X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-37291"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-37291
 
| Well ID: 37-063-37291
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.435056, -79.127544 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.435056, -79.127544 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 02/09/2012
+
| Spud Date: 2012-02-09
 
|-
 
|-
| Permit Date: 12/28/2011
+
| Permit Date: 2011-12-28
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 74: Line 99:
 
| style="text-align: right;" | 184
 
| style="text-align: right;" | 184
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 119: Line 144:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 128: Line 153:
 
| style="text-align: right;" | 242
 
| style="text-align: right;" | 242
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 147: Line 172:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 295.00 Bbl
 
| style="text-align: right;" | 295.00 Bbl
Line 153: Line 178:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 456.00 Bbl
 
| style="text-align: right;" | 456.00 Bbl
Line 159: Line 184:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 250.00 Bbl
 
| style="text-align: right;" | 250.00 Bbl
Line 165: Line 190:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 91.00 Bbl
 
| style="text-align: right;" | 91.00 Bbl
Line 171: Line 196:
 
|  
 
|  
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 177: Line 202:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 202: Line 227:
 
| 2041291
 
| 2041291
 
| Primary Facility
 
| Primary Facility
| 02/08/2012
+
| 2012-02-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 209: Line 234:
 
| 2042702
 
| 2042702
 
| Primary Facility
 
| Primary Facility
| 02/14/2012
+
| 2012-02-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 216: Line 241:
 
| 2043974
 
| 2043974
 
| Primary Facility
 
| Primary Facility
| 02/16/2012
+
| 2012-02-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 223: Line 248:
 
| 2043985
 
| 2043985
 
| Primary Facility
 
| Primary Facility
| 02/16/2012
+
| 2012-02-16
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 230: Line 255:
 
| 2048847
 
| 2048847
 
| Primary Facility
 
| Primary Facility
| 03/06/2012
+
| 2012-03-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 237: Line 262:
 
| 2151616
 
| 2151616
 
| Primary Facility
 
| Primary Facility
| 03/20/2013
+
| 2013-03-20
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 272: Line 297:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 03:48, 1 August 2019

Well Details

Well ID: 37-063-37291
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: ST CLAIR 2
License Status: Active
Spud Date: 2012-02-09
Permit Date: 2011-12-28
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.435056
Longitude: -79.127544

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 0.00 0 0.00 0 0.00 0
2012 PENN VIEW EXPLORATION CORP 4,567.00 184 0.00 0 0.00 0
2013 PENN VIEW EXPLORATION CORP 6,095.00 365 0.00 0 0.00 0
2014 PENN VIEW EXPLORATION CORP 4,709.00 365 0.00 0 0.00 0
2015 PENN VIEW EXPLORATION CORP 3,738.00 365 0.00 0 0.00 0
2016 PENN VIEW EXPLORATION CORP 2,003.00 365 0.00 0 0.00 0
2017 PENN VIEW EXPLORATION CORP 540.00 334 0.00 0 0.00 0
2018 PENN VIEW EXPLORATION CORP 404.00 242 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-A00 Produced Fluid (in Barrels) 295.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013-A00 Produced Fluid (in Barrels) 456.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014-A00 Produced Fluid (in Barrels) 250.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014-A00 Produced Fluid (in Barrels) 91.00 Bbl ROAD SPREADING
2016-A00 Produced Fluid (in Barrels) RWC 802 40.00 Bbl ROAD SPREADING
2017-A00 Produced Fluid (in Barrels) RWC 802 100.00 Bbl ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2041291 Primary Facility 2012-02-08 Routine/Complete Inspection No Violations Noted Site visit was due to spud notification.
2042702 Primary Facility 2012-02-14 Drilling/Alteration No Violations Noted First Class Energy was contracted by Penn View (Wayne Brannon ¿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water was recorded at 200 feet. Water Protection pipe (9 5/8¿) was set at 421¿. Pipe was cemented with 150 sacks of Class A with 15 bbls of return. Plug was down at 9:10 am on 2/10/12. Surface pipe (7¿) was set at 1,117 feet with 185 sacks of Class A with 10 bbls return. Plug was down at 9:52 pm on 2/13/12. First Class Energy was currently drilling at 1, 300 feet. The anticipated total depth for the well was 4,745 feet.
2043974 Primary Facility 2012-02-16 Routine/Complete Inspection No Violations Noted First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe.
2043985 Primary Facility 2012-02-16 Drilling/Alteration No Violations Noted First Class Energy was contracted by Penn View (Wayne Brannon – tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe.
2048847 Primary Facility 2012-03-06 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2151616 Primary Facility 2013-03-20 Drilling/Alteration No Violations Noted First Class Energy was contracted by Penn View . Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Conductor pipe (20 “) was set at 35 feet and was sanded in. Water was recorded at 60 feet and 540 feet. Water Protection pipe (9 5/8”) was set at 431’. Pipe was cemented with 176 sacks of Class A with 12 bbl. of return. Plug was down at 9:01 am on 3/18/13. Surface pipe (7”) was set at 1,179 feet with 200 sacks of Class A with 12 bbl. return. Plug was down at 8:52 pm on 3/19/13. The anticipated total depth for the well was 4,975 feet.

For data sources see[6]

References