X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-21982"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-21982
 
| Well ID: 37-003-21982
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.572278, -79.807056 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.572278, -79.807056 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 02/03/2009
+
| Spud Date: 2009-02-03
 
|-
 
|-
| Permit Date: 10/3/2008
+
| Permit Date: 2008-10-03
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 86:
 
|-
 
|-
 
| 2008
 
| 2008
| style="text-align: right;" |
+
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 178: Line 203:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 183: Line 209:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2009-0
+
| 2009
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Drilling
 
| Drilling
 
| style="text-align: right;" | 3,827.00 Bbl
 
| style="text-align: right;" | 3,827.00 Bbl
Line 189: Line 216:
 
|  
 
|  
 
|-
 
|-
| 2011-1
+
| 2011
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,090.48 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2011
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 2,211.90 Bbl
 
| style="text-align: right;" | 2,211.90 Bbl
Line 195: Line 230:
 
| 301353
 
| 301353
 
|-
 
|-
| 2011-1
+
| 2012
| Produced Fluid (in Barrels)
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 1,090.48 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2012-2
 
 
| Fracturing Fluid Waste (in Tons)
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align: right;" | 7.11 Tons
 
| style="text-align: right;" | 7.11 Tons
Line 207: Line 237:
 
| 100277
 
| 100277
 
|-
 
|-
| 2013-1
+
| 2013
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 403.33 Bbl
+
| style="text-align: right;" | 1,045.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-2
+
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 641.67 Bbl
+
| style="text-align: right;" | 687.67 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-1
+
| 2014
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 116.90 Bbl
+
| style="text-align: right;" | 140.28 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2014-1
+
| 2015
| Produced Fluid (in Barrels)
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 379.29 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 23.38 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2014-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 308.38 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-1
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 130.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2015-1
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 258.33 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 111.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2015-2
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 18.33 Bbl
 
| style="text-align: right;" | 18.33 Bbl
Line 267: Line 265:
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2015-2
+
| 2015
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 221.67 Bbl
+
| style="text-align: right;" | 480.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-1
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 36.67 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 241.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-1
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 18.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2016-1
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 224.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-2
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 297: Line 286:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-2
+
| 2016
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 70.00 Bbl
+
| style="text-align: right;" | 324.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2016-2
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-01
+
| 2016
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 18.33 Bbl
+
| style="text-align: right;" | 106.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-01
+
| 2016
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 40.00 Bbl
+
| style="text-align: right;" | 18.33 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| WMGR123SW019
 
|-
 
|-
| 2017-03
+
| 2017
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 26.96 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-03
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 20.12 Bbl
+
| style="text-align: right;" | 198.10 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-04
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 19.48 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-05
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 19.08 Bbl
+
| style="text-align: right;" | 94.72 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-05
+
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 36.67 Bbl
+
| style="text-align: right;" | 18.70 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 9.85 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 8.49 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 11.01 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NW009
+
| WMGR123SW019
 
|-
 
|-
| 2017-07
+
| 2017
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 5.56 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.27 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 12.75 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-07
 
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 0.03 Tons
 
| style="text-align: right;" | 0.03 Tons
Line 393: Line 335:
 
| 101532
 
| 101532
 
|-
 
|-
| 2017-09
+
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 9.21 Bbl
+
| style="text-align: right;" | 11.01 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 9.44 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-10
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 5.85 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 32.50 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 18.21 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 18.65 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 18.70 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW019
+
| WMGR123NW009
 
|-
 
|-
| 2018-01
+
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 18.33 Bbl
 
| style="text-align: right;" | 18.33 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-02
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 29.45 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 19.48 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 19.30 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-03
+
| 2017
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 3.00 Bbl
+
| style="text-align: right;" | 25.27 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW005
+
| WMGR123NW009
 
|-
 
|-
| 2018-03
+
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 33.58 Bbl
+
| style="text-align: right;" | 174.25 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-04
+
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 9.35 Bbl
+
| style="text-align: right;" | 77.79 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-04
+
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 1.67 Bbl
+
| style="text-align: right;" | 11.33 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| WMGR123SW005
 
|-
 
|-
| 2018-05
+
| 2018
 +
| [[RANGE RESOURCES APPALACHIA LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 4.70 Bbl
+
| style="text-align: right;" | 43.27 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| WMGR123SW005
 
|-
 
|-
| 2018-05
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 13.64 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 18.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 1.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 14.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-09
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 18.65 Bbl
 
| style="text-align: right;" | 18.65 Bbl
Line 519: Line 391:
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2018-09
+
| 2019
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 32.62 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-09
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 3.89 Bbl
+
| style="text-align: right;" | 45.77 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-11
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[RANGE RESOURCES APPALACHIA LLC]]
| style="text-align: right;" | 35.97 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-12
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 23.97 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 8.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.03 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-02
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 9.52 Bbl
 
| style="text-align: right;" | 9.52 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 26.67 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 19.10 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 592: Line 424:
 
| 1785102
 
| 1785102
 
| Primary Facility
 
| Primary Facility
| 04/16/2009
+
| 2009-04-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 599: Line 431:
 
| 1785668
 
| 1785668
 
| Primary Facility
 
| Primary Facility
| 04/09/2009
+
| 2009-04-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 606: Line 438:
 
| 1803413
 
| 1803413
 
| Primary Facility
 
| Primary Facility
| 06/08/2009
+
| 2009-06-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 613: Line 445:
 
| 1894331
 
| 1894331
 
| Primary Facility
 
| Primary Facility
| 06/23/2010
+
| 2010-06-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 620: Line 452:
 
| 1911499
 
| 1911499
 
| Primary Facility
 
| Primary Facility
| 08/12/2010
+
| 2010-08-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 627: Line 459:
 
| 1911504
 
| 1911504
 
| Primary Facility
 
| Primary Facility
| 08/13/2010
+
| 2010-08-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 634: Line 466:
 
| 1913729
 
| 1913729
 
| Primary Facility
 
| Primary Facility
| 08/31/2010
+
| 2010-08-31
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 641: Line 473:
 
| 1917078
 
| 1917078
 
| Primary Facility
 
| Primary Facility
| 09/10/2010
+
| 2010-09-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 648: Line 480:
 
| 1927871
 
| 1927871
 
| Primary Facility
 
| Primary Facility
| 10/25/2010
+
| 2010-10-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 655: Line 487:
 
| 1930577
 
| 1930577
 
| Primary Facility
 
| Primary Facility
| 11/02/2010
+
| 2010-11-02
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 662: Line 494:
 
| 1930583
 
| 1930583
 
| Primary Facility
 
| Primary Facility
| 11/04/2010
+
| 2010-11-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 669: Line 501:
 
| 1931252
 
| 1931252
 
| Primary Facility
 
| Primary Facility
| 11/17/2010
+
| 2010-11-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 676: Line 508:
 
| 1933219
 
| 1933219
 
| Primary Facility
 
| Primary Facility
| 11/16/2010
+
| 2010-11-16
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 683: Line 515:
 
| 1933225
 
| 1933225
 
| Primary Facility
 
| Primary Facility
| 11/10/2010
+
| 2010-11-10
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 690: Line 522:
 
| 1934239
 
| 1934239
 
| Primary Facility
 
| Primary Facility
| 11/29/2010
+
| 2010-11-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 697: Line 529:
 
| 1947185
 
| 1947185
 
| Primary Facility
 
| Primary Facility
| 01/10/2011
+
| 2011-01-10
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 704: Line 536:
 
| 1953924
 
| 1953924
 
| Primary Facility
 
| Primary Facility
| 01/18/2011
+
| 2011-01-18
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 711: Line 543:
 
| 1958587
 
| 1958587
 
| Primary Facility
 
| Primary Facility
| 02/10/2011
+
| 2011-02-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 718: Line 550:
 
| 1959388
 
| 1959388
 
| Primary Facility
 
| Primary Facility
| 03/02/2011
+
| 2011-03-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 725: Line 557:
 
| 1961862
 
| 1961862
 
| Primary Facility
 
| Primary Facility
| 03/18/2011
+
| 2011-03-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 732: Line 564:
 
| 1976478
 
| 1976478
 
| Primary Facility
 
| Primary Facility
| 04/20/2011
+
| 2011-04-20
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 739: Line 571:
 
| 1991679
 
| 1991679
 
| Primary Facility
 
| Primary Facility
| 07/08/2011
+
| 2011-07-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 746: Line 578:
 
| 1998348
 
| 1998348
 
| Primary Facility
 
| Primary Facility
| 08/04/2011
+
| 2011-08-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 753: Line 585:
 
| 2016814
 
| 2016814
 
| Primary Facility
 
| Primary Facility
| 10/24/2011
+
| 2011-10-24
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 760: Line 592:
 
| 2018633
 
| 2018633
 
| Primary Facility
 
| Primary Facility
| 11/08/2011
+
| 2011-11-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 767: Line 599:
 
| 2027550
 
| 2027550
 
| Primary Facility
 
| Primary Facility
| 12/14/2011
+
| 2011-12-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 774: Line 606:
 
| 2027590
 
| 2027590
 
| Primary Facility
 
| Primary Facility
| 11/28/2011
+
| 2011-11-28
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 781: Line 613:
 
| 2035166
 
| 2035166
 
| Primary Facility
 
| Primary Facility
| 01/12/2012
+
| 2012-01-12
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 788: Line 620:
 
| 2055003
 
| 2055003
 
| Primary Facility
 
| Primary Facility
| 03/15/2012
+
| 2012-03-15
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 795: Line 627:
 
| 2074517
 
| 2074517
 
| Primary Facility
 
| Primary Facility
| 06/04/2012
+
| 2012-06-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 802: Line 634:
 
| 2085868
 
| 2085868
 
| Primary Facility
 
| Primary Facility
| 07/16/2012
+
| 2012-07-16
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 809: Line 641:
 
| 2097396
 
| 2097396
 
| Primary Facility
 
| Primary Facility
| 08/27/2012
+
| 2012-08-27
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 816: Line 648:
 
| 2110934
 
| 2110934
 
| Primary Facility
 
| Primary Facility
| 10/25/2012
+
| 2012-10-25
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 823: Line 655:
 
| 2156445
 
| 2156445
 
| Primary Facility
 
| Primary Facility
| 04/01/2013
+
| 2013-04-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 830: Line 662:
 
| 2198789
 
| 2198789
 
| Primary Facility
 
| Primary Facility
| 07/11/2013
+
| 2013-07-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 837: Line 669:
 
| 2238536
 
| 2238536
 
| Primary Facility
 
| Primary Facility
| 01/08/2014
+
| 2014-01-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 844: Line 676:
 
| 2413403
 
| 2413403
 
| Primary Facility
 
| Primary Facility
| 08/31/2015
+
| 2015-08-31
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 851: Line 683:
 
| 2422357
 
| 2422357
 
| Primary Facility
 
| Primary Facility
| 10/28/2015
+
| 2015-10-28
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 893: Line 725:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:45, 19 August 2019

Well Details

Well ID: 37-003-21982
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Frazer Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 146376
Farm/Lease Name: YUTE UNIT 4H
License Status: Active
Spud Date: 2009-02-03
Permit Date: 2008-10-03
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.572278
Longitude: -79.807056

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2009 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2010 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 RANGE RESOURCES APPALACHIA LLC 583,550.00 81 0.00 0 10.00 81
2012 RANGE RESOURCES APPALACHIA LLC 784,415.93 349 0.00 0 0.00 0
2013 RANGE RESOURCES APPALACHIA LLC 625,822.38 338 0.00 0 0.00 0
2014 RANGE RESOURCES APPALACHIA LLC 340,996.97 364 0.00 0 0.00 0
2015 RANGE RESOURCES APPALACHIA LLC 262,330.22 365 0.00 0 0.00 0
2016 RANGE RESOURCES APPALACHIA LLC 177,338.67 346 0.00 0 0.00 0
2017 RANGE RESOURCES APPALACHIA LLC 154,198.10 364 0.00 0 0.00 0
2018 RANGE RESOURCES APPALACHIA LLC 128,957.99 269 0.00 0 0.00 0
2019 RANGE RESOURCES APPALACHIA LLC 45,197.97 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 RANGE RESOURCES APPALACHIA LLC Drilling 3,827.00 Bbl Other
2011 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) 1,090.48 Bbl REUSE OTHER THAN ROAD SPREADING
2011 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) 2,211.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2012 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste (in Tons) 7.11 Tons LANDFILL 100277
2013 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) 1,045.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) 687.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) 140.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) 480.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) 241.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 324.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 106.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 198.10 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 94.72 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 18.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 11.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 25.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 174.25 Bbl REUSE (AT WELL PAD)
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 77.79 Bbl REUSE (AT WELL PAD)
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 11.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 43.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 18.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 45.77 Bbl REUSE (AT WELL PAD)
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes (in Barrels) RWC 899 9.52 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1785102 Primary Facility 2009-04-16 Routine/Complete Inspection No Violations Noted The marcellus well is not in production at the time of the inspection. The initial phase of drilling (top hole) appears to be completed. The below grade pit has been properly installed and is maintaining the 2 feet of freeboard. There is no accelerated erosion and sedimentation noted on the access road or well site. It is recommended that the operator seed and mulch the well site and continue to monitor the access road and well site for erosion and sedimentation. Accompanied Greg Higgins for training.
1785668 Primary Facility 2009-04-09 Drilling/Alteration No Violations Noted Marcellus Well, verticle to 7105, e/s ok
1803413 Primary Facility 2009-06-08 Routine/Complete Inspection No Violations Noted Drilling was completed on 2/18/09
1894331 Primary Facility 2010-06-23 Routine/Complete Inspection No Violations Noted On June 23rd, 2010 I met with Range Resources E&S Supervisor Jeremy Matinko to discuss the encapsulated drill cuttings on site. Due to expansion of the dril pad the pit would need to be uncovered and the drill cuttings moved. It was decided that when uncovered the previous drill cuttings would be hauled and disposed of offsite. The site was currently under construction. E&S controls were in place according to the most recent ESCGP-1. The access road was in good condition. A site ID and E&S plan were posted on site.
1911499 Primary Facility 2010-08-12 Routine/Complete Inspection No Violations Noted On August 12th, 2010 I conducted a routine inspection of the above site. Frazer township had received 4.41" of rain the previous night. Some gravel from the access road had been washed onto the public roadway. Due to the large amount of rain, various portions of the E&S controls needed repair. No sediment was leaving site however. The super silt fence at the front of the site surrounding the top soil piles was becoming overtaken. Portions of filter sock inside the silt fence were undermined and sediment was piling up. The interceptor channels at the rear of the pad were damaged. Erosion blanket had slid off the fill slope and into the sediment trap. The sediment trap also was filling and needed cleaned. Arrangements were made to meet the operator the next morning and a street sweeper was dispatched to the site.
1911504 Primary Facility 2010-08-13 Routine/Complete Inspection No Violations Noted On August 13th, 2010 I met with Range Resources representatives Jeremy Matinko on site to discuss repairs needed noted in the 8/12/2010 inspection. A street sweeper was on site the night before and had cleaned the public roadway. Silt fence and filter sock repairs were taking place immediately. The other repairs would be scheduled as soon as the soil would become dry enough for heavy equipment to work on.
1913729 Primary Facility 2010-08-31 Routine/Complete Inspection No Violations Noted On August 31th, 2010 I met with Range Resources representative Jeremy Matinko on site to discuss repairs as a result of the storm event noted in the 8/12/2010 inspection. The sediment trap and interceptor channels had been restored to plan specifications. The silt fence had been repaired and other sections have had the sediment piled against it removed. Additional filter sock and rock filters have been added to the site in several locations. The access road was now in good condition.
1917078 Primary Facility 2010-09-10 Routine/Complete Inspection No Violations Noted On September 10th, 2010 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. A wireline rig was set up on the well and crews were setting up to pull the 4-1/2" casing in preparation for the redrill.
1927871 Primary Facility 2010-10-25 Drilling/Alteration No Violations Noted MARCELLUS WELL. DRILLED TO 7300' AND CEMENTED BACK TO KOP. PATTERSON RIG IS BEING BUILT. SITE, E&S, AND ACCESS OK.
1930577 Primary Facility 2010-11-02 Drilling/Alteration No Violations Noted PATTERSON 325 IS DRILLING THIS HORIZONTAL MARCELLUS WELL. SITE WILL BE EXPANDED FOR FRAC TANKS.
1930583 Primary Facility 2010-11-04 Drilling/Alteration No Violations Noted PATTERSON RIG 325 DRILLING HORIZONTAL LEG OF THIS MARCELLUS WELL. KOP @ 5833'. T.D. @ 9850'. CREW PULLING DRILL RODS AND THEN WILL RUN 5 1/2" CASING. SITE, E&S, AND ACCESS, OK.
1931252 Primary Facility 2010-11-17 Routine/Complete Inspection No Violations Noted On November 17th, 2010 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. The redrill had been completed. Construction for the tank pad was completed and frac tanks were being delivered. Crews were on site prepping for the upcoming frac.
1933219 Primary Facility 2010-11-16 Drilling/Alteration No Violations Noted MARCELLUS HOIZONTAL WELL. PATTERSON RIG IS GONE. CREW WORKING ON THE WELL HEAD. AREA FOR FRAC TANKS UNDER CONSTRUCTION.
1933225 Primary Facility 2010-11-10 Drilling/Alteration No Violations Noted 5" IS CEMENTED. RIG IS BEING DISMANTLED. THE SITE IS BEING PREPARED FOR FRAC.
1934239 Primary Facility 2010-11-29 Drilling/Alteration No Violations Noted FRAC TECH ON SITE SETTING UPTO FRAC THIS HORIZONTAL MARCELLUS WELL.
1947185 Primary Facility 2011-01-10 Drilling/Alteration No Violations Noted SITE, E&S, AND ACCESS, OK. MARCELLUS WELL IS BEING FLARED. SITE IS FENCED AND SECURITY IS PRESENT.
1953924 Primary Facility 2011-01-18 Drilling/Alteration No Violations Noted WELL IS COMPLETE. THE FLARESTACK HAS BEEN REMOVED.
1958587 Primary Facility 2011-02-10 Routine/Complete Inspection No Violations Noted On February 10th, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. Some routine maintenance of E&S controls is required in a few areas. The redrill and frac had been completed. No spills/ leaks or accelerated erosion were observed at the time of inspection.
1959388 Primary Facility 2011-03-02 Routine/Complete Inspection No Violations Noted On March 2nd, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. Some routine maintenance of E&S controls is required in a few areas: silt fence and control blankets along the tank pad. The redrill and frac had been completed. No spills/ leaks or accelerated erosion were observed at the time of inspection. .
1961862 Primary Facility 2011-03-18 Routine/Complete Inspection No Violations Noted On March 18th, 2011 I visited this site as a routine inspection. The access road was in good condition. Site ID and E&S plan were posted on site. E&S controls were in place according to the ESCGP-1 and functioning properly. 2 frac tanks were left on site. The redrill and frac had been completed, but the well was not yet in production. No spills/ leaks or accelerated erosion were observed at the time of inspection. .
1976478 Primary Facility 2011-04-20 Drilling/Alteration No Violations Noted THIS MARCELLUS WELL IS DRILLED AND FRACED, BUT NOT
1991679 Primary Facility 2011-07-08 Drilling/Alteration No Violations Noted WELL IS COMPLETE. SITE AND E&S, OK. ACCESS IS GATED. SITE WILL BE CHANGED FOR MORE WELLS.
1998348 Primary Facility 2011-08-04 Drilling/Alteration No Violations Noted WELLCOMPLETE. THE SITE IS BEING REBUILT TO ADD MORE WELLS.
2016814 Primary Facility 2011-10-24 Drilling/Alteration No Violations Noted WELL IS COMPLETE.
2018633 Primary Facility 2011-11-08 Drilling/Alteration No Violations Noted WELL IS DRILLED AND FRACED.
2027550 Primary Facility 2011-12-14 Drilling/Alteration No Violations Noted WELL COMPLETE AND PRODUCING. WELL IS FENCED. E&S OK.
2027590 Primary Facility 2011-11-28 Drilling/Alteration No Violations Noted WELL IS COMPLETE AND PRODUCING. WELL IS FENCED.
2035166 Primary Facility 2012-01-12 Drilling/Alteration No Violations Noted THIS WELL IS COMPLETE AND HOOKED UP FOR PRODUCTION.
2055003 Primary Facility 2012-03-15 Drilling/Alteration No Violations Noted THIS WELL IS COMPLETE AND PRODUCING.
2074517 Primary Facility 2012-06-04 Drilling/Alteration No Violations Noted DRILLING COMPLETE AND WELL IS FRACED. WELL IS HOOKED UP AND PRODUCING.
2085868 Primary Facility 2012-07-16 Drilling/Alteration No Violations Noted WELL IS PRODUCING. RESTORATION IN PROGRESS.
2097396 Primary Facility 2012-08-27 Drilling/Alteration No Violations Noted THIS WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED.
2110934 Primary Facility 2012-10-25 Site Restoration No Violations Noted John Ley WQS, SWRO was on site to conduct a restoration inspection. At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security. Drilling had been completed and the well appeared to be equipped for production.
2156445 Primary Facility 2013-04-01 Routine/Complete Inspection No Violations Noted WELL IS HOOKED UP AND PRODUCING. THE SITE IS RESTORED. THE PAD IS FENCED AND LOCKED.
2198789 Primary Facility 2013-07-11 Routine/Complete Inspection No Violations Noted The site for this well has been restored. Permanent stabilization appeared adequate. Brine tanks appeared in good condition. Water in containment around tanks was clear with no oil sheen. Well was properly labeled. No erosion or sedimentation issues were noted.
2238536 Primary Facility 2014-01-08 Routine/Complete Inspection No Violations Noted The well site has been restored and appeared equipped for production. Light snow cover at time of inspection. Well was properly labeled; brine tanks appeared to be in good condition. Permanent stabilization appeared to be good with no apparent erosion or sedimentation issues.
2413403 Primary Facility 2015-08-31 Complaint Inspection No Violations Noted On 8/31/15, water samples were taken from the basement tap prior to treatment for 946 analysis in response to complaint 314344.
2422357 Primary Facility 2015-10-28 Administrative/File Review No Violations Noted Administrative review of lab results on 10/28/15 indicates that the water supply does not appear to have been impacted by oil & gas activity. Results and documentation forwarded for final determination.
2682672 Primary Facility 2018-01-16 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well apparatus, gas production unit and brine tank appear to be in sound condition. At the time of inspection the well site was covered with snow. The Department will follow up in the spring of 2018 to evaluated the disturbed areas.

For data sources see[6]

References