X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-21982"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-21982
 
| Well ID: 37-003-21982
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.572277, -79.807055 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.572278, -79.807056 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Allegheny County, Pennsylvania|Allegheny]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Frazer Township, Allegheny County, Pennsylvania|Frazer Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Frazer Township,_Allegheny_County,_Pennsylvania|Frazer Township]]
 
|-
 
|-
 
| Operator Name: [[RANGE RESOURCES APPALACHIA LLC]]
 
| Operator Name: [[RANGE RESOURCES APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[146376|146376]]
+
| Well Pad ID: [[146376]]
 
|-
 
|-
 
| Farm/Lease Name: YUTE UNIT 4H
 
| Farm/Lease Name: YUTE UNIT 4H
 
|-
 
|-
| First Permit Date: 2008-10-03
+
| License Status: Active
|-
 
| Last Permit Date: 2009-11-03
 
|-
 
| Spud Date: 2009-02-03
 
|-
 
| Unconventional: Yes
 
 
|-
 
|-
| Configuration: Horizontal
+
| Spud Date: 02/03/2009
 
|-
 
|-
| Well Status: ACTIVE
+
| Permit Date: 10/3/2008
 
|-
 
|-
| Violations: 0
+
| Unconventional Well: Y
 
|-
 
|-
| Latitude: 40.572277
+
| Configuration: Horizontal Well
 
|-
 
|-
| Longitude: -79.807055
+
| Latitude: 40.572278
 
|-
 
|-
 +
| Longitude: -79.807056
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2008-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2009-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 583550.0
 
| style="text-align:right;" | 81.0
 
| style="text-align:right;" | 10.0
 
| style="text-align:right;" | 81.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-1
 
| style="text-align:right;" | 461773.93
 
| style="text-align:right;" | 165.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-2
 
| style="text-align:right;" | 322642.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-1
 
| style="text-align:right;" | 190773.76
 
| style="text-align:right;" | 154.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-2
 
| style="text-align:right;" | 435048.62
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-1
 
| style="text-align:right;" | 187873.67
 
| style="text-align:right;" | 180.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-2
 
| style="text-align:right;" | 153123.3
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 21470.1
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 24359.29
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 23301.46
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 16-Jan
 
| style="text-align:right;" | 18470.98
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15-Aug
 
| style="text-align:right;" | 22177.44
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15DECU
 
| style="text-align:right;" | 20306.2
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15JULU
 
| style="text-align:right;" | 22340.65
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15MAYU
 
| style="text-align:right;" | 21740.37
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15OCTU
 
| style="text-align:right;" | 21246.44
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15OCTU
 
| style="text-align:right;" | 21246.44
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15SEPU
 
| style="text-align:right;" | 20685.89
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 16APRU
 
| style="text-align:right;" | 14387.75
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 16FEBU
 
| style="text-align:right;" | 16153.05
 
| style="text-align:right;" | 29.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 16MARU
 
| style="text-align:right;" | 15419.52
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2008-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2009-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-1
 
| style="text-align:right;" | 461773.93
 
| style="text-align:right;" | 165.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-1
 
| style="text-align:right;" | 190773.76
 
| style="text-align:right;" | 154.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-2
 
| style="text-align:right;" | 322642.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-2
 
| style="text-align:right;" | 435048.62
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 583550.0
 
| style="text-align:right;" | 81.0
 
| style="text-align:right;" | 10.0
 
| style="text-align:right;" | 81.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-1
 
| style="text-align:right;" | 187873.67
 
| style="text-align:right;" | 180.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-2
 
| style="text-align:right;" | 153123.3
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 21470.1
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-11
 
| style="text-align:right;" | 20355.71
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-04
 
| style="text-align:right;" | 21746.39
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-06
 
| style="text-align:right;" | 22600.28
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-09
 
| style="text-align:right;" | 20685.89
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-08
 
| style="text-align:right;" | 22177.44
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-12
 
| style="text-align:right;" | 20306.2
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 24359.29
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-07
 
| style="text-align:right;" | 22340.65
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 23301.46
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-05
 
| style="text-align:right;" | 21740.37
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-10
 
| style="text-align:right;" | 21246.44
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-08
 
| style="text-align:right;" | 11728.66
 
| style="text-align:right;" | 21.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-07
 
| style="text-align:right;" | 15631.52
 
| style="text-align:right;" | 26.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-05
 
| style="text-align:right;" | 13923.18
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-11
 
| style="text-align:right;" | 13202.89
 
| style="text-align:right;" | 29.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-02
 
| style="text-align:right;" | 16153.05
 
| style="text-align:right;" | 29.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-12
 
| style="text-align:right;" | 13891.58
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-04
 
| style="text-align:right;" | 14387.75
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-09
 
| style="text-align:right;" | 15758.31
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-06
 
| style="text-align:right;" | 16190.89
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-01
 
| style="text-align:right;" | 18470.98
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-03
 
| style="text-align:right;" | 15419.52
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-10
 
| style="text-align:right;" | 12580.34
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-02
 
| style="text-align:right;" | 10220.29
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-01
 
| style="text-align:right;" | 13048.38
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-09
 
| style="text-align:right;" | 14660.53
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-06
 
| style="text-align:right;" | 12127.34
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-11
 
| style="text-align:right;" | 15203.91
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-04
 
| style="text-align:right;" | 10838.29
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-08
 
| style="text-align:right;" | 12425.74
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-12
 
| style="text-align:right;" | 14893.03
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-07
 
| style="text-align:right;" | 12861.01
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-03
 
| style="text-align:right;" | 10953.47
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-05
 
| style="text-align:right;" | 11658.58
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-10
 
| style="text-align:right;" | 15307.53
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-08
 
| style="text-align:right;" | 3579.24
 
| style="text-align:right;" | 8.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-11
 
| style="text-align:right;" | 12420.6
 
| style="text-align:right;" | 19.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-02
 
| style="text-align:right;" | 11856.51
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-12
 
| style="text-align:right;" | 14132.43
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-04
 
| style="text-align:right;" | 14433.06
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-06
 
| style="text-align:right;" | 16548.75
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-01
 
| style="text-align:right;" | 11594.43
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 2018-07
+
| 2008
| style="text-align:right;" | 17024.33
+
| style="text-align: right;" |
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2009
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2018-03
+
| 2010
| style="text-align:right;" | 12798.86
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 583,550.00
 +
| style="text-align: right;" | 81
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 81
 
|-
 
|-
| 2018-05
+
| 2012
| style="text-align:right;" | 14569.78
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 784,415.93
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 349
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 625,822.38
 +
| style="text-align: right;" | 338
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-10
+
| 2014
| style="text-align:right;" | 0.0
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 340,996.97
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 364
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 262,330.22
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-09
+
| 2016
| style="text-align:right;" | 0.0
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 177,338.67
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 346
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| style="text-align: right;" | 154,198.10
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2019-02
+
| 2018
| style="text-align:right;" | 14014.59
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 128,957.99
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 269
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2019
| 2019-01
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align:right;" | 14963.93
+
| style="text-align: right;" | 45,197.97
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
|-
 
|-
 
| 2019-03
 
| style="text-align:right;" | 16219.45
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | DATE
 
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
|-
 
| 1785102
 
| 2009-04-16
 
| No Violations Noted
 
| The marcellus well is not in production at the time of the inspection. The initial phase of drilling (top hole) appears to be completed.  The below grade pit has been properly installed and is maintaining the 2 feet of freeboard.  There is no accelerated erosion and sedimentation noted on the access road or well site.  It is recommended that the operator seed and mulch the well site and continue to monitor the access road and well site for erosion and sedimentation.  Accompanied Greg Higgins for training.
 
|
 
|
 
|
 
|-
 
|-
 
| 1785668
 
| 2009-04-09
 
| No Violations Noted
 
| Marcellus Well, verticle to 7105, e/s ok
 
|
 
|
 
|
 
|-
 
|-
 
| 1803413
 
| 2009-06-08
 
| No Violations Noted
 
| Drilling was completed on 2/18/09
 
Well is not in production at this time.
 
Site is being restored at this time and vegetation is starting to grow.
 
The pad and the road have been stabilized with stone and the BMP﾿s are in order.
 
At the time of the routine inspection, the operator was encapsulating the pit.
 
Spoke with operator and they do not know when they will be fracing and the Department notified them that they might need an extension.
 
 
 
 
 
|
 
|
 
|
 
|-
 
|-
 
| 1894331
 
| 2010-06-23
 
| No Violations Noted
 
| On June 23rd, 2010 I met with Range Resources E&S Supervisor Jeremy Matinko to discuss the encapsulated drill cuttings on site. Due to expansion of the dril pad the pit would need to be uncovered and the drill cuttings moved.  It was decided that when uncovered the previous drill cuttings would be hauled and disposed of offsite.  The site was currently under construction.  E&S controls were in place according to the most recent ESCGP-1.  The access road was in good condition. A site ID and E&S plan were posted on site.
 
|
 
|
 
|
 
|-
 
|-
 
| 1911499
 
| 2010-08-12
 
| No Violations Noted
 
| On August 12th, 2010 I conducted a routine inspection of the above site.  Frazer township had received 4.41" of rain the previous night.  Some gravel from the access road had been washed onto the public roadway. Due to the large amount of rain, various portions of the E&S controls needed repair.  No sediment was leaving site however.  The super silt fence at the front of the site surrounding the top soil piles was becoming overtaken.  Portions of filter sock inside the silt fence were undermined and sediment was piling up.  The interceptor channels at the rear of the pad were damaged.  Erosion blanket had slid off the fill slope and into the sediment trap.  The sediment trap also was filling and needed cleaned.  Arrangements were made to meet the operator the next morning and a street sweeper was dispatched to the site.
 
|
 
|
 
|
 
|-
 
|-
 
| 1911504
 
| 2010-08-13
 
| No Violations Noted
 
| On August 13th, 2010 I met with Range Resources representatives Jeremy Matinko on site to discuss repairs needed noted in the 8/12/2010 inspection.  A street sweeper was on site the night before and had cleaned the public roadway.  Silt fence and filter sock repairs were taking place immediately.  The other repairs would be scheduled as soon as the soil would become dry enough for heavy equipment to work on.
 
|
 
|
 
|
 
|-
 
|-
 
| 1913729
 
| 2010-08-31
 
| No Violations Noted
 
| On August 31th, 2010 I met with Range Resources representative Jeremy Matinko on site to discuss repairs as a result of the storm event noted in the 8/12/2010 inspection.  The sediment trap and interceptor channels had been restored to plan specifications.  The silt fence had been repaired and other sections have had the sediment piled against it removed.  Additional filter sock and rock filters have been added to the site in several locations.  The access road was now in good condition.
 
|
 
|
 
|
 
|-
 
|-
 
| 1917078
 
| 2010-09-10
 
| No Violations Noted
 
| On September 10th, 2010 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  A wireline rig was set up on the well and crews were setting up to pull the 4-1/2" casing in preparation for the redrill.
 
|
 
|
 
|
 
|-
 
|-
 
| 1927871
 
| 2010-10-25
 
| No Violations Noted
 
| MARCELLUS WELL. DRILLED TO 7300' AND CEMENTED BACK TO KOP. PATTERSON RIG IS BEING BUILT. SITE, E&S, AND ACCESS OK.
 
|
 
|
 
|
 
|-
 
|-
 
| 1930577
 
| 2010-11-02
 
| No Violations Noted
 
| PATTERSON 325 IS DRILLING THIS HORIZONTAL MARCELLUS WELL. SITE WILL BE EXPANDED FOR FRAC TANKS.
 
|
 
|
 
|
 
|-
 
|-
 
| 1930583
 
| 2010-11-04
 
| No Violations Noted
 
| PATTERSON RIG 325 DRILLING HORIZONTAL LEG OF THIS MARCELLUS WELL. KOP @ 5833'. T.D. @ 9850'. CREW PULLING DRILL RODS AND THEN WILL RUN 5 1/2" CASING. SITE, E&S, AND ACCESS, OK.
 
|
 
|
 
|
 
|-
 
|-
 
| 1931252
 
| 2010-11-17
 
| No Violations Noted
 
| On November 17th, 2010 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  The redrill had been completed.  Construction for the tank pad was completed and frac tanks were being delivered. Crews were on site prepping for the upcoming frac.
 
|
 
|
 
|
 
|-
 
|-
 
| 1933219
 
| 2010-11-16
 
| No Violations Noted
 
| MARCELLUS HOIZONTAL WELL. PATTERSON RIG IS GONE. CREW WORKING ON THE WELL HEAD. AREA FOR FRAC TANKS UNDER CONSTRUCTION.
 
|
 
|
 
|
 
|-
 
|-
 
| 1933225
 
| 2010-11-10
 
| No Violations Noted
 
| 5" IS CEMENTED. RIG IS BEING DISMANTLED. THE SITE IS BEING PREPARED FOR FRAC.
 
|
 
|
 
|
 
|-
 
|-
 
| 1934239
 
| 2010-11-29
 
| No Violations Noted
 
| FRAC TECH ON SITE SETTING UPTO FRAC THIS HORIZONTAL MARCELLUS WELL.
 
FRAC TANKS ARE SET AND WATER IS SUPPLIED FROM A HYDRANT.
 
SITE, E&S, AND ACCESS, OK.
 
|
 
|
 
|
 
|-
 
|-
 
| 1947185
 
| 2011-01-10
 
| No Violations Noted
 
| SITE, E&S, AND ACCESS, OK. MARCELLUS WELL IS BEING FLARED. SITE IS FENCED AND SECURITY IS PRESENT.
 
|
 
|
 
|
 
|-
 
|-
 
| 1953924
 
| 2011-01-18
 
| No Violations Noted
 
| WELL IS COMPLETE. THE FLARESTACK HAS BEEN REMOVED.
 
|
 
|
 
|
 
|-
 
|-
 
| 1958587
 
| 2011-02-10
 
| No Violations Noted
 
| On February 10th, 2011 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  Some routine maintenance of E&S controls is required in a few areas.  The redrill and frac had been completed.  No spills/ leaks or accelerated erosion were observed at the time of inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| 1959388
 
| 2011-03-02
 
| No Violations Noted
 
| On March 2nd, 2011 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  Some routine maintenance of E&S controls is required in a few areas: silt fence and control blankets along the tank pad. The redrill and frac had been completed.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  .
 
|
 
|
 
|
 
|-
 
|-
 
| 1961862
 
| 2011-03-18
 
| No Violations Noted
 
| On March 18th, 2011 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  2 frac tanks were left on site.  The redrill and frac had been completed, but the well was not yet in production.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  .
 
|
 
|
 
|
 
|-
 
|-
 
| 1976478
 
| 2011-04-20
 
| No Violations Noted
 
| THIS MARCELLUS WELL IS DRILLED AND FRACED, BUT NOT
 
HOOKED UP FOR PRODUCTION.
 
SITE AND E&S, OK.
 
|
 
|
 
|
 
|-
 
|-
 
| 1991679
 
| 2011-07-08
 
| No Violations Noted
 
| WELL IS COMPLETE. SITE AND E&S, OK. ACCESS IS GATED. SITE WILL BE CHANGED FOR MORE WELLS.
 
|
 
|
 
|
 
|-
 
|-
 
| 1998348
 
| 2011-08-04
 
| No Violations Noted
 
| WELLCOMPLETE. THE SITE IS BEING REBUILT TO ADD MORE WELLS.
 
SITE, E&S, AND ACCESS,OK.
 
|
 
|
 
|
 
|-
 
|-
 
| 2016814
 
| 2011-10-24
 
| No Violations Noted
 
| WELL IS COMPLETE.
 
CREWS ARE WORKING ON PRODUCTION EQUIPTMENT.
 
|
 
|
 
|
 
|-
 
|-
 
| 2018633
 
| 2011-11-08
 
| No Violations Noted
 
| WELL IS DRILLED AND FRACED.
 
|
 
|
 
|
 
|-
 
|-
 
| 2027550
 
| 2011-12-14
 
| No Violations Noted
 
| WELL COMPLETE AND PRODUCING. WELL IS FENCED. E&S OK.
 
|
 
|
 
|
 
|-
 
|-
 
| 2027590
 
| 2011-11-28
 
| No Violations Noted
 
| WELL IS COMPLETE AND PRODUCING. WELL IS FENCED.
 
|
 
|
 
|
 
|-
 
|-
 
| 2035166
 
| 2012-01-12
 
| No Violations Noted
 
| THIS WELL IS COMPLETE AND HOOKED UP FOR PRODUCTION.
 
|
 
|
 
|
 
|-
 
|-
 
| 2055003
 
| 2012-03-15
 
| No Violations Noted
 
| THIS WELL IS COMPLETE AND PRODUCING.
 
THE WELL IS PROTECTED BY CEMENT BARRIERS.
 
|
 
|
 
|
 
|-
 
|-
 
| 2074517
 
| 2012-06-04
 
| No Violations Noted
 
| DRILLING COMPLETE AND WELL IS FRACED. WELL IS HOOKED UP AND PRODUCING.
 
THE SITE IS IN GOOD SHAPE.
 
|
 
|
 
|
 
|-
 
|-
 
| 2085868
 
| 2012-07-16
 
| No Violations Noted
 
| WELL IS PRODUCING. RESTORATION IN PROGRESS.
 
|
 
|
 
|
 
|-
 
|-
 
| 2097396
 
| 2012-08-27
 
| No Violations Noted
 
| THIS WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED.
 
|
 
|
 
|
 
|-
 
|-
 
| 2110934
 
| 2012-10-25
 
| No Violations Noted
 
| John Ley WQS, SWRO was on site to conduct a restoration inspection.  At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security.  Drilling had been completed and the well appeared to be equipped for production. 
 
 
 
Bmp's installed were functioning according to the E&S plan.  No accelerated erosion or sedimentation issues were noted on site or the access road.  All the silt socks were removed and the site appeared to be restored.  The hillsides had been stabilized and had good growth with at least 70% vegetation.   
 
 
 
|
 
|
 
|
 
|-
 
|-
 
| 2156445
 
| 2013-04-01
 
| No Violations Noted
 
| WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED. THE PAD IS FENCED AND LOCKED.
 
|
 
|
 
|
 
|-
 
|-
 
| 2198789
 
| 2013-07-11
 
| No Violations Noted
 
| The site for this well has been restored. Permanent stabilization appeared adequate.  Brine tanks appeared in good condition. Water in containment around tanks was clear with no oil sheen. Well was properly labeled. No erosion or sedimentation issues were noted.
 
|
 
|
 
|
 
|-
 
|-
 
| 2238536
 
| 2014-01-08
 
| No Violations Noted
 
| The well site has been restored and appeared equipped for production. Light snow cover at time of inspection.  Well was properly labeled; brine tanks appeared to be in good condition. Permanent stabilization appeared to be good with no apparent erosion or sedimentation issues.
 
|
 
|
 
|
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title = Oil and Gas Historical Inspection Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 
  | accessdate = 2015-05-27 }}</ref>
 
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2009-0
 
| 2009-0
 
| Drilling
 
| Drilling
| style="text-align:right;" | 3827.0
+
| style="text-align: right;" | 3,827.00 Bbl
| Bbl
 
 
| Other
 
| Other
|
 
| NOT LISTED
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| 2011-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 2,211.90 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 
|-
 
|-
| 2013-1
+
| 2011-1
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 403.33
+
| style="text-align: right;" | 1,090.48 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| 2012-2
 +
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 7.11 Tons
 +
| LANDFILL
 +
| 100277
 
|-
 
|-
| 2014-2
+
| 2013-1
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 308.38
+
| style="text-align: right;" | 403.33 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 641.67
+
| style="text-align: right;" | 641.67 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 116.90 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
 
| 2014-1
 
| 2014-1
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 379.29
+
| style="text-align: right;" | 379.29 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
 
|
 
 
|  
 
|  
 
|-
 
|-
|-
+
| 2014-2
| 2012-2
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align:right;" | 7.11
 
| Tons
 
| LANDFILL
 
| 100277
 
| WESTMORELAND WASTE LLC SANITARY LANDFILL
 
| BELLE VERNON
 
| PA
 
|-
 
|-
 
| 2014-1
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 116.9
+
| style="text-align: right;" | 23.38 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2014-2
 
| 2014-2
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 23.38
+
| style="text-align: right;" | 308.38 Bbl
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 2011-1
 
| Produced Fluid (in Barrels)
 
| style="text-align:right;" | 2211.9
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
|-
 
| 2011-1
 
| Produced Fluid (in Barrels)
 
| style="text-align:right;" | 1090.48
 
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| FRAC WATER REUSE
 
|
 
| PA
 
 
|-
 
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 130.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
 
| 2015-1
 
| 2015-1
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 258.33
+
| style="text-align: right;" | 258.33 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2015-2
 
| 2015-2
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 221.67
+
| style="text-align: right;" | 111.67 Bbl
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
 
|
 
|
 
|-
 
|-
 
| 2015-1
 
| Produced Fluid (in Barrels)
 
| style="text-align:right;" | 130.0
 
| Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2015-2
 
| 2015-2
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 18.33
+
| style="text-align: right;" | 18.33 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
| HYDRO RECOVERY LP WASHINGTON DEV
 
| BURGETTSTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2015-2
 
| 2015-2
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align:right;" | 111.67
+
| style="text-align: right;" | 221.67 Bbl
| Bbl
+
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 18.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| 2017-03
+
| 2016-1
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 20.12
+
| style="text-align: right;" | 224.00 Bbl
| Bbl
+
| REUSE OTHER THAN ROAD SPREADING
| REUSE (AT WELL PAD)
 
|
 
| WALASIK, TERRY UNIT (Well Pad Id: 150944)
 
 
|  
 
|  
| PA
 
 
|-
 
|-
 +
| 2016-2
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 20.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2017-06
+
| 2016-2
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 8.49
+
| style="text-align: right;" | 70.00 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| REUSE (AT WELL PAD)
+
| WMGR123SW005
|
 
| HARRIS MICHAEL (Well Pad Id: 152879)
 
|
 
| PA
 
|-
 
 
|-
 
|-
| 2017-09
+
| 2016-2
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 9.44
+
| style="text-align: right;" | 100.00 Bbl
| Bbl
+
| REUSE OTHER THAN ROAD SPREADING
| REUSE (AT WELL PAD)
 
|
 
| BEDILLION-DAY UNIT 2H (Well Pad Id: 147792)
 
 
|  
 
|  
| PA
 
 
|-
 
|-
 +
| 2017-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 18.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2017-10
+
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 32.5
+
| style="text-align: right;" | 40.00 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| RANDOLPH KAREN 11410 (Well Pad Id: 152845)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2017-03
| 2017-11
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| Produced Fluid (in Barrels) RWC 802
+
| style="text-align: right;" | 26.96 Bbl
| style="text-align:right;" | 18.65
 
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| DAY L&L UNIT 2H (Well Pad Id: 148175)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2017-03
| 2017-11
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 18.33
+
| style="text-align: right;" | 20.12 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MALACHOSKY EDWARD 11752 (Well Pad Id: 151731)
 
|
 
| PA
 
|-
 
 
|-
 
|-
 
| 2017-04
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 19.48
+
| style="text-align: right;" | 19.48 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| WALASIK, TERRY UNIT (Well Pad Id: 150944)
+
|-
 +
| 2017-05
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 19.08 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
| PA
 
 
|-
 
|-
|-
+
| 2017-05
| 2017-01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 40.0
+
| style="text-align: right;" | 36.67 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| ZEDIKER STATION (Well Pad Id: 153095)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2017-06
| 2017-07
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| Produced Fluid (in Barrels) RWC 802
+
| style="text-align: right;" | 9.85 Bbl
| style="text-align:right;" | 12.75
 
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| HARRIS MICHAEL (Well Pad Id: 152879)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2017-06
| 2017-05
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 36.67
+
| style="text-align: right;" | 8.49 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MOCEK JOHN (Well Pad Id: 153723)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2017-07
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 11.01 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2017-03
+
| 2017-07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align:right;" | 26.96
+
| style="text-align: right;" | 5.56 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| WALASIK, TERRY UNIT (Well Pad Id: 150944)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2017-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 25.27 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 
|-
 
|-
| 2017-06
+
| 2017-07
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 9.85
+
| style="text-align: right;" | 12.75 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| HARRIS MICHAEL (Well Pad Id: 152879)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2017-07
 +
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 +
| style="text-align: right;" | 0.03 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 
|-
 
|-
 
| 2017-09
 
| 2017-09
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align:right;" | 9.21
+
| style="text-align: right;" | 9.21 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| BEDILLION-DAY UNIT 2H (Well Pad Id: 147792)
+
|-
 +
| 2017-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 9.44 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
| PA
 
|-
 
 
|-
 
|-
 
| 2017-10
 
| 2017-10
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align:right;" | 5.85
+
| style="text-align: right;" | 5.85 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| RANDOLPH KAREN 11410 (Well Pad Id: 152845)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2017-10
| 2017-05
+
| Produced Fluid (in Barrels) RWC 802
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| style="text-align: right;" | 32.50 Bbl
| style="text-align:right;" | 19.08
 
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MOCEK JOHN (Well Pad Id: 153723)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2017-11
| 2017-07
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align:right;" | 5.56
+
| style="text-align: right;" | 18.21 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| HARRIS MICHAEL (Well Pad Id: 152879)
 
|
 
| PA
 
|-
 
 
|-
 
|-
 
| 2017-11
 
| 2017-11
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 18.21
+
| style="text-align: right;" | 18.65 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| DAY L&L UNIT 2H (Well Pad Id: 148175)
 
|
 
| PA
 
|-
 
|-
 
| 2017-07
 
| Soil Contaminated by Oil & Gas Related Spills (in
 
| style="text-align:right;" | 0.03
 
| Tons
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| 101532
 
| WEAVERTOWN TRANSPORTATION  LEASING INC
 
| MCDONALD
 
| PA
 
|-
 
|-
 
| 2017-07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align:right;" | 11.01
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| RES WATER BUTLER
 
| RENFREW
 
| PA
 
|-
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 25.27
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| RES WATER BUTLER
 
| RENFREW
 
| PA
 
|-
 
|-
 
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 18.33
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2017-12
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 18.7
+
| style="text-align: right;" | 18.70 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
| HYDRO RECOVERY LP WASHINGTON DEV
 
| BURGETTSTOWN
 
| PA
 
 
|-
 
|-
|-
+
| 2018-01
| 2018-09
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 3.89
+
| style="text-align: right;" | 18.33 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MILLER JR 10602 (Well Pad Id: 154153)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2018-02
| 2018-11
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| Produced Fluid (in Barrels) RWC 802
+
| style="text-align: right;" | 29.45 Bbl
| style="text-align:right;" | 35.97
 
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MILLER JR 10602 (Well Pad Id: 154153)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2018-02
| 2018-05
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 13.64
+
| style="text-align: right;" | 19.48 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| THOMPSON DONALD 11750 (Well Pad Id: 152550)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2018-03
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 19.30 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
 
| 2018-03
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 33.58
+
| style="text-align: right;" | 3.00 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| REUSE (AT WELL PAD)
+
| WMGR123SW005
|
 
| MARTIN EDWARD 12273 (Well Pad Id: 151895)
 
|
 
| PA
 
|-
 
 
|-
 
|-
 
| 2018-03
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 18.62
+
| style="text-align: right;" | 33.58 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MUNCE WILLIAM (Well Pad Id: 153759)
+
|-
 +
| 2018-04
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 9.35 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
| PA
 
|-
 
 
|-
 
|-
 
| 2018-04
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 1.67
+
| style="text-align: right;" | 1.67 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| EAKIN, SANDRA (Well Pad Id: 151794)
+
|-
 +
| 2018-05
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 4.70 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
| PA
 
 
|-
 
|-
|-
+
| 2018-05
| 2018-04
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 27.47
+
| style="text-align: right;" | 13.64 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| GULICK (Well Pad Id: 145504)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2018-06
| 2018-12
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 15.03
+
| style="text-align: right;" | 18.33 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MILLER JR 10602 (Well Pad Id: 154153)
+
|-
 +
| 2018-07
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 1.67 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
| PA
 
 
|-
 
|-
|-
+
| 2018-07
| 2018-02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 19.48
+
| style="text-align: right;" | 14.33 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MARTIN EDWARD 12273 (Well Pad Id: 151895)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2018-09
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 18.65 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 
|-
 
|-
| 2018-01
+
| 2018-09
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align:right;" | 18.33
+
| style="text-align: right;" | 32.62 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| KANCEL UNIT (Well Pad Id: 148652)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2018-09
| 2018-01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 38.33
+
| style="text-align: right;" | 3.89 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| MATCHETT FARM 12122 (Well Pad Id: 153631)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2018-11
| 2018-07
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 14.33
+
| style="text-align: right;" | 35.97 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| BIGGER THOMAS 10235 (Well Pad Id: 151485)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2018-12
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 23.97 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 8.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2018-07
+
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 16.42
+
| style="text-align: right;" | 15.03 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| BAUMEL (Well Pad Id: 152302)
+
|-
 +
| 2019-02
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 9.52 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
| PA
 
 
|-
 
|-
|-
+
| 2019-02
| 2018-07
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 18.37
+
| style="text-align: right;" | 26.67 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| CAMPBELL JACOB UNIT (Well Pad Id: 147355)
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2019-03
| 2018-06
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 18.33
+
| style="text-align: right;" | 19.10 Bbl
| Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
| BAUMEL (Well Pad Id: 152302)
 
|
 
| PA
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1785102
 +
| Primary Facility
 +
| 04/16/2009
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The marcellus well is not in production at the time of the inspection. The initial phase of drilling (top hole) appears to be completed.  The below grade pit has been properly installed and is maintaining the 2 feet of freeboard.  There is no accelerated erosion and sedimentation noted on the access road or well site.  It is recommended that the operator seed and mulch the well site and continue to monitor the access road and well site for erosion and sedimentation.  Accompanied Greg Higgins for training.
 +
|-
 +
| 1785668
 +
| Primary Facility
 +
| 04/09/2009
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Marcellus Well, verticle to 7105, e/s ok
 
|-
 
|-
| 2018-02
+
| 1803413
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 29.45
+
| 06/08/2009
| Bbl
+
| Routine/Complete Inspection
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| Drilling was completed on 2/18/09
| MARTIN EDWARD 12273 (Well Pad Id: 151895)
+
|-
|  
+
| 1894331
| PA
+
| Primary Facility
 +
| 06/23/2010
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On June 23rd, 2010 I met with Range Resources E&S Supervisor Jeremy Matinko to discuss the encapsulated drill cuttings on site. Due to expansion of the dril pad the pit would need to be uncovered and the drill cuttings moved.  It was decided that when uncovered the previous drill cuttings would be hauled and disposed of offsite.  The site was currently under construction.  E&S controls were in place according to the most recent ESCGP-1.  The access road was in good condition. A site ID and E&S plan were posted on site.
 
|-
 
|-
 +
| 1911499
 +
| Primary Facility
 +
| 08/12/2010
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On August 12th, 2010 I conducted a routine inspection of the above site.  Frazer township had received 4.41" of rain the previous night.  Some gravel from the access road had been washed onto the public roadway. Due to the large amount of rain, various portions of the E&S controls needed repair.  No sediment was leaving site however.  The super silt fence at the front of the site surrounding the top soil piles was becoming overtaken.  Portions of filter sock inside the silt fence were undermined and sediment was piling up.  The interceptor channels at the rear of the pad were damaged.  Erosion blanket had slid off the fill slope and into the sediment trap.  The sediment trap also was filling and needed cleaned.  Arrangements were made to meet the operator the next morning and a street sweeper was dispatched to the site.
 
|-
 
|-
| 2018-05
+
| 1911504
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 4.7
+
| 08/13/2010
| Bbl
+
| Routine/Complete Inspection
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| On August 13th, 2010 I met with Range Resources representatives Jeremy Matinko on site to discuss repairs needed noted in the 8/12/2010 inspection.  A street sweeper was on site the night before and had cleaned the public roadway.  Silt fence and filter sock repairs were taking place immediately.  The other repairs would be scheduled as soon as the soil would become dry enough for heavy equipment to work on.
| THOMPSON DONALD 11750 (Well Pad Id: 152550)
 
|
 
| PA
 
 
|-
 
|-
 +
| 1913729
 +
| Primary Facility
 +
| 08/31/2010
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On August 31th, 2010 I met with Range Resources representative Jeremy Matinko on site to discuss repairs as a result of the storm event noted in the 8/12/2010 inspection.  The sediment trap and interceptor channels had been restored to plan specifications.  The silt fence had been repaired and other sections have had the sediment piled against it removed.  Additional filter sock and rock filters have been added to the site in several locations.  The access road was now in good condition.
 
|-
 
|-
| 2018-04
+
| 1917078
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 9.35
+
| 09/10/2010
| Bbl
+
| Routine/Complete Inspection
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| On September 10th, 2010 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  A wireline rig was set up on the well and crews were setting up to pull the 4-1/2" casing in preparation for the redrill.
| GULICK (Well Pad Id: 145504)
 
|
 
| PA
 
 
|-
 
|-
 +
| 1927871
 +
| Primary Facility
 +
| 10/25/2010
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| MARCELLUS WELL. DRILLED TO 7300' AND CEMENTED BACK TO KOP. PATTERSON RIG IS BEING BUILT. SITE, E&S, AND ACCESS OK.
 
|-
 
|-
| 2018-04
+
| 1930577
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 15.87
+
| 11/02/2010
| Bbl
+
| Drilling/Alteration
| REUSE (AT WELL PAD)
+
| No Violations Noted
|
+
| PATTERSON 325 IS DRILLING THIS HORIZONTAL MARCELLUS WELL. SITE WILL BE EXPANDED FOR FRAC TANKS.
| EAKIN, SANDRA (Well Pad Id: 151794)
 
|
 
| PA
 
 
|-
 
|-
 +
| 1930583
 +
| Primary Facility
 +
| 11/04/2010
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| PATTERSON RIG 325 DRILLING HORIZONTAL LEG OF THIS MARCELLUS WELL. KOP @ 5833'. T.D. @ 9850'. CREW PULLING DRILL RODS AND THEN WILL RUN 5 1/2" CASING. SITE, E&S, AND ACCESS, OK.
 
|-
 
|-
| 2018-09
+
| 1931252
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 32.62
+
| 11/17/2010
| Bbl
+
| Routine/Complete Inspection
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| On November 17th, 2010 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  The redrill had been completed.  Construction for the tank pad was completed and frac tanks were being delivered. Crews were on site prepping for the upcoming frac.
| MILLER JR 10602 (Well Pad Id: 154153)
 
|
 
| PA
 
 
|-
 
|-
 +
| 1933219
 +
| Primary Facility
 +
| 11/16/2010
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| MARCELLUS HOIZONTAL WELL. PATTERSON RIG IS GONE. CREW WORKING ON THE WELL HEAD. AREA FOR FRAC TANKS UNDER CONSTRUCTION.
 
|-
 
|-
| 2018-07
+
| 1933225
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 1.67
+
| 11/10/2010
| Bbl
+
| Drilling/Alteration
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| 5" IS CEMENTED. RIG IS BEING DISMANTLED. THE SITE IS BEING PREPARED FOR FRAC.
| BAUMEL (Well Pad Id: 152302)
 
|
 
| PA
 
 
|-
 
|-
 +
| 1934239
 +
| Primary Facility
 +
| 11/29/2010
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| FRAC TECH ON SITE SETTING UPTO FRAC THIS HORIZONTAL MARCELLUS WELL.
 
|-
 
|-
| 2018-07
+
| 1947185
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 7.14
+
| 01/10/2011
| Bbl
+
| Drilling/Alteration
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| SITE, E&S, AND ACCESS, OK. MARCELLUS WELL IS BEING FLARED. SITE IS FENCED AND SECURITY IS PRESENT.
| BIGGER THOMAS 10235 (Well Pad Id: 151485)
+
|-
|  
+
| 1953924
| PA
+
| Primary Facility
 +
| 01/18/2011
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL IS COMPLETE. THE FLARESTACK HAS BEEN REMOVED.
 
|-
 
|-
 +
| 1958587
 +
| Primary Facility
 +
| 02/10/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On February 10th, 2011 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  Some routine maintenance of E&S controls is required in a few areas.  The redrill and frac had been completed.  No spills/ leaks or accelerated erosion were observed at the time of inspection.
 
|-
 
|-
| 2018-07
+
| 1959388
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 36.67
+
| 03/02/2011
| Bbl
+
| Routine/Complete Inspection
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| On March 2nd, 2011 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  Some routine maintenance of E&S controls is required in a few areas: silt fence and control blankets along the tank pad. The redrill and frac had been completed.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  .
| ROBINSON CAMPBELL 11132 (Well Pad Id: 153651)
 
|
 
| PA
 
 
|-
 
|-
 +
| 1961862
 +
| Primary Facility
 +
| 03/18/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On March 18th, 2011 I visited this site as a routine inspection.  The access road was in good condition.  Site ID and E&S plan were posted on site.  E&S controls were in place according to the ESCGP-1 and functioning properly.  2 frac tanks were left on site.  The redrill and frac had been completed, but the well was not yet in production.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  .
 
|-
 
|-
| 2018-09
+
| 1976478
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 18.65
+
| 04/20/2011
| Bbl
+
| Drilling/Alteration
| RESIDUAL WASTE PROCESSING FACILITY
+
| No Violations Noted
| WMGR123SW019
+
| THIS MARCELLUS WELL IS DRILLED AND FRACED, BUT NOT
| HYDRO RECOVERY LP WASHINGTON DEV
 
| BURGETTSTOWN
 
| PA
 
 
|-
 
|-
 +
| 1991679
 +
| Primary Facility
 +
| 07/08/2011
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL IS COMPLETE. SITE AND E&S, OK. ACCESS IS GATED. SITE WILL BE CHANGED FOR MORE WELLS.
 
|-
 
|-
| 2018-03
+
| 1998348
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 19.3
+
| 08/04/2011
| Bbl
+
| Drilling/Alteration
| RESIDUAL WASTE PROCESSING FACILITY
+
| No Violations Noted
| WMGR123SW005
+
| WELLCOMPLETE. THE SITE IS BEING REBUILT TO ADD MORE WELLS.
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2016814
 +
| Primary Facility
 +
| 10/24/2011
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL IS COMPLETE.
 
|-
 
|-
| 2018-12
+
| 2018633
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 23.97
+
| 11/08/2011
| Bbl
+
| Drilling/Alteration
| RESIDUAL WASTE PROCESSING FACILITY
+
| No Violations Noted
| WMGR123SW005
+
| WELL IS DRILLED AND FRACED.
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2027550
 +
| Primary Facility
 +
| 12/14/2011
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL COMPLETE AND PRODUCING. WELL IS FENCED. E&S OK.
 
|-
 
|-
| 2018-03
+
| 2027590
| Produced Fluid (in Barrels) RWC 802
+
| Primary Facility
| style="text-align:right;" | 3.0
+
| 11/28/2011
| Bbl
+
| Drilling/Alteration
| RESIDUAL WASTE PROCESSING FACILITY
+
| No Violations Noted
| WMGR123SW005
+
| WELL IS COMPLETE AND PRODUCING. WELL IS FENCED.
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2035166
 +
| Primary Facility
 +
| 01/12/2012
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| THIS WELL IS COMPLETE AND HOOKED UP FOR PRODUCTION.
 
|-
 
|-
| 2018-12
+
| 2055003
| Produced Fluid (in Barrels) RWC 802
+
| Primary Facility
| style="text-align:right;" | 8.33
+
| 03/15/2012
| Bbl
+
| Drilling/Alteration
| RESIDUAL WASTE PROCESSING FACILITY
+
| No Violations Noted
| WMGR123SW005
+
| THIS WELL IS COMPLETE AND PRODUCING.
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2074517
 +
| Primary Facility
 +
| 06/04/2012
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| DRILLING COMPLETE AND WELL IS FRACED. WELL IS HOOKED UP AND PRODUCING.
 
|-
 
|-
| 2019-02
+
| 2085868
| Produced Fluid (in Barrels) RWC 802
+
| Primary Facility
| style="text-align:right;" | 26.67
+
| 07/16/2012
| Bbl
+
| Drilling/Alteration
| REUSE (AT WELL PAD)
+
| No Violations Noted
|
+
| WELL IS PRODUCING. RESTORATION IN PROGRESS.
| MAZURE WILLIAM 12118 (Well Pad Id: 150424)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2097396
 +
| Primary Facility
 +
| 08/27/2012
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| THIS WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED.
 
|-
 
|-
| 2019-02
+
| 2110934
| Produced Fluid (in Barrels) RWC 802
+
| Primary Facility
| style="text-align:right;" | 8.81
+
| 10/25/2012
| Bbl
+
| Site Restoration
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| John Ley WQS, SWRO was on site to conduct a restoration inspection.  At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security.  Drilling had been completed and the well appeared to be equipped for production.
| SEIBEL JOSEPH 11396 (Well Pad Id: 153080)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2156445
 +
| Primary Facility
 +
| 04/01/2013
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED. THE PAD IS FENCED AND LOCKED.
 
|-
 
|-
| 2019-03
+
| 2198789
| Produced Fluid (in Barrels) RWC 802
+
| Primary Facility
| style="text-align:right;" | 19.1
+
| 07/11/2013
| Bbl
+
| Routine/Complete Inspection
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| The site for this well has been restored. Permanent stabilization appeared adequate.  Brine tanks appeared in good condition. Water in containment around tanks was clear with no oil sheen. Well was properly labeled. No erosion or sedimentation issues were noted.
| SEIBEL JOSEPH 11396 (Well Pad Id: 153080)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2238536
 +
| Primary Facility
 +
| 01/08/2014
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The well site has been restored and appeared equipped for production. Light snow cover at time of inspection.  Well was properly labeled; brine tanks appeared to be in good condition. Permanent stabilization appeared to be good with no apparent erosion or sedimentation issues.
 
|-
 
|-
| 2019-02
+
| 2413403
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 9.52
+
| 08/31/2015
| Bbl
+
| Complaint Inspection
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| On 8/31/15, water samples were taken from the basement tap prior to treatment for 946 analysis in response to complaint 314344.
| SEIBEL JOSEPH 11396 (Well Pad Id: 153080)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2422357
 +
| Primary Facility
 +
| 10/28/2015
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| Administrative review of lab results on 10/28/15 indicates that the water supply does not appear to have been impacted by oil & gas activity.  Results and documentation forwarded for final determination.
 
|-
 
|-
| 2019-02
+
| 2682672
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Primary Facility
| style="text-align:right;" | 10.0
+
| 2018-01-16
| Bbl
+
| Routine/Complete Inspection
| REUSE (AT WELL PAD)
+
| No Violations Noted
|  
+
| Well drilled and equipped for production. Well apparatus, gas production unit and brine tank appear to be in sound condition. At the time of inspection the well site was covered with snow. The Department will follow up in the spring of 2018 to evaluated the disturbed areas.
| MAZURE WILLIAM 12118 (Well Pad Id: 150424)
 
|
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 17:35, 12 July 2019

Well Details

Well ID: 37-003-21982
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Frazer Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 146376
Farm/Lease Name: YUTE UNIT 4H
License Status: Active
Spud Date: 02/03/2009
Permit Date: 10/3/2008
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.572278
Longitude: -79.807056

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 0.00 0.00 0.00
2009 0.00 0.00 0.00
2010 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 RANGE RESOURCES APPALACHIA LLC 583,550.00 81 0.00 0 10.00 81
2012 RANGE RESOURCES APPALACHIA LLC 784,415.93 349 0.00 0 0.00 0
2013 RANGE RESOURCES APPALACHIA LLC 625,822.38 338 0.00 0 0.00 0
2014 RANGE RESOURCES APPALACHIA LLC 340,996.97 364 0.00 0 0.00 0
2015 RANGE RESOURCES APPALACHIA LLC 262,330.22 365 0.00 0 0.00 0
2016 RANGE RESOURCES APPALACHIA LLC 177,338.67 346 0.00 0 0.00 0
2017 RANGE RESOURCES APPALACHIA LLC 154,198.10 364 0.00 0 0.00 0
2018 RANGE RESOURCES APPALACHIA LLC 128,957.99 269 0.00 0 0.00 0
2019 RANGE RESOURCES APPALACHIA LLC 45,197.97 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2009-0 Drilling 3,827.00 Bbl Other
2011-1 Produced Fluid (in Barrels) 2,211.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-1 Produced Fluid (in Barrels) 1,090.48 Bbl REUSE OTHER THAN ROAD SPREADING
2012-2 Fracturing Fluid Waste (in Tons) 7.11 Tons LANDFILL 100277
2013-1 Produced Fluid (in Barrels) 403.33 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Produced Fluid (in Barrels) 641.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Produced Fluid (in Barrels) 116.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2014-1 Produced Fluid (in Barrels) 379.29 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Produced Fluid (in Barrels) 23.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2014-2 Produced Fluid (in Barrels) 308.38 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Produced Fluid (in Barrels) 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015-1 Produced Fluid (in Barrels) 258.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 111.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015-2 Produced Fluid (in Barrels) 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2015-2 Produced Fluid (in Barrels) 221.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-1 Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016-1 Produced Fluid (in Barrels) RWC 802 224.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Other Oil & Gas Wastes (in Barrels) RWC 899 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-2 Produced Fluid (in Barrels) RWC 802 70.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-2 Produced Fluid (in Barrels) RWC 802 100.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-01 Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-01 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2017-03 Other Oil & Gas Wastes (in Barrels) RWC 899 26.96 Bbl REUSE (AT WELL PAD)
2017-03 Produced Fluid (in Barrels) RWC 802 20.12 Bbl REUSE (AT WELL PAD)
2017-04 Produced Fluid (in Barrels) RWC 802 19.48 Bbl REUSE (AT WELL PAD)
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 19.08 Bbl REUSE (AT WELL PAD)
2017-05 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2017-06 Other Oil & Gas Wastes (in Barrels) RWC 899 9.85 Bbl REUSE (AT WELL PAD)
2017-06 Produced Fluid (in Barrels) RWC 802 8.49 Bbl REUSE (AT WELL PAD)
2017-07 Other Oil & Gas Wastes (in Barrels) RWC 899 11.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017-07 Other Oil & Gas Wastes (in Barrels) RWC 899 5.56 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 25.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017-07 Produced Fluid (in Barrels) RWC 802 12.75 Bbl REUSE (AT WELL PAD)
2017-07 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017-09 Other Oil & Gas Wastes (in Barrels) RWC 899 9.21 Bbl REUSE (AT WELL PAD)
2017-09 Produced Fluid (in Barrels) RWC 802 9.44 Bbl REUSE (AT WELL PAD)
2017-10 Other Oil & Gas Wastes (in Barrels) RWC 899 5.85 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Barrels) RWC 802 32.50 Bbl REUSE (AT WELL PAD)
2017-11 Other Oil & Gas Wastes (in Barrels) RWC 899 18.21 Bbl REUSE (AT WELL PAD)
2017-11 Produced Fluid (in Barrels) RWC 802 18.65 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Barrels) RWC 802 18.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-01 Produced Fluid (in Barrels) RWC 802 18.33 Bbl REUSE (AT WELL PAD)
2018-02 Other Oil & Gas Wastes (in Barrels) RWC 899 29.45 Bbl REUSE (AT WELL PAD)
2018-02 Produced Fluid (in Barrels) RWC 802 19.48 Bbl REUSE (AT WELL PAD)
2018-03 Other Oil & Gas Wastes (in Barrels) RWC 899 19.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-03 Produced Fluid (in Barrels) RWC 802 3.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-03 Produced Fluid (in Barrels) RWC 802 33.58 Bbl REUSE (AT WELL PAD)
2018-04 Other Oil & Gas Wastes (in Barrels) RWC 899 9.35 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 1.67 Bbl REUSE (AT WELL PAD)
2018-05 Other Oil & Gas Wastes (in Barrels) RWC 899 4.70 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 13.64 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 18.33 Bbl REUSE (AT WELL PAD)
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 1.67 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 14.33 Bbl REUSE (AT WELL PAD)
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 18.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 32.62 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 3.89 Bbl REUSE (AT WELL PAD)
2018-11 Produced Fluid (in Barrels) RWC 802 35.97 Bbl REUSE (AT WELL PAD)
2018-12 Other Oil & Gas Wastes (in Barrels) RWC 899 23.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-12 Produced Fluid (in Barrels) RWC 802 8.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-12 Produced Fluid (in Barrels) RWC 802 15.03 Bbl REUSE (AT WELL PAD)
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 9.52 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 26.67 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 19.10 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1785102 Primary Facility 04/16/2009 Routine/Complete Inspection No Violations Noted The marcellus well is not in production at the time of the inspection. The initial phase of drilling (top hole) appears to be completed. The below grade pit has been properly installed and is maintaining the 2 feet of freeboard. There is no accelerated erosion and sedimentation noted on the access road or well site. It is recommended that the operator seed and mulch the well site and continue to monitor the access road and well site for erosion and sedimentation. Accompanied Greg Higgins for training.
1785668 Primary Facility 04/09/2009 Drilling/Alteration No Violations Noted Marcellus Well, verticle to 7105, e/s ok
1803413 Primary Facility 06/08/2009 Routine/Complete Inspection No Violations Noted Drilling was completed on 2/18/09
1894331 Primary Facility 06/23/2010 Routine/Complete Inspection No Violations Noted On June 23rd, 2010 I met with Range Resources E&S Supervisor Jeremy Matinko to discuss the encapsulated drill cuttings on site. Due to expansion of the dril pad the pit would need to be uncovered and the drill cuttings moved. It was decided that when uncovered the previous drill cuttings would be hauled and disposed of offsite. The site was currently under construction. E&S controls were in place according to the most recent ESCGP-1. The access road was in good condition. A site ID and E&S plan were posted on site.
1911499 Primary Facility 08/12/2010 Routine/Complete Inspection No Violations Noted On August 12th, 2010 I conducted a routine inspection of the above site. Frazer township had received 4.41" of rain the previous night. Some gravel from the access road had been washed onto the public roadway. Due to the large amount of rain, various portions of the E&S controls needed repair. No sediment was leaving site however. The super silt fence at the front of the site surrounding the top soil piles was becoming overtaken. Portions of filter sock inside the silt fence were undermined and sediment was piling up. The interceptor channels at the rear of the pad were damaged. Erosion blanket had slid off the fill slope and into the sediment trap. The sediment trap also was filling and needed cleaned. Arrangements were made to meet the operator the next morning and a street sweeper was dispatched to the site.
1911504 Primary Facility 08/13/2010 Routine/Complete Inspection No Violations Noted On August 13th, 2010 I met with Range Resources representatives Jeremy Matinko on site to discuss repairs needed noted in the 8/12/2010 inspection. A street sweeper was on site the night before and had cleaned the public roadway. Silt fence and filter sock repairs were taking place immediately. The other repairs would be scheduled as soon as the soil would become dry enough for heavy equipment to work on.
1913729 Primary Facility 08/31/2010 Routine/Complete Inspection No Violations Noted On August 31th, 2010 I met with Range Resources representative Jeremy Matinko on site to discuss repairs as a result of the storm event noted in the 8/12/2010 inspection. The sediment trap and interceptor channels had been restored to plan specifications. The silt fence had been repaired and other sections have had the sediment piled against it removed. Additional filter sock and rock filters have been added to the site in several locations. The access road was now in good condition.
1917078 Primary Facility 09/10/2010 Routine/Complete Inspection No Violations Noted On September 10th, 2010 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. A wireline rig was set up on the well and crews were setting up to pull the 4-1/2" casing in preparation for the redrill.
1927871 Primary Facility 10/25/2010 Drilling/Alteration No Violations Noted MARCELLUS WELL. DRILLED TO 7300' AND CEMENTED BACK TO KOP. PATTERSON RIG IS BEING BUILT. SITE, E&S, AND ACCESS OK.
1930577 Primary Facility 11/02/2010 Drilling/Alteration No Violations Noted PATTERSON 325 IS DRILLING THIS HORIZONTAL MARCELLUS WELL. SITE WILL BE EXPANDED FOR FRAC TANKS.
1930583 Primary Facility 11/04/2010 Drilling/Alteration No Violations Noted PATTERSON RIG 325 DRILLING HORIZONTAL LEG OF THIS MARCELLUS WELL. KOP @ 5833'. T.D. @ 9850'. CREW PULLING DRILL RODS AND THEN WILL RUN 5 1/2" CASING. SITE, E&S, AND ACCESS, OK.
1931252 Primary Facility 11/17/2010 Routine/Complete Inspection No Violations Noted On November 17th, 2010 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. The redrill had been completed. Construction for the tank pad was completed and frac tanks were being delivered. Crews were on site prepping for the upcoming frac.
1933219 Primary Facility 11/16/2010 Drilling/Alteration No Violations Noted MARCELLUS HOIZONTAL WELL. PATTERSON RIG IS GONE. CREW WORKING ON THE WELL HEAD. AREA FOR FRAC TANKS UNDER CONSTRUCTION.
1933225 Primary Facility 11/10/2010 Drilling/Alteration No Violations Noted 5" IS CEMENTED. RIG IS BEING DISMANTLED. THE SITE IS BEING PREPARED FOR FRAC.
1934239 Primary Facility 11/29/2010 Drilling/Alteration No Violations Noted FRAC TECH ON SITE SETTING UPTO FRAC THIS HORIZONTAL MARCELLUS WELL.
1947185 Primary Facility 01/10/2011 Drilling/Alteration No Violations Noted SITE, E&S, AND ACCESS, OK. MARCELLUS WELL IS BEING FLARED. SITE IS FENCED AND SECURITY IS PRESENT.
1953924 Primary Facility 01/18/2011 Drilling/Alteration No Violations Noted WELL IS COMPLETE. THE FLARESTACK HAS BEEN REMOVED.
1958587 Primary Facility 02/10/2011 Routine/Complete Inspection No Violations Noted On February 10th, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. Some routine maintenance of E&S controls is required in a few areas. The redrill and frac had been completed. No spills/ leaks or accelerated erosion were observed at the time of inspection.
1959388 Primary Facility 03/02/2011 Routine/Complete Inspection No Violations Noted On March 2nd, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. Some routine maintenance of E&S controls is required in a few areas: silt fence and control blankets along the tank pad. The redrill and frac had been completed. No spills/ leaks or accelerated erosion were observed at the time of inspection. .
1961862 Primary Facility 03/18/2011 Routine/Complete Inspection No Violations Noted On March 18th, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. 2 frac tanks were left on site. The redrill and frac had been completed, but the well was not yet in production. No spills/ leaks or accelerated erosion were observed at the time of inspection. .
1976478 Primary Facility 04/20/2011 Drilling/Alteration No Violations Noted THIS MARCELLUS WELL IS DRILLED AND FRACED, BUT NOT
1991679 Primary Facility 07/08/2011 Drilling/Alteration No Violations Noted WELL IS COMPLETE. SITE AND E&S, OK. ACCESS IS GATED. SITE WILL BE CHANGED FOR MORE WELLS.
1998348 Primary Facility 08/04/2011 Drilling/Alteration No Violations Noted WELLCOMPLETE. THE SITE IS BEING REBUILT TO ADD MORE WELLS.
2016814 Primary Facility 10/24/2011 Drilling/Alteration No Violations Noted WELL IS COMPLETE.
2018633 Primary Facility 11/08/2011 Drilling/Alteration No Violations Noted WELL IS DRILLED AND FRACED.
2027550 Primary Facility 12/14/2011 Drilling/Alteration No Violations Noted WELL COMPLETE AND PRODUCING. WELL IS FENCED. E&S OK.
2027590 Primary Facility 11/28/2011 Drilling/Alteration No Violations Noted WELL IS COMPLETE AND PRODUCING. WELL IS FENCED.
2035166 Primary Facility 01/12/2012 Drilling/Alteration No Violations Noted THIS WELL IS COMPLETE AND HOOKED UP FOR PRODUCTION.
2055003 Primary Facility 03/15/2012 Drilling/Alteration No Violations Noted THIS WELL IS COMPLETE AND PRODUCING.
2074517 Primary Facility 06/04/2012 Drilling/Alteration No Violations Noted DRILLING COMPLETE AND WELL IS FRACED. WELL IS HOOKED UP AND PRODUCING.
2085868 Primary Facility 07/16/2012 Drilling/Alteration No Violations Noted WELL IS PRODUCING. RESTORATION IN PROGRESS.
2097396 Primary Facility 08/27/2012 Drilling/Alteration No Violations Noted THIS WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED.
2110934 Primary Facility 10/25/2012 Site Restoration No Violations Noted John Ley WQS, SWRO was on site to conduct a restoration inspection. At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security. Drilling had been completed and the well appeared to be equipped for production.
2156445 Primary Facility 04/01/2013 Routine/Complete Inspection No Violations Noted WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED. THE PAD IS FENCED AND LOCKED.
2198789 Primary Facility 07/11/2013 Routine/Complete Inspection No Violations Noted The site for this well has been restored. Permanent stabilization appeared adequate. Brine tanks appeared in good condition. Water in containment around tanks was clear with no oil sheen. Well was properly labeled. No erosion or sedimentation issues were noted.
2238536 Primary Facility 01/08/2014 Routine/Complete Inspection No Violations Noted The well site has been restored and appeared equipped for production. Light snow cover at time of inspection. Well was properly labeled; brine tanks appeared to be in good condition. Permanent stabilization appeared to be good with no apparent erosion or sedimentation issues.
2413403 Primary Facility 08/31/2015 Complaint Inspection No Violations Noted On 8/31/15, water samples were taken from the basement tap prior to treatment for 946 analysis in response to complaint 314344.
2422357 Primary Facility 10/28/2015 Administrative/File Review No Violations Noted Administrative review of lab results on 10/28/15 indicates that the water supply does not appear to have been impacted by oil & gas activity. Results and documentation forwarded for final determination.
2682672 Primary Facility 2018-01-16 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well apparatus, gas production unit and brine tank appear to be in sound condition. At the time of inspection the well site was covered with snow. The Department will follow up in the spring of 2018 to evaluated the disturbed areas.

For data sources see[6]

References