |
2017 | ARTEX OIL COMPANY | 90552 | 297 | 365 |
2018 | ARTEX OIL COMPANY | 66714 | 92 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ARTEX OIL COMPANY | Brine | 139 | 365 |
2015 | ARTEX OIL COMPANY | Brine | 108 | 365 |
2016 | ARTEX OIL COMPANY | Brine | 63 | 365 |
2017 | ARTEX OIL COMPANY | Brine | 46 | 365 |
2018 | ARTEX OIL COMPANY | Brine | 24 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0798706389 | 2013-09-26 | Preliminary Restoration | No Violations | Preliminary restoration is passed in accordance to 1509.072. |
0966949572 | 2018-12-18 | Production Wells | No Violations | I was on location today to do a field inspection on this well. The well is producing through the 2 inch diameter tubing that is ran inside the 4.5 inch diameter casing. There are 2 -100 barrel storage tanks located at the end of the lease road. The identification for the well is located on the production tank. There are no violations at this time. |
1314406500 | 2013-06-03 | Drill / Deepen / Reopen | No Violations | I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artexs most recently drilled wells. The pit was filled and there were dozers on location smoothing out the road and well location. The wellhead is shut in until they install production lines. |
1365036757 | 2013-04-03 | Drill / Deepen / Reopen | No Violations | I was on location to witness the cementing of the conductor casing by Formation Cement Company. There was good returns on the cement job. |
1365175220 | 2013-04-05 | Drill / Deepen / Reopen | No Violations | I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 719. The casing shoe depth was 687. Centralizers were not run on the surface casing and the baffle insert was at a depth of 644. The operator encountered hard sandstone with fresh water at 601-632 which slowed drilling earlier. Formation cement on location. The plug was down at 10:55am with good cement returns, and casing pressure was held at 600 psi for 5 minutes. |
1375900083 | 2013-08-07 | Drill / Deepen / Reopen | No Violations | The well is currently shut in however the lines have been buried and tied into a new separator and tank up at top of acces road. There is a good dike around the tank. Operator still needs to seed and mulch location. |
For data sources see[1]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-04-24 | ACID | 0 | 0 | 0 | Producers Service Corporation | 53 SHOTS |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-03-08 | Proposed Formations:QUEENSTON THRU KNOX, Issued Date:3/8/2013, Expired Date:3/8/2015 12:00:00 PM, Drilling unit acres:50, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-04-18 | |
Completion Report Received | 2014-03-31 | |
Construction Permit Expires | 2015-03-08 | |
Record Last Modified | 2017-02-15 |
For data sources see[1]