X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-033-21749"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-033-21749
 
| Well ID: 37-033-21749
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.946111, -78.744611 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.946111, -78.744611 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 12/30/1983
+
| Spud Date: 1983-12-30
 
|-
 
|-
| Permit Date: 12/16/1983
+
| Permit Date: 1983-12-16
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 86:
 
|-
 
|-
 
| 1986
 
| 1986
| style="text-align: right;" |
+
| [[ADOBE RESOURCES CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987
 
| 1987
Line 74: Line 99:
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988
 
| 1988
Line 83: Line 108:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1989
 
| 1989
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991
 
| 1991
Line 101: Line 126:
 
| style="text-align: right;" | 205
 
| style="text-align: right;" | 205
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 978.00
 
| style="text-align: right;" | 978.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 708.00
 
| style="text-align: right;" | 708.00
 
| style="text-align: right;" | 303
 
| style="text-align: right;" | 303
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 290.00
 
| style="text-align: right;" | 290.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 242.00
 
| style="text-align: right;" | 242.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 450.00
 
| style="text-align: right;" | 450.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 425.00
 
| style="text-align: right;" | 425.00
 
| style="text-align: right;" | 325
 
| style="text-align: right;" | 325
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 368.00
 
| style="text-align: right;" | 368.00
 
| style="text-align: right;" | 290
 
| style="text-align: right;" | 290
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 284.00
 
| style="text-align: right;" | 284.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 190.00
 
| style="text-align: right;" | 190.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 105.00
 
| style="text-align: right;" | 105.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 37.00
 
| style="text-align: right;" | 37.00
 
| style="text-align: right;" | 70
 
| style="text-align: right;" | 70
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 48.00
 
| style="text-align: right;" | 48.00
 
| style="text-align: right;" | 274
 
| style="text-align: right;" | 274
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| [[EASTERN AMER ENERGY CORP]]
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 25.00
 
| style="text-align: right;" | 25.00
 
| style="text-align: right;" | 274
 
| style="text-align: right;" | 274
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 236: Line 261:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 245: Line 270:
 
| style="text-align: right;" | 217
 
| style="text-align: right;" | 217
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 254: Line 279:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 263: Line 288:
 
| style="text-align: right;" | 247
 
| style="text-align: right;" | 247
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 272: Line 297:
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
| style="text-align: right;" |
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
| style="text-align: right;" |
+
| [[ENERGY CORP OF AMER]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
| style="text-align: right;" |
+
| [[GREYLOCK CONVENTIONAL LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
| style="text-align: right;" |
+
| [[GREYLOCK CONVENTIONAL LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 322: Line 347:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 327: Line 353:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1996-0
+
| 1996
 +
| [[ENERGY CORP OF AMER]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
Line 372: Line 399:
 
!scope="col" | Penalty Amount
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
|-
 
|}-->
 
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
 
|-
 
|-
 
|}-->
 
|}-->

Revision as of 23:29, 21 August 2019

Well Details

Well ID: 37-033-21749
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Bell Township
Operator Name: GREYLOCK CONVENTIONAL LLC
Well Pad ID:
Farm/Lease Name: KATHRYN PARRISH B1
License Status: Active
Spud Date: 1983-12-30
Permit Date: 1983-12-16
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.946111
Longitude: -78.744611

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1986 ADOBE RESOURCES CORP 0.00 0 0.00 0 0.00 0
1987 ADOBE RESOURCES CORP 7,402.00 270 0.00 0 0.00 0
1988 ADOBE RESOURCES CORP 5,586.00 366 0.00 0 0.00 0
1989 ADOBE RESOURCES CORP 3,963.00 365 0.00 0 0.00 0
1991 ADOBE RESOURCES CORP 1,768.00 205 0.00 0 0.00 0
1996 ENERGY CORP OF AMER 978.00 365 0.00 0 0.00 0
1997 ENERGY CORP OF AMER 708.00 303 0.00 0 0.00 0
1998 ENERGY CORP OF AMER 601.00 335 0.00 0 0.00 0
1999 ENERGY CORP OF AMER 290.00 365 0.00 0 0.00 0
2000 ENERGY CORP OF AMER 242.00 366 0.00 0 0.00 0
2001 ENERGY CORP OF AMER 450.00 365 0.00 0 0.00 0
2002 ENERGY CORP OF AMER 425.00 325 0.00 0 0.00 0
2003 ENERGY CORP OF AMER 368.00 290 0.00 0 0.00 0
2004 ENERGY CORP OF AMER 284.00 366 0.00 0 0.00 0
2005 ENERGY CORP OF AMER 190.00 365 0.00 0 0.00 0
2006 ENERGY CORP OF AMER 105.00 365 0.00 0 0.00 0
2007 ENERGY CORP OF AMER 37.00 70 0.00 0 0.00 0
2008 ENERGY CORP OF AMER 48.00 274 0.00 0 0.00 0
2009 ENERGY CORP OF AMER 25.00 274 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 50.00 365 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 203.00 217 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 50.00 335 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 53.00 247 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 20.00 13 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 0.00 0 0.00 0 0.00 0
2016 ENERGY CORP OF AMER 0.00 0 0.00 0 0.00 0
2017 GREYLOCK CONVENTIONAL LLC 0.00 0 0.00 0 0.00 0
2018 GREYLOCK CONVENTIONAL LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1996 ENERGY CORP OF AMER Brine 50.00 Bbl Brine or Industrial Waste Treatment Plt PA 0026310

For data sources see[5]

References