If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0816013307000 | | Well ID: 0816013307000 | ||
− | | style="height=100%; align=center" rowspan="14" | {{#display_map: 56. | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 56.062625, -118.086826 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/07-33-081-01W6/0 | | Location: 00/07-33-081-01W6/0 | ||
+ | |- | ||
+ | | Location Alias: 00/07-33-81-01 W6M | ||
+ | |- | ||
+ | | Location Alias 2: 00/07-33-081-01 W6/00 | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | County/Municipality: [[Municipal District of Fairview No. 136,_Alberta|Municipal District of Fairview No. 136]] | ||
|- | |- | ||
| Well Name: ANDERSON WHITELAW 7-33-81-1 | | Well Name: ANDERSON WHITELAW 7-33-81-1 | ||
+ | |- | ||
+ | | Operator Name: | ||
+ | |- | ||
+ | | License Number: 0042031 | ||
|- | |- | ||
| License Date: 1972-02-03 | | License Date: 1972-02-03 | ||
|- | |- | ||
− | | Final | + | | License Status: Suspension |
+ | |- | ||
+ | | Spud Date: 1972-02-08 | ||
+ | |- | ||
+ | | Final Drill Date: 1972-03-15 | ||
+ | |- | ||
+ | | Well Total Depth: 2275.6 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 56.062625 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -118.086826 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1976-08-01 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 878.1 | ||
+ | | style="text-align: right;" | 879.7 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1988-07-13 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 869.8 | ||
+ | | style="text-align: right;" | 871.5 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1988-07-14 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 869.8 | ||
+ | | style="text-align: right;" | 871.5 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1988-08-08 |
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 857 | ||
+ | | style="text-align: right;" | 865 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1988-08-09 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 726 | ||
+ | | style="text-align: right;" | 727.3 | ||
+ | | style="text-align: right;" | 7 | ||
|- | |- | ||
− | | | + | | 1990-05-20 |
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 714 | ||
+ | | style="text-align: right;" | 722 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1990-05-20 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 629.3 | ||
+ | | style="text-align: right;" | 630.5 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1993-08-03 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 475 | ||
+ | | style="text-align: right;" | 476 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1993-08-03 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 451 | ||
+ | | style="text-align: right;" | 452 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1993-08-05 |
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 451 | ||
+ | | style="text-align: right;" | 476 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 1993-08-08 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 451 | ||
+ | | style="text-align: right;" | 452 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" | End Date | ||
+ | !scope="col" | Chemical Name | ||
+ | !scope="col" style="text-align: right;" | CAS Number | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" style="text-align: right;" | Job Percentage | ||
+ | !scope="col" | Supplier | ||
+ | |}--> | ||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 1977 | ||
+ | | style="text-align: right;" | 922 | ||
+ | | style="text-align: right;" | 1739.1 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 2.9 | ||
+ | |- | ||
+ | | 1978 | ||
+ | | style="text-align: right;" | 8056 | ||
+ | | style="text-align: right;" | 12990.3 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 19.1 | ||
+ | |- | ||
+ | | 1979 | ||
+ | | style="text-align: right;" | 8062 | ||
+ | | style="text-align: right;" | 10611.2 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 15.3 | ||
+ | |- | ||
+ | | 1980 | ||
+ | | style="text-align: right;" | 8580 | ||
+ | | style="text-align: right;" | 11212.5 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 16.0 | ||
+ | |- | ||
+ | | 1981 | ||
+ | | style="text-align: right;" | 8756 | ||
+ | | style="text-align: right;" | 11403.9 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 16.4 | ||
+ | |- | ||
+ | | 1982 | ||
+ | | style="text-align: right;" | 8242 | ||
+ | | style="text-align: right;" | 10651.2 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 15.5 | ||
+ | |- | ||
+ | | 1983 | ||
+ | | style="text-align: right;" | 8363 | ||
+ | | style="text-align: right;" | 11547.3 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 18.3 | ||
+ | |- | ||
+ | | 1984 | ||
+ | | style="text-align: right;" | 8444 | ||
+ | | style="text-align: right;" | 11162.8 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 12.0 | ||
+ | |- | ||
+ | | 1985 | ||
+ | | style="text-align: right;" | 8458 | ||
+ | | style="text-align: right;" | 10910.7 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 15.8 | ||
+ | |- | ||
+ | | 1986 | ||
+ | | style="text-align: right;" | 8572 | ||
+ | | style="text-align: right;" | 10619.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 47.8 | ||
+ | |- | ||
+ | | 1987 | ||
+ | | style="text-align: right;" | 8369 | ||
+ | | style="text-align: right;" | 10295.4 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 47.2 | ||
+ | |- | ||
+ | | 1988 | ||
+ | | style="text-align: right;" | 3090 | ||
+ | | style="text-align: right;" | 3305.7 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 40.3 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Well Production Data - All Alberta |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2018-04-24 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2018-05-14 }}</ref> |
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0816013307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.062625,"lon":-118.086826,"icon":""}]} |
Location: 00/07-33-081-01W6/0 | |
Location Alias: 00/07-33-81-01 W6M | |
Location Alias 2: 00/07-33-081-01 W6/00 | |
Province: Alberta | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: ANDERSON WHITELAW 7-33-81-1 | |
Operator Name: | |
License Number: 0042031 | |
License Date: 1972-02-03 | |
License Status: Suspension | |
Spud Date: 1972-02-08 | |
Final Drill Date: 1972-03-15 | |
Well Total Depth: 2275.6 m | |
Surface Hole Latitude: 56.062625 | |
Surface Hole Longitude: -118.086826 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-08-01 | Perforation | 878.1 | 879.7 | 7 |
1988-07-13 | Perforation | 869.8 | 871.5 | 13 |
1988-07-14 | Acid Treatment | 869.8 | 871.5 | 0 |
1988-08-08 | Packing Device Capped w/Cement | 857 | 865 | 0 |
1988-08-09 | Perforation | 726 | 727.3 | 7 |
1990-05-20 | Packing Device Capped w/Cement | 714 | 722 | 0 |
1990-05-20 | Perforation | 629.3 | 630.5 | 13 |
1993-08-03 | Perforation | 475 | 476 | 13 |
1993-08-03 | Perforation | 451 | 452 | 13 |
1993-08-05 | Cement Squeeze | 451 | 476 | 0 |
1993-08-08 | Perforation | 451 | 452 | 13 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 922 | 1739.1 | 0.0 | 2.9 |
1978 | 8056 | 12990.3 | 0.0 | 19.1 |
1979 | 8062 | 10611.2 | 0.0 | 15.3 |
1980 | 8580 | 11212.5 | 0.0 | 16.0 |
1981 | 8756 | 11403.9 | 0.0 | 16.4 |
1982 | 8242 | 10651.2 | 0.0 | 15.5 |
1983 | 8363 | 11547.3 | 0.0 | 18.3 |
1984 | 8444 | 11162.8 | 0.0 | 12.0 |
1985 | 8458 | 10910.7 | 0.0 | 15.8 |
1986 | 8572 | 10619.0 | 0.0 | 47.8 |
1987 | 8369 | 10295.4 | 0.0 | 47.2 |
1988 | 3090 | 3305.7 | 0.0 | 40.3 |
For data sources see[4]