X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-44603"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-44603
 
| Well ID: 37-121-44603
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.423685, -79.776882 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.423685, -79.776882 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/27/2010
+
| Spud Date: 2010-08-27
 
|-
 
|-
| Permit Date: 3/9/2010
+
| Permit Date: 2010-03-09
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 99.44
 
| style="text-align: right;" | 99.44
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 153.41
 
| style="text-align: right;" | 153.41
 
| style="text-align: right;" | 242
 
| style="text-align: right;" | 242
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 111.93
 
| style="text-align: right;" | 111.93
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 119.00
 
| style="text-align: right;" | 119.00
 
| style="text-align: right;" | 273
 
| style="text-align: right;" | 273
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 62.90
 
| style="text-align: right;" | 62.90
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 67.00
 
| style="text-align: right;" | 67.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 61.00
 
| style="text-align: right;" | 61.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 51.06
 
| style="text-align: right;" | 51.06
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 199: Line 224:
 
| 1910588
 
| 1910588
 
| Primary Facility
 
| Primary Facility
| 09/01/2010
+
| 2010-09-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 206: Line 231:
 
| 1940048
 
| 1940048
 
| Primary Facility
 
| Primary Facility
| 12/29/2010
+
| 2010-12-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 213: Line 238:
 
| 1955318
 
| 1955318
 
| Primary Facility
 
| Primary Facility
| 03/07/2011
+
| 2011-03-07
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 220: Line 245:
 
| 1993721
 
| 1993721
 
| Primary Facility
 
| Primary Facility
| 08/04/2011
+
| 2011-08-04
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 239: Line 264:
 
| 602211
 
| 602211
 
| 12/29/2010
 
| 12/29/2010
| 03/07/2011
+
| 2010-12-29
 
| 212WELLRCD - Failure to submit well record within 30 days of completion of drilling
 
| 212WELLRCD - Failure to submit well record within 30 days of completion of drilling
 
| Administrative
 
| Administrative
Line 247: Line 272:
 
| 606055
 
| 606055
 
| 03/07/2011
 
| 03/07/2011
| 08/04/2011
+
| 2011-03-07
 
| 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment.
 
| 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment.
 
| Administrative
 
| Administrative
Line 269: Line 294:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/04/2011
+
| 2011-08-04
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 278: Line 303:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/04/2011
+
| 2011-08-04
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 289: Line 314:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 05:44, 1 August 2019

Well Details

Well ID: 37-121-44603
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Sugarcreek Borough
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: PRITCHARD 8
License Status: Active
Spud Date: 2010-08-27
Permit Date: 2010-03-09
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.423685
Longitude: -79.776882

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 0.00 0 0.00 0 0.00 0
2009 0.00 0 0.00 0 0.00 0
2010 0.00 0 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 0.00 0 99.44 214 0.00 0
2012 DANNIC ENERGY CORP 0.00 0 153.41 242 0.00 0
2013 DANNIC ENERGY CORP 0.00 0 111.93 214 0.00 0
2014 DANNIC ENERGY CORP 0.00 0 119.00 273 0.00 0
2015 DANNIC ENERGY CORP 0.00 0 62.90 365 0.00 0
2016 DANNIC ENERGY CORP 0.00 0 67.00 366 0.00 0
2017 DANNIC ENERGY CORP 0.00 0 61.00 365 0.00 0
2018 DANNIC ENERGY CORP 0.00 0 51.06 365 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2014-A00 Produced Fluid (in Barrels) 90.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1910588 Primary Facility 2010-09-01 Drilling/Alteration No Violations Noted
1940048 Primary Facility 2010-12-29 Routine/Complete Inspection Violation(s) Noted
1955318 Primary Facility 2011-03-07 Follow-up Inspection Violation(s) Noted
1993721 Primary Facility 2011-08-04 Follow-up Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1940048 602211 12/29/2010 2010-12-29 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative
1955318 606055 03/07/2011 2011-03-07 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
602211 266698 NOV - Notice of Violation Comply/Closed 2011-08-04
606055 266698 NOV - Notice of Violation Comply/Closed 2011-08-04

For data sources see[6]

References