X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0665243605000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0665243605000
 
| Well ID: 0665243605000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.75813400000004094, -117.47665399999999636 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.758134, -117.476654 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/05-36-066-24W5/0
 
| Location: 00/05-36-066-24W5/0
 
|-
 
|-
| Well Name: RMP HZ ANTE 5-36-66-24
+
| Location Alias: 00/05-36-66-24 W5M
 +
|-
 +
| Location Alias 2: 00/05-36-066-24 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 066
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 24
 +
|-
 +
| Section: 36
 +
|-
 +
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 +
|-
 +
| Well Name: ENERPLUS CORP HZ ANTEN 5-36-66-24
 +
|-
 +
| Operator Name: [[Enerplus Corporation]]
 +
|-
 +
| License Number: 0464110
 
|-
 
|-
 
| License Date: 2014-01-20
 
| License Date: 2014-01-20
 
|-
 
|-
| Final Drilling Date: 2014-06-09
+
| License Status: Amended
 +
|-
 +
| Spud Date: 2014-05-23
 +
|-
 +
| Final Drill Date: 2014-06-09
 +
|-
 +
| Well Total Depth: 3620.00 m
 +
|-
 +
| Surface Hole Latitude: 54.758134
 +
|-
 +
| Surface Hole Longitude: -117.476654
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2014-01-20
 +
| Obtained License
 +
|-
 +
| 2014-05-27
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2014-05-27
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2014-05-31
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2014-05-31
 +
| Well Log Performed
 +
|-
 +
| 2014-06-02
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 2014-06-09
 +
| Finished Drilling
 +
|-
 +
| 2014-06-09
 +
| Well Log Performed
 +
|-
 +
| 2014-06-09
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2014-06-10
 +
| Liner Casing Operation Performed
 +
|-
 +
| 2014-06-11
 +
| Rig Released
 +
|-
 +
| 2014-06-26
 +
| Well Log Performed
 +
|-
 +
| 2014-06-28
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2014-06-28
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2014-07-05
 +
| Well Began Production
 +
|-
 +
| 2014-07-05
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2014-07-05
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2015-04-06
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2015-04-06
 +
| Well Mode changed to Gas Lift
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
| 2014-05-23
 +
| [[Excalibur Drilling Ltd.]]
 +
| style="text-align: right;" | 7
 +
| style="text-align: right;" | N/A
 +
| Drill To LD
 
|-
 
|-
| Total Depth: 3620.0m
+
|}
 +
For data sources see<ref>{{cite web
 +
| title =ST49: Daily Spud and Drilling Activity List
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-30
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-09 }}</ref>
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2014-05-27
 +
| style="text-align: right;" | 730.00
 +
| Deviate (5 - 79 degrees)
 
|-
 
|-
| Status: Flowing
+
| 2014-05-31
 +
| style="text-align: right;" | 2133.00
 +
| Horizontal
 
|-
 
|-
| Well Type: Not Applicable
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2014-06-28
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 3615.00
 +
| style="text-align: right;" | 3620.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Horizontal
+
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3593.50
 +
| style="text-align: right;" | 3593.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3528.30
 +
| style="text-align: right;" | 3528.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3458.90
 +
| style="text-align: right;" | 3459.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3404.20
 +
| style="text-align: right;" | 3404.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3335.40
 +
| style="text-align: right;" | 3335.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3277.10
 +
| style="text-align: right;" | 3277.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3192.20
 +
| style="text-align: right;" | 3192.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3147.40
 +
| style="text-align: right;" | 3147.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3089.30
 +
| style="text-align: right;" | 3089.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3017.80
 +
| style="text-align: right;" | 3017.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2946.20
 +
| style="text-align: right;" | 2946.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2901.20
 +
| style="text-align: right;" | 2901.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2831.50
 +
| style="text-align: right;" | 2831.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2774.20
 +
| style="text-align: right;" | 2774.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2702.90
 +
| style="text-align: right;" | 2703.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2645.00
 +
| style="text-align: right;" | 2645.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2586.80
 +
| style="text-align: right;" | 2586.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2516.20
 +
| style="text-align: right;" | 2516.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2458.30
 +
| style="text-align: right;" | 2458.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2388.10
 +
| style="text-align: right;" | 2388.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2329.90
 +
| style="text-align: right;" | 2330.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2273.50
 +
| style="text-align: right;" | 2273.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-06-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2202.50
 +
| style="text-align: right;" | 2202.60
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2014-06-28
 +
| 2014-06-28
 +
| style="text-align: right;" | 1,963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="15"| 1
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| Oil
 +
| 64742-81-0
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 61.8418
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 20/40 Sand
 +
| rowspan="1"| Calfrac
 +
| rowspan="1"|
 +
| Crystalline silica (Quartz)
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 29.9004
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| DHP-202
 +
| rowspan="3"| Calfrac
 +
| rowspan="3"| Activator
 +
| Non-Hazardous Ingredients
 +
| Trade Secret
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.5578
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Sulfuric acid
 +
| 7664-93-9
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.5877
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Sulfuric acid. iron(2+) salt (1:?)
 +
| 16547-58-3
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.5578
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="6"| DHP-903
 +
| rowspan="6"| Calfrac
 +
| rowspan="6"| Breaker
 +
| 1-Hexanol. 2-ethyl-
 +
| 104-76-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.3558
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Ethanol. 2.2'-iminobis-
 +
| 111-42-2
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.3776
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Fatty Amine #1
 +
| 8842
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.3385
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Fatty Amine #2
 +
| 8842
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.3385
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Magnesium oxide (MgO)
 +
| 1309-48-4
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.3419
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Non-Hazardous Ingredients
 +
| Trade Secret
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.3394
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Nitrogen
 +
| rowspan="1"| Calfrac
 +
| rowspan="1"| Energizing Fluid
 +
| Nitrogen
 +
| 7727-37-9
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 8.0646
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| DHP-201
 +
| rowspan="3"| Calfrac
 +
| rowspan="3"| Gelling Agent
 +
| 1-Decanol
 +
| 112-30-1
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.7032
 +
| style="text-align: right;" | N/A
 +
|-
 +
| 1-Octanol
 +
| 111-87-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.7032
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Phosphoric acid. mixed decyl and Et and octyl esters
 +
| 68412-60-2
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.6735
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Hydraulic Fracturing Water Use Data (Annual)
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-05-05
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-10 }}</ref>
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 3870
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 7890
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8522
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8657
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8243
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 7701
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2103
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
| Latitude: 54.75813400000004094
+
| 2014-06-11
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 
|-
 
|-
| Longitude: -117.47665399999999636
+
| 2014-07-11
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 
|-
 
|-
 
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]
 +
[[Category:FracFocus]]

Revision as of 05:20, 11 July 2020

Well Details

Well ID: 0665243605000
Loading map...
Location: 00/05-36-066-24W5/0
Location Alias: 00/05-36-66-24 W5M
Location Alias 2: 00/05-36-066-24 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 24
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: ENERPLUS CORP HZ ANTEN 5-36-66-24
Operator Name: Enerplus Corporation
License Number: 0464110
License Date: 2014-01-20
License Status: Amended
Spud Date: 2014-05-23
Final Drill Date: 2014-06-09
Well Total Depth: 3620.00 m
Surface Hole Latitude: 54.758134
Surface Hole Longitude: -117.476654

For data sources see[1][2]

Well History

Date Event
2014-01-20 Obtained License
2014-05-27 Direction Drilling Operation Performed - Deviate
2014-05-27 Surface Casing Operation Performed
2014-05-31 Direction Drilling Operation Performed - Horizontal
2014-05-31 Well Log Performed
2014-06-02 Intermediate Casing Operation Performed
2014-06-09 Finished Drilling
2014-06-09 Well Log Performed
2014-06-09 Well Mode changed to Drilled and Cased
2014-06-10 Liner Casing Operation Performed
2014-06-11 Rig Released
2014-06-26 Well Log Performed
2014-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-28 Perforation Treatment Performed - Open-Hole Completion
2014-07-05 Well Began Production
2014-07-05 Well Fluid changed to Crude Oil
2014-07-05 Well Mode changed to Flowing
2015-04-06 Well Fluid changed to Crude Oil
2015-04-06 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-05-23 Excalibur Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-05-27 730.00 Deviate (5 - 79 degrees)
2014-05-31 2133.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-06-28 Open Hole/Barefoot Completion 3615.00 3620.00 0
2014-06-28 Multi-Stage Fracture 3593.50 3593.60 0
2014-06-28 Multi-Stage Fracture 3528.30 3528.40 0
2014-06-28 Multi-Stage Fracture 3458.90 3459.00 0
2014-06-28 Multi-Stage Fracture 3404.20 3404.30 0
2014-06-28 Multi-Stage Fracture 3335.40 3335.50 0
2014-06-28 Multi-Stage Fracture 3277.10 3277.20 0
2014-06-28 Multi-Stage Fracture 3192.20 3192.30 0
2014-06-28 Multi-Stage Fracture 3147.40 3147.50 0
2014-06-28 Multi-Stage Fracture 3089.30 3089.40 0
2014-06-28 Multi-Stage Fracture 3017.80 3017.90 0
2014-06-28 Multi-Stage Fracture 2946.20 2946.30 0
2014-06-28 Multi-Stage Fracture 2901.20 2901.30 0
2014-06-28 Multi-Stage Fracture 2831.50 2831.60 0
2014-06-28 Multi-Stage Fracture 2774.20 2774.30 0
2014-06-28 Multi-Stage Fracture 2702.90 2703.00 0
2014-06-28 Multi-Stage Fracture 2645.00 2645.10 0
2014-06-28 Multi-Stage Fracture 2586.80 2586.90 0
2014-06-28 Multi-Stage Fracture 2516.20 2516.30 0
2014-06-28 Multi-Stage Fracture 2458.30 2458.40 0
2014-06-28 Multi-Stage Fracture 2388.10 2388.20 0
2014-06-28 Multi-Stage Fracture 2329.90 2330.00 0
2014-06-28 Multi-Stage Fracture 2273.50 2273.60 0
2014-06-28 Multi-Stage Fracture 2202.50 2202.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-28 2014-06-28 1,963 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Oil 64742-81-0 100 61.8418 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 29.9004 N/A
DHP-202 Calfrac Activator Non-Hazardous Ingredients Trade Secret 100 0.5578 N/A
Sulfuric acid 7664-93-9 100 0.5877 N/A
Sulfuric acid. iron(2+) salt (1:?) 16547-58-3 100 0.5578 N/A
DHP-903 Calfrac Breaker 1-Hexanol. 2-ethyl- 104-76-7 100 0.3558 N/A
Ethanol. 2.2'-iminobis- 111-42-2 100 0.3776 N/A
Fatty Amine #1 8842 100 0.3385 N/A
Fatty Amine #2 8842 100 0.3385 N/A
Magnesium oxide (MgO) 1309-48-4 100 0.3419 N/A
Non-Hazardous Ingredients Trade Secret 100 0.3394 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 8.0646 N/A
DHP-201 Calfrac Gelling Agent 1-Decanol 112-30-1 100 0.7032 N/A
1-Octanol 111-87-5 100 0.7032 N/A
Phosphoric acid. mixed decyl and Et and octyl esters 68412-60-2 100 0.6735 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3870 0.0 0.0 0.0
2015 7890 0.0 0.0 0.0
2016 8522 0.0 0.0 0.0
2017 8657 0.0 0.0 0.0
2018 8243 0.0 0.0 0.0
2019 7701 0.0 0.0 0.0
2020 2103 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-06-11 No Incident Encountered 0.00 0.00
2014-07-11 No Incident Encountered 0.00 0.00

For data sources see[9]

References