X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0524250403022"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0524250403022
 
| Well ID: 0524250403022
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.455824, -113.630624 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.455824, -113.630624 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/03-04-052-25W4/2
 
| Location: 02/03-04-052-25W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/03-04-052-25 W4/02
 
| Location Alias 2: 02/03-04-052-25 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 052
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 04
 
|-
 
|-
 
| County/Municipality: [[Edmonton,_Alberta|Edmonton]]
 
| County/Municipality: [[Edmonton,_Alberta|Edmonton]]
Line 17: Line 27:
 
| Well Name: TIDEWATER ARM 3-4-52-25
 
| Well Name: TIDEWATER ARM 3-4-52-25
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Tidewater Midstream and Infrastructure Ltd.]]
 
|-
 
|-
 
| License Number: 0082810
 
| License Number: 0082810
Line 29: Line 39:
 
| Final Drill Date: 1980-06-29
 
| Final Drill Date: 1980-06-29
 
|-
 
|-
| Well Total Depth: 1769 m
+
| Well Total Depth: 1769.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.455824
 
| Surface Hole Latitude: 53.455824
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1980-05-14
 +
| Obtained License
 +
|-
 +
| 1980-06-29
 +
| Finished Drilling
 +
|-
 +
| 1980-07-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-07-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 1980-07-19
 +
| Well Log Performed
 +
|-
 +
| 1981-01-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-01-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-01-15
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1981-01-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-01-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1981-01-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-11-26
 +
| Well Log Performed
 +
|-
 +
| 1998-06-29
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2001-08-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-11-22
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2001-11-22
 +
| Plug Back Performed
 +
|-
 +
| 2001-11-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-12-02
 +
| Well Began Production
 +
|-
 +
| 2001-12-02
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2001-12-02
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2008-10-28
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2008-10-28
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2017-03-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2017-03-07
 +
| Plug Back Performed
 +
|-
 +
| 2017-03-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2017-03-08
 +
| Plug Back Performed
 +
|-
 +
| 2017-03-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2017-03-09
 +
| Plug Back Performed
 +
|-
 +
| 2017-03-09
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2017-03-09
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2017-06-08
 +
| Well Abandoned
 +
|-
 +
| 2017-06-08
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2017-06-08
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 198:
 
| 1981-01-07
 
| 1981-01-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1231
+
| style="text-align: right;" | 1231.00
| style="text-align: right;" | 1234
+
| style="text-align: right;" | 1234.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1981-01-13
 
| 1981-01-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1199
+
| style="text-align: right;" | 1199.00
| style="text-align: right;" | 1201
+
| style="text-align: right;" | 1201.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1981-01-15
 
| 1981-01-15
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1199
+
| style="text-align: right;" | 1199.00
| style="text-align: right;" | 1201
+
| style="text-align: right;" | 1201.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-01-18
 
| 1981-01-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1166.8
+
| style="text-align: right;" | 1166.80
| style="text-align: right;" | 1170
+
| style="text-align: right;" | 1170.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1981-01-20
 
| 1981-01-20
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1166.8
+
| style="text-align: right;" | 1166.80
| style="text-align: right;" | 1170
+
| style="text-align: right;" | 1170.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-01-21
 
| 1981-01-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1010.5
+
| style="text-align: right;" | 1010.50
| style="text-align: right;" | 1011.5
+
| style="text-align: right;" | 1011.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2001-08-20
 
| 2001-08-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1010
+
| style="text-align: right;" | 1010.00
| style="text-align: right;" | 1012
+
| style="text-align: right;" | 1012.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-11-22
 
| 2001-11-22
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1010
+
| style="text-align: right;" | 1010.00
| style="text-align: right;" | 1012
+
| style="text-align: right;" | 1012.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-11-30
 
| 2001-11-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1231
+
| style="text-align: right;" | 1231.00
| style="text-align: right;" | 1234
+
| style="text-align: right;" | 1234.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2017-03-07
 
| 2017-03-07
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1211
+
| style="text-align: right;" | 1211.00
| style="text-align: right;" | 1219
+
| style="text-align: right;" | 1219.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-03-08
 
| 2017-03-08
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1154
+
| style="text-align: right;" | 1154.00
| style="text-align: right;" | 1162
+
| style="text-align: right;" | 1162.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-03-09
 
| 2017-03-09
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 902
+
| style="text-align: right;" | 902.00
| style="text-align: right;" | 1000
+
| style="text-align: right;" | 1000.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 148: Line 272:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 181: Line 319:
 
| 2001
 
| 2001
 
| style="text-align: right;" | 941
 
| style="text-align: right;" | 941
| style="text-align: right;" | 251.3
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 187: Line 325:
 
| 2002
 
| 2002
 
| style="text-align: right;" | 8023
 
| style="text-align: right;" | 8023
| style="text-align: right;" | 9435.9
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 193: Line 331:
 
| 2003
 
| 2003
 
| style="text-align: right;" | 6981
 
| style="text-align: right;" | 6981
| style="text-align: right;" | 4833.8
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 199: Line 337:
 
| 2004
 
| 2004
 
| style="text-align: right;" | 8730
 
| style="text-align: right;" | 8730
| style="text-align: right;" | 2726.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 205: Line 343:
 
| 2005
 
| 2005
 
| style="text-align: right;" | 6022
 
| style="text-align: right;" | 6022
| style="text-align: right;" | 875.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 211: Line 349:
 
| 2006
 
| 2006
 
| style="text-align: right;" | 1254
 
| style="text-align: right;" | 1254
| style="text-align: right;" | 12.8
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 219: Line 357:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 230: Line 368:
 
|-
 
|-
 
| 2017-03-10
 
| 2017-03-10
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 238: Line 376:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 15:15, 13 July 2020

Well Details

Well ID: 0524250403022
Loading map...
Location: 02/03-04-052-25W4/2
Location Alias: 02/03-04-52-25 W4M
Location Alias 2: 02/03-04-052-25 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 25
Section: 04
County/Municipality: Edmonton
Well Name: TIDEWATER ARM 3-4-52-25
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0082810
License Date: 1980-05-14
License Status: Abandoned
Spud Date: 1980-06-17
Final Drill Date: 1980-06-29
Well Total Depth: 1769.00 m
Surface Hole Latitude: 53.455824
Surface Hole Longitude: -113.630624

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-14 Obtained License
1980-06-29 Finished Drilling
1980-07-02 Drill Stem Test Performed
1980-07-04 Production Casing Operation Performed
1980-07-19 Well Log Performed
1981-01-07 Perforation Treatment Performed - Jet Perforation
1981-01-13 Perforation Treatment Performed - Jet Perforation
1981-01-15 Perforation Treatment Performed - Cement Squeeze
1981-01-18 Perforation Treatment Performed - Jet Perforation
1981-01-20 Perforation Treatment Performed - Cement Squeeze
1981-01-21 Perforation Treatment Performed - Jet Perforation
1987-11-26 Well Log Performed
1998-06-29 Well Mode changed to Drilled and Cased
2001-08-20 Perforation Treatment Performed - Jet Perforation
2001-11-22 Perforation Treatment Performed - Cement Squeeze
2001-11-22 Plug Back Performed
2001-11-30 Perforation Treatment Performed - Jet Perforation
2001-12-02 Well Began Production
2001-12-02 Well Fluid changed to Gas
2001-12-02 Well Mode changed to Flowing
2008-10-28 Well Fluid changed to Gas
2008-10-28 Well Mode changed to Suspended
2017-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-07 Plug Back Performed
2017-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-08 Plug Back Performed
2017-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-09 Plug Back Performed
2017-03-09 Well Fluid changed to Gas
2017-03-09 Well Mode changed to Abandoned Zone
2017-06-08 Well Abandoned
2017-06-08 Well Fluid changed to Gas
2017-06-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-07 Perforation 1231.00 1234.00 13
1981-01-13 Perforation 1199.00 1201.00 13
1981-01-15 Cement Squeeze 1199.00 1201.00 0
1981-01-18 Perforation 1166.80 1170.00 13
1981-01-20 Cement Squeeze 1166.80 1170.00 0
1981-01-21 Perforation 1010.50 1011.50 13
2001-08-20 Perforation 1010.00 1012.00 17
2001-11-22 Cement Squeeze 1010.00 1012.00 0
2001-11-30 Perforation 1231.00 1234.00 13
2017-03-07 Packing Device Capped w/Cement 1211.00 1219.00 0
2017-03-08 Packing Device Capped w/Cement 1154.00 1162.00 0
2017-03-09 Packing Device Capped w/Cement 902.00 1000.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 941 0.0 0.0 0.0
2002 8023 0.0 0.0 0.0
2003 6981 0.0 0.0 0.0
2004 8730 0.0 0.0 0.0
2005 6022 0.0 0.0 0.0
2006 1254 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References