X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20180"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-20180
 
| Well ID: 37-081-20180
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.272247, -76.636592 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.272247, -76.636592 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 09/22/2009
+
| Spud Date: 2009-09-22
 
|-
 
|-
| Permit Date: 9/8/2009
+
| Permit Date: 2009-09-08
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 637: Line 662:
 
| 1832347
 
| 1832347
 
| Primary Facility
 
| Primary Facility
| 10/01/2009
+
| 2009-10-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 644: Line 669:
 
| 1871302
 
| 1871302
 
| Primary Facility
 
| Primary Facility
| 03/22/2010
+
| 2010-03-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 651: Line 676:
 
| 1884846
 
| 1884846
 
| Primary Facility
 
| Primary Facility
| 05/17/2010
+
| 2010-05-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 658: Line 683:
 
| 1899641
 
| 1899641
 
| Primary Facility
 
| Primary Facility
| 07/21/2010
+
| 2010-07-21
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 665: Line 690:
 
| 1929488
 
| 1929488
 
| Primary Facility
 
| Primary Facility
| 11/15/2010
+
| 2010-11-15
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 672: Line 697:
 
| 1942090
 
| 1942090
 
| Primary Facility
 
| Primary Facility
| 01/06/2011
+
| 2011-01-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 679: Line 704:
 
| 1965777
 
| 1965777
 
| Primary Facility
 
| Primary Facility
| 04/13/2011
+
| 2011-04-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 686: Line 711:
 
| 2051031
 
| 2051031
 
| Primary Facility
 
| Primary Facility
| 03/15/2012
+
| 2012-03-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 693: Line 718:
 
| 2051033
 
| 2051033
 
| Primary Facility
 
| Primary Facility
| 03/15/2012
+
| 2012-03-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 700: Line 725:
 
| 2056684
 
| 2056684
 
| Primary Facility
 
| Primary Facility
| 04/02/2012
+
| 2012-04-02
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 707: Line 732:
 
| 2069507
 
| 2069507
 
| Primary Facility
 
| Primary Facility
| 05/18/2012
+
| 2012-05-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 714: Line 739:
 
| 2072681
 
| 2072681
 
| Primary Facility
 
| Primary Facility
| 06/01/2012
+
| 2012-06-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 721: Line 746:
 
| 2076719
 
| 2076719
 
| Primary Facility
 
| Primary Facility
| 06/12/2012
+
| 2012-06-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 728: Line 753:
 
| 2092493
 
| 2092493
 
| Primary Facility
 
| Primary Facility
| 08/15/2012
+
| 2012-08-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 735: Line 760:
 
| 2100911
 
| 2100911
 
| Primary Facility
 
| Primary Facility
| 09/13/2012
+
| 2012-09-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 742: Line 767:
 
| 2436745
 
| 2436745
 
| Primary Facility
 
| Primary Facility
| 12/30/2015
+
| 2015-12-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 777: Line 802:
 
| 591556
 
| 591556
 
| 07/21/2010
 
| 07/21/2010
| 11/15/2010
+
| 2010-07-21
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| Administrative
 
| Administrative
Line 799: Line 824:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/31/2011
+
| 2011-08-31
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 810: Line 835:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 22:07, 1 August 2019

Well Details

Well ID: 37-081-20180
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 148314
Farm/Lease Name: FALK UNIT 2H
License Status: Active
Spud Date: 2009-09-22
Permit Date: 2009-09-08
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.272247
Longitude: -76.636592

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0 0.00 0 0.00 0
2010 CHIEF OIL & GAS LLC 500,438.50 145 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 652,323.00 305 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 745,004.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 548,895.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 465,597.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 349,288.00 309 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 172,772.00 223 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 11,541.00 144 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 135,708.00 201 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 18,950.00 34 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2009-A00 Drilling 1,514.00 Bbl Brine or Industrial Waste Treatment Plt PA0008451
2010-S02 Fracing Fluid Waste (in Barrels) 341.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010-S02 Produced Fluid (in Barrels) 623.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010-S02 Produced Fluid (in Barrels) 1,902.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010-S02 Produced Fluid (in Barrels) 842.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010-S02 Produced Fluid (in Barrels) 260.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2010-S02 Produced Fluid (in Barrels) 105.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2011-S01 Fracing Fluid Waste (in Barrels) 131.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011-S01 Fracing Fluid Waste (in Barrels) 131.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011-S01 Produced Fluid (in Barrels) 3,560.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011-S01 Produced Fluid (in Barrels) 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-S01 Produced Fluid (in Barrels) 833.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-S01 Produced Fluid (in Barrels) 238.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2011-S01 Produced Fluid (in Barrels) 1,190.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011-S01 Produced Fluid (in Barrels) 357.00 Bbl INJECTION DISPOSAL WELL PAS2D902BCLE
2011-S01 Produced Fluid (in Barrels) 845.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S02 Produced Fluid (in Barrels) 892.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2011-S02 Produced Fluid (in Barrels) 6,877.41 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011-S02 Produced Fluid (in Barrels) 595.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2012-S01 Drill Cuttings (in Tons) 33.94 Tons LANDFILL 301358
2012-S01 Fracturing Fluid Waste (in Tons) 407.67 Tons LANDFILL 301358
2012-S01 Produced Fluid (in Barrels) 6,317.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012-S02 Produced Fluid (in Barrels) 3,254.65 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012-S02 Produced Fluid (in Barrels) 273.80 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 2,540.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013-S02 Produced Fluid (in Barrels) 87.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC024
2013-S02 Produced Fluid (in Barrels) 469.02 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013-S02 Produced Fluid (in Barrels) 228.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2013-S02 Produced Fluid (in Barrels) 1,233.03 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014-S01 Produced Fluid (in Barrels) 493.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014-S01 Produced Fluid (in Barrels) 11.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-S01 Produced Fluid (in Barrels) 442.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014-S01 Produced Fluid (in Barrels) 219.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2014-S01 Produced Fluid (in Barrels) 21.90 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014-S02 Produced Fluid (in Barrels) 331.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014-S02 Produced Fluid (in Barrels) 212.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014-S02 Produced Fluid (in Barrels) 22.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-S02 Produced Fluid (in Barrels) 225.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014-S02 Produced Fluid (in Barrels) 121.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 119.50 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015-S01 Produced Fluid (in Barrels) 486.50 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015-S01 Produced Fluid (in Barrels) 11.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 537.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015-S02 Produced Fluid (in Barrels) 36.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2016-S01 Produced Fluid (in Barrels) RWC 802 693.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016-S02 Produced Fluid (in Barrels) RWC 802 522.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M01 Produced Fluid (in Barrels) RWC 802 57.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M02 Produced Fluid (in Barrels) RWC 802 35.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M03 Produced Fluid (in Barrels) RWC 802 70.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M04 Produced Fluid (in Barrels) RWC 802 27.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M05 Produced Fluid (in Barrels) RWC 802 10.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M06 Produced Fluid (in Barrels) RWC 802 22.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M09 Produced Fluid (in Barrels) RWC 802 106.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M10 Produced Fluid (in Barrels) RWC 802 42.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M11 Produced Fluid (in Barrels) RWC 802 53.50 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M12 Produced Fluid (in Barrels) RWC 802 60.50 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M01 Produced Fluid (in Barrels) RWC 802 40.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M01 Produced Fluid (in Barrels) RWC 802 40.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M02 Produced Fluid (in Barrels) RWC 802 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M03 Produced Fluid (in Barrels) RWC 802 135.50 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M03 Produced Fluid (in Barrels) RWC 802 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M04 Produced Fluid (in Barrels) RWC 802 146.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M05 Produced Fluid (in Barrels) RWC 802 83.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M05 Produced Fluid (in Barrels) RWC 802 75.80 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 152.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M07 Produced Fluid (in Barrels) RWC 802 109.50 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M08 Produced Fluid (in Barrels) RWC 802 161.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M09 Produced Fluid (in Barrels) RWC 802 106.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M10 Produced Fluid (in Barrels) RWC 802 43.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M11 Produced Fluid (in Barrels) RWC 802 32.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M12 Produced Fluid (in Barrels) RWC 802 161.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019-M01 Produced Fluid (in Barrels) RWC 802 124.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019-M02 Produced Fluid (in Barrels) RWC 802 62.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019-M03 Produced Fluid (in Barrels) RWC 802 10.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1832347 Primary Facility 2009-10-01 Drilling/Alteration No Violations Noted moving rig from falk unit #1h should spud oct 4-5 th
1871302 Primary Facility 2010-03-22 Routine/Complete Inspection No Violations Noted
1884846 Primary Facility 2010-05-17 Routine/Complete Inspection No Violations Noted
1899641 Primary Facility 2010-07-21 Routine/Partial Inspection Violation(s) Noted No well tag
1929488 Primary Facility 2010-11-15 Follow-up Inspection No Violations Noted
1942090 Primary Facility 2011-01-06 Routine/Complete Inspection No Violations Noted
1965777 Primary Facility 2011-04-13 Routine/Complete Inspection No Violations Noted
2051031 Primary Facility 2012-03-15 Routine/Complete Inspection No Violations Noted
2051033 Primary Facility 2012-03-15 Routine/Complete Inspection No Violations Noted
2056684 Primary Facility 2012-04-02 Routine/Partial Inspection No Violations Noted
2069507 Primary Facility 2012-05-18 Routine/Complete Inspection No Violations Noted
2072681 Primary Facility 2012-06-01 Drilling/Alteration No Violations Noted
2076719 Primary Facility 2012-06-12 Routine/Complete Inspection No Violations Noted
2092493 Primary Facility 2012-08-15 Routine/Complete Inspection No Violations Noted
2100911 Primary Facility 2012-09-13 Routine/Complete Inspection No Violations Noted
2436745 Primary Facility 2015-12-30 Routine/Complete Inspection No Violations Noted Arrived @ 11:40. Weather: foggy, cloudy, some fine drizzle. Five wells, formerly in production, were shut-in. Lease tender Bobby Hamel was onsite pumping rain water out of the containment around the produced water tank. All well cellars were filled with gravel. There were two open annular vents at each well. The 13-3/8” x 9-5/8” was vented with a 1” pipe. The 9-5/8” x 5-1/2” annulus was vented with a 2” pipe. The annuli were monitored with an Altair 5X gas meter calibrated on 12/28/15.
2543931 Primary Facility 2016-12-08 Routine/Complete Inspection No Violations Noted Routine Inspection; 12/8/2016. I entered the location at 10:06 and began the inspection. At the time of the inspection, the Falk Unit 1H (081-20144), 2H (081-20180), 3H (081-20205), 4H (20209) and 5H(081-20210)wells were in production. The well pad area was relatively well vegetated but some erosion was noted along the access road and one of the basins onsite was had a fair amount of standing water. The well site has not been restored and the Well Site Compliance Information Request reply (submitted 9/21/2015) says an ESCGP-2 was to be submitted in the fall of 2015. The well pad remains at its original size and the site currently does not conform to the permitted restoration plan. The original E&S permit has been expired since 10/16/2014.
 The Department considers a well site to be restored under Section 3216(c) of the 2012 Oil and Gas Act when the oil or gas owners or operators meet the following:
1. All permanent post construction stormwater control features as identified in the Post Construction
2774006 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Five wells staged for production phase. Five each water separators. The 2H well is using a sand separator. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Methanol tank in use on 2H well. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1899641 591556 07/21/2010 2010-07-21 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
591556 261031 NOV - Notice of Violation Comply/Closed 2011-08-31

For data sources see[6]

References