If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0524263409002 | | Well ID: 0524263409002 | ||
− | | style="height=100%; align=center" rowspan="14" | {{#display_map: 53. | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 53.535694, -113.741251 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/09-34-052-26W4/2 | | Location: 00/09-34-052-26W4/2 | ||
|- | |- | ||
− | | Well Name: | + | | Location Alias: 00/09-34-52-26 W4M |
+ | |- | ||
+ | | Location Alias 2: 00/09-34-052-26 W4/02 | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | County/Municipality: [[Parkland County,_Alberta|Parkland County]] | ||
+ | |- | ||
+ | | Well Name: CEDAR CREEK ACH 9-34-52-26 | ||
+ | |- | ||
+ | | Operator Name: [[Cedar Creek Energy Ltd.]] | ||
+ | |- | ||
+ | | License Number: 0003607 | ||
|- | |- | ||
| License Date: 1951-10-12 | | License Date: 1951-10-12 | ||
|- | |- | ||
− | | Final Drilling Date: 1951-11-18 | + | | License Status: Suspension |
+ | |- | ||
+ | | Spud Date: 1951-10-11 | ||
+ | |- | ||
+ | | Final Drill Date: 1951-11-18 | ||
+ | |- | ||
+ | | Well Total Depth: 1556 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 53.535694 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -113.741251 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1951-11-18 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1539.8 | ||
+ | | style="text-align: right;" | 1556 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1974-10-22 | ||
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 1546.6 | ||
+ | | style="text-align: right;" | 1550.5 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1974-10-22 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1539.8 | ||
+ | | style="text-align: right;" | 1546.6 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1975-10-02 | ||
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 1543.5 | ||
+ | | style="text-align: right;" | 1546.6 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1975-10-02 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1539.8 | ||
+ | | style="text-align: right;" | 1543.5 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1975-10-07 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1539.8 | ||
+ | | style="text-align: right;" | 1545 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1981-04-21 | ||
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 1543.3 | ||
+ | | style="text-align: right;" | 1545 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1981-04-21 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1539.8 | ||
+ | | style="text-align: right;" | 1543.3 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1983-03-12 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1515 | ||
+ | | style="text-align: right;" | 1515 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-11-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1412.5 | ||
+ | | style="text-align: right;" | 1415 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1985-11-06 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1412.5 | ||
+ | | style="text-align: right;" | 1415 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-11-07 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1412.5 | ||
+ | | style="text-align: right;" | 1415 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-11-28 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 1412.5 | ||
+ | | style="text-align: right;" | 1415 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-12-02 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1393 | ||
+ | | style="text-align: right;" | 1401 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1985-12-03 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1241 | ||
+ | | style="text-align: right;" | 1243 | ||
+ | | style="text-align: right;" | 20 | ||
+ | |- | ||
+ | | 1985-12-06 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 1241 | ||
+ | | style="text-align: right;" | 1243 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2002-11-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1243 | ||
+ | | style="text-align: right;" | 1251.6 | ||
+ | | style="text-align: right;" | 1 | ||
|- | |- | ||
− | | | + | | 2006-03-03 |
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1241 | ||
+ | | style="text-align: right;" | 1251.6 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2006-03-10 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1333.8 | ||
+ | | style="text-align: right;" | 1336.2 | ||
+ | | style="text-align: right;" | 20 | ||
|- | |- | ||
− | | | + | | 2006-03-10 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1330.1 | ||
+ | | style="text-align: right;" | 1332.3 | ||
+ | | style="text-align: right;" | 20 | ||
|- | |- | ||
− | | | + | | 2006-03-11 |
+ | | Fracture | ||
+ | | style="text-align: right;" | 1330.1 | ||
+ | | style="text-align: right;" | 1336.2 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2006-10-25 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1321 | ||
+ | | style="text-align: right;" | 1323 | ||
+ | | style="text-align: right;" | 17 | ||
|- | |- | ||
− | | | + | | 2011-07-23 |
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1312 | ||
+ | | style="text-align: right;" | 1320 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2011-07-24 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1234.7 | ||
+ | | style="text-align: right;" | 1236.6 | ||
+ | | style="text-align: right;" | 20 | ||
|- | |- | ||
+ | | 2011-07-25 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 1234.7 | ||
+ | | style="text-align: right;" | 1236.6 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" | End Date | ||
+ | !scope="col" | Chemical Name | ||
+ | !scope="col" style="text-align: right;" | CAS Number | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" style="text-align: right;" | Job Percentage | ||
+ | !scope="col" | Supplier | ||
+ | |}--> | ||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 1985 | ||
+ | | style="text-align: right;" | 288 | ||
+ | | style="text-align: right;" | 6.3 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 56.2 | ||
+ | |- | ||
+ | | 1986 | ||
+ | | style="text-align: right;" | 4616 | ||
+ | | style="text-align: right;" | 112.6 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 267.4 | ||
+ | |- | ||
+ | | 1987 | ||
+ | | style="text-align: right;" | 7972 | ||
+ | | style="text-align: right;" | 93.4 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 49.3 | ||
+ | |- | ||
+ | | 1988 | ||
+ | | style="text-align: right;" | 2271 | ||
+ | | style="text-align: right;" | 22.9 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 8.3 | ||
+ | |- | ||
+ | | 2002 | ||
+ | | style="text-align: right;" | 406 | ||
+ | | style="text-align: right;" | 1.6 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 19.0 | ||
+ | |- | ||
+ | | 2003 | ||
+ | | style="text-align: right;" | 8094 | ||
+ | | style="text-align: right;" | 51.4 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 305.6 | ||
+ | |- | ||
+ | | 2004 | ||
+ | | style="text-align: right;" | 612 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 19.9 | ||
+ | |- | ||
+ | | 2006 | ||
+ | | style="text-align: right;" | 72 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 2.2 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Well Production Data - All Alberta |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2018-04-24 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2018-05-14 }}</ref> |
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0524263409002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.535694,"lon":-113.741251,"icon":""}]} |
Location: 00/09-34-052-26W4/2 | |
Location Alias: 00/09-34-52-26 W4M | |
Location Alias 2: 00/09-34-052-26 W4/02 | |
Province: Alberta | |
County/Municipality: Parkland County | |
Well Name: CEDAR CREEK ACH 9-34-52-26 | |
Operator Name: Cedar Creek Energy Ltd. | |
License Number: 0003607 | |
License Date: 1951-10-12 | |
License Status: Suspension | |
Spud Date: 1951-10-11 | |
Final Drill Date: 1951-11-18 | |
Well Total Depth: 1556 m | |
Surface Hole Latitude: 53.535694 | |
Surface Hole Longitude: -113.741251 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-11-18 | Open Hole/Barefoot Completion | 1539.8 | 1556 | 0 |
1974-10-22 | Cement Plug | 1546.6 | 1550.5 | 0 |
1974-10-22 | Open Hole/Barefoot Completion | 1539.8 | 1546.6 | 0 |
1975-10-02 | Cement Plug | 1543.5 | 1546.6 | 0 |
1975-10-02 | Open Hole/Barefoot Completion | 1539.8 | 1543.5 | 0 |
1975-10-07 | Open Hole/Barefoot Completion | 1539.8 | 1545 | 0 |
1981-04-21 | Cement Plug | 1543.3 | 1545 | 0 |
1981-04-21 | Open Hole/Barefoot Completion | 1539.8 | 1543.3 | 0 |
1983-03-12 | Packing Device Capped w/Cement | 1515 | 1515 | 0 |
1985-11-05 | Perforation | 1412.5 | 1415 | 13 |
1985-11-06 | Acid Treatment | 1412.5 | 1415 | 0 |
1985-11-07 | Acid Treatment | 1412.5 | 1415 | 0 |
1985-11-28 | Fracture | 1412.5 | 1415 | 0 |
1985-12-02 | Packing Device Capped w/Cement | 1393 | 1401 | 0 |
1985-12-03 | Perforation | 1241 | 1243 | 20 |
1985-12-06 | Fracture | 1241 | 1243 | 0 |
2002-11-07 | Perforation | 1243 | 1251.6 | 1 |
2006-03-03 | Cement Squeeze | 1241 | 1251.6 | 0 |
2006-03-10 | Perforation | 1333.8 | 1336.2 | 20 |
2006-03-10 | Perforation | 1330.1 | 1332.3 | 20 |
2006-03-11 | Fracture | 1330.1 | 1336.2 | 0 |
2006-10-25 | Perforation | 1321 | 1323 | 17 |
2011-07-23 | Packing Device Capped w/Cement | 1312 | 1320 | 0 |
2011-07-24 | Perforation | 1234.7 | 1236.6 | 20 |
2011-07-25 | Fracture | 1234.7 | 1236.6 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 288 | 6.3 | 0.0 | 56.2 |
1986 | 4616 | 112.6 | 0.0 | 267.4 |
1987 | 7972 | 93.4 | 0.0 | 49.3 |
1988 | 2271 | 22.9 | 0.0 | 8.3 |
2002 | 406 | 1.6 | 0.0 | 19.0 |
2003 | 8094 | 51.4 | 0.0 | 305.6 |
2004 | 612 | 0.0 | 0.0 | 19.9 |
2006 | 72 | 0.0 | 0.0 | 2.2 |
For data sources see[4]