X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-37139"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-37139
 
| Well ID: 37-063-37139
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.458672, -79.135294 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.458672, -79.135294 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/10/2011
+
| Spud Date: 2011-08-10
 
|-
 
|-
| Permit Date: 6/17/2011
+
| Permit Date: 2011-06-17
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 147: Line 172:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 75.00 Bbl
 
| style="text-align: right;" | 75.00 Bbl
Line 153: Line 178:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
Line 159: Line 184:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 165: Line 190:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 190: Line 215:
 
| 1997382
 
| 1997382
 
| Primary Facility
 
| Primary Facility
| 08/12/2011
+
| 2011-08-12
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 197: Line 222:
 
| 1997791
 
| 1997791
 
| Primary Facility
 
| Primary Facility
| 08/17/2011
+
| 2011-08-17
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 204: Line 229:
 
| 1998796
 
| 1998796
 
| Primary Facility
 
| Primary Facility
| 08/25/2011
+
| 2011-08-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 211: Line 236:
 
| 2113598
 
| 2113598
 
| Primary Facility
 
| Primary Facility
| 10/24/2012
+
| 2012-10-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 218: Line 243:
 
| 2215338
 
| 2215338
 
| Primary Facility
 
| Primary Facility
| 12/28/2012
+
| 2012-12-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 225: Line 250:
 
| 2215341
 
| 2215341
 
| Primary Facility
 
| Primary Facility
| 10/01/2013
+
| 2013-10-01
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 232: Line 257:
 
| 2342810
 
| 2342810
 
| Primary Facility
 
| Primary Facility
| 02/10/2015
+
| 2015-02-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 281: Line 306:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 03:44, 1 August 2019

Well Details

Well ID: 37-063-37139
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: HARBISON 3
License Status: Active
Spud Date: 2011-08-10
Permit Date: 2011-06-17
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.458672
Longitude: -79.135294

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 0.00 0 0.00 0 0.00 0
2012 PENN VIEW EXPLORATION CORP 23,150.00 365 0.00 0 0.00 0
2013 PENN VIEW EXPLORATION CORP 16,804.00 365 0.00 0 0.00 0
2014 PENN VIEW EXPLORATION CORP 10,765.00 365 0.00 0 0.00 0
2015 PENN VIEW EXPLORATION CORP 9,127.00 365 0.00 0 0.00 0
2016 PENN VIEW EXPLORATION CORP 7,912.00 365 0.00 0 0.00 0
2017 PENN VIEW EXPLORATION CORP 6,370.00 365 0.00 0 0.00 0
2018 PENN VIEW EXPLORATION CORP 5,541.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-A00 Produced Fluid (in Barrels) 75.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013-A00 Produced Fluid (in Barrels) 120.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014-A00 Produced Fluid (in Barrels) 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016-A00 Produced Fluid (in Barrels) RWC 802 40.00 Bbl ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1997382 Primary Facility 2011-08-12 Drilling/Alteration No Violations Noted Currently, PC Rig #5 contracted by Penn View (Wayne Brannon ¿ tool pusher). Filter fence located topographically down gradient of site pad. During site inspection, no E&S or IW issues at the site. PC was in the process of setting up the drilling equipment.
1997791 Primary Facility 2011-08-17 Drilling/Alteration No Violations Noted Currently, PC Rig #5 contracted by Penn View (Wayne Brannon ¿ tool pusher). Filter fence located topographically down gradient of site pad. During site inspection, no E&S or IW issues at the site. Conductor pipe (13¿) set at 34¿ (sanded in place). Water protection (9¿) set at 465 ft. and cemented with 160 sks of Class A. Plug was down at 5:30 pm with 15 bbls return. Basket was set at 126 ft. due to potential of loss of circulation with water recorded at 165 ft. (5 gpm), 285 ft. (20 gpm) and 395 ft. (10 gpm). Current depth was 1040 ft. PC was going to set surface casing (7¿) at 1220 ft
1998796 Primary Facility 2011-08-25 Drilling/Alteration No Violations Noted Currently, PC Rig #5 contracted by Penn View (Wayne Brannon ¿ tool pusher). Filter fence located topographically down gradient of site pad. During site inspection, no E&S or IW issues at the site. Well completed. Well head completed with 4¿ swag. Pit contained drill cuttings and fluid.
2113598 Primary Facility 2012-10-24 Routine/Complete Inspection No Violations Noted During site inspection, no E&S issues were present at the site. Gas well was in production.
2215338 Primary Facility 2012-12-28 Routine/Complete Inspection No Violations Noted At time of inspection, well in production. Well tag present. Brine tank appeared sound. Restoration deadline: 5-19-12 Site snow-covered; therefore, unable to adequately determine site restoration in relation to well site and access road although no E&S issues were noted. In the spring, a follow-up inspection will be conducted to determine final restoration.
2215341 Primary Facility 2013-10-01 Site Restoration No Violations Noted Restr inspt. At time of inspection, well in production. Well tag present. Brine tank sound. Access road in good condition. No accelerated erosion or sedimentation issues observed in relation to well site or access road.
2342810 Primary Facility 2015-02-10 Routine/Complete Inspection No Violations Noted During site inspection, no E&S issues were present at the site. Gas well was in production.
2493037 Primary Facility 2016-06-14 Routine/Complete Inspection No Violations Noted system running. no issues
2518611 Primary Facility 2016-09-07 Routine/Complete Inspection No Violations Noted system running. no issues

For data sources see[6]

References