X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0564032010040"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0564032010040
 
| Well ID: 0564032010040
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.85613800000004403, -110.40696900000000369 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.856138, -110.406969 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 04/10-20-056-03W4/0
 
| Location: 04/10-20-056-03W4/0
 
|-
 
|-
| Well Name: TBE 10A FROG LK 10-20-56-3
+
| Location Alias: 04/10-20-56-03 W4M
 +
|-
 +
| Location Alias 2: 04/10-20-056-03 W4/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[County of St. Paul No. 19,_Alberta|County of St. Paul No. 19]]
 +
|-
 +
| Well Name: WLEC 10A FROG LK 10-20-56-3
 +
|-
 +
| Operator Name: [[West Lake Energy Corp.]]
 +
|-
 +
| License Number: 0426249
 
|-
 
|-
 
| License Date: 2010-11-24
 
| License Date: 2010-11-24
 
|-
 
|-
| Final Drilling Date: 2011-01-28
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 615.0m
+
| Spud Date: 2011-01-19
 
|-
 
|-
| Fluid Type: Crude Bitumen
+
| Final Drill Date: 2011-01-28
 
|-
 
|-
| Status: Pumping
+
| Well Total Depth: 615 m
 +
|-
 +
| Surface Hole Latitude: 53.856138
 +
|-
 +
| Surface Hole Longitude: -110.406969
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Well Type: Not Applicable
+
|}-->
 +
 
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Configuration: Vertical
+
| 2011-01-28
 +
| style="text-align: right;" | 105
 +
 
 
|-
 
|-
| Latitude: 53.85613800000004403
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
| Longitude: -110.40696900000000369
+
| 2011-02-10
 +
| Cement Plug
 +
| style="text-align: right;" | 591
 +
| style="text-align: right;" | 594
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011-02-10
 +
| Perforation
 +
| style="text-align: right;" | 531.5
 +
| style="text-align: right;" | 533.5
 +
| style="text-align: right;" | 26
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 7799
 +
| style="text-align: right;" | 66.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 961.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8707
 +
| style="text-align: right;" | 89.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 782.5
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 162.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1132.3
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8682
 +
| style="text-align: right;" | 277.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2450.8
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8752
 +
| style="text-align: right;" | 539.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2746.3
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8651
 +
| style="text-align: right;" | 535.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2623.7
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8741
 +
| style="text-align: right;" | 457.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2863.4
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8536
 +
| style="text-align: right;" | 386.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2370.8
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 2155
 +
| style="text-align: right;" | 182.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 651.4
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 11:44, 9 June 2019

Well Details

Well ID: 0564032010040
Loading map...
Location: 04/10-20-056-03W4/0
Location Alias: 04/10-20-56-03 W4M
Location Alias 2: 04/10-20-056-03 W4/00
Province: Alberta
County/Municipality: County of St. Paul No. 19
Well Name: WLEC 10A FROG LK 10-20-56-3
Operator Name: West Lake Energy Corp.
License Number: 0426249
License Date: 2010-11-24
License Status: Issued
Spud Date: 2011-01-19
Final Drill Date: 2011-01-28
Well Total Depth: 615 m
Surface Hole Latitude: 53.856138
Surface Hole Longitude: -110.406969

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2011-01-28 105

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-10 Cement Plug 591 594 0
2011-02-10 Perforation 531.5 533.5 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7799 66.3 0.0 961.0
2012 8707 89.5 0.0 782.5
2013 8759 162.1 0.0 1132.3
2014 8682 277.5 0.0 2450.8
2015 8752 539.0 0.0 2746.3
2016 8651 535.2 0.0 2623.7
2017 8741 457.3 0.0 2863.4
2018 8536 386.0 0.0 2370.8
2019 2155 182.1 0.0 651.4

For data sources see[5]

References