X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24838"

m
m
Line 15: Line 15:
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
 
|-
 
|-
| Well Pad ID: [[001486]]
+
| Well Pad ID: [[US-OH-001486]]
 
|-
 
|-
 
| Farm/Lease Name: ROLLAND E
 
| Farm/Lease Name: ROLLAND E
Line 21: Line 21:
 
| License Status: Producing
 
| License Status: Producing
 
|-
 
|-
| License Date: 2019-05-30
+
| License Date: 2018-07-20
 
|-
 
|-
 
| Spud Date: 2018-08-10
 
| Spud Date: 2018-08-10

Revision as of 01:03, 26 July 2019

Well Details

Well ID: 34-111-24838
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Green Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001486
Farm/Lease Name: ROLLAND E
License Status: Producing
License Date: 2018-07-20
Spud Date: 2018-08-10
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-09-06
Well Total Depth: 26275 ft
Configuration: Horizontal
Latitude: 39.666220608
Longitude: -81.00886082

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-07-20 Proposed Formations:UITCA/POINT PLEASANT, Issued Date:7/20/2018, Expired Date:7/19/2020 12:00:00 PM, Drilling unit acres:473.573, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-09-06
Correction to Well 2018-11-09 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2019-05-13
Correction to Well 2019-05-17 UPDATE TAKE POINT PER AS-PERFORATED PLAT
Record Last Modified 2019-05-31
Construction Permit Expires 2020-07-19

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-05-30 10360 10514 0
2019-05-30 26016 26120 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/13/2018 01/22/2019 10307 19,752,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (30/50 Resin Proppant) US Silica Proppant Silica Substrate 14808-60-7 99.5 0.255205 479816
Phenolic Resin 9003-35-4 0.5 0.00128244 2411.14
NEFE-180 Solvay Corrosion Inhibitor/Iron Control 2-Ethylhexanol 104-76-7 10 0.000153796 289.154
Fatty acids, tall oil 61790-12-3 5 0.00007690 144.577
Coconut oil acid diethanolamine 68603-42-9 5 0.00007690 144.577
Acetic acid 64-19-7 89 0.00136878 2573.47
2-Propyn-1-ol 107-19-7 5 0.00007690 144.577
Methanol 67-56-1 40 0.000615184 1156.62
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007690 144.577
Sand (40/70 Proppant) US Silica Proppant Silica Substrate 14808-60-7 100 9.73026 18,294,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Fatty acids, tall oil 61790-12-3 5 0.00007690 144.577
2-Propyn-1-ol 107-19-7 5 0.00007690 144.577
Coconut oil acid diethanolamine 68603-42-9 5 0.00007690 144.577
Phenolic Resin 9003-35-4 0.5 0.00128244 2411.14
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007690 144.577
Water 7732-18-5 64 0.157583 296273
Methanol 67-56-1 40 0.000615184 1156.62
2-Ethylhexanol 104-76-7 10 0.000153796 289.154
Hydrochloric Acid (28%) Solvay Acidizing Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0886402 166654
Water 7732-18-5 64 0.157583 296273
Water Eclipse Resources Carrier/Base Fluid Water 7732-18-5 100 87.6704 164,831,000.0
Sand (100 Mesh Proppant) US Silica Proppant Silica Substrate 14808-60-7 100 2.09507 3,938,980.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-11-13 H2O 28 10192 Bbl 450471 Keane Frac STAGE 1/78
2019-01-22 H2O 15 8334 Bbl 441250 STINGRAY PRESSURE PUMPING LLC STAGE 78/78

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 ECLIPSE RESOURCES I LP 789612 0 43

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 ECLIPSE RESOURCES I LP Brine 22270 43

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0037373359 2018-08-09 Drill / Deepen / Reopen No Violations On site inspection accompanied by ODNR Inspector Tom Thomas and Eclipse company representatives Rocky King -Bruce Carpenter and Ken Durst. H&P Drilling rig 608 on location and rigging up on the said well in anticipation of spudding the 17.5 diameter well bore. The total depth proposed is 1,550 for this section and 13.375 diameter casing will be set as the surface casing string. We reviewed the simultaneous operation pan regarding a producing well on location. The rig has a 134 fall radius established and the producing well has a cage erected over it along with concrete barriers around it. Muster areas are designated on the well pad with self contained breathing apparatuses at the muster points. Fire extinguishers are present at critical points across the location along with emergency shut down devices to control the producing well. The well pad perimeter berm is of earthen material and the perimeter drains are in the closed position. The company has indicated that any surface water will be recovered during the drilling and completion process.
1397675118 2019-01-28 Completion Testing No Violations On site inspection found the well drilling and completion process now complete and the well bore total depth drilled and 5.5 diameter casing set to 26,255. Proceeding the last stage stimulated kill plugs were set inside the 5.5 diameter casing to isolate the well bore at depths of 10,170 and 10,260. The company is monitoring the well bore A&B well section pressures daily with zero pressure reported on either annular pressure. A snubbing unit style workover rig owned by Deep Well Services is on location and rigged up on the # 2-H well on the pad. The unit is drilling out the completion plugs on the #2-H well and will complete all 3 wells recently drilled before moving off location.
1532354824 2018-07-23 Drill / Deepen / Reopen No Violations The said well was spudded on 07/20/2018 by Precision Rat Hole Services with 120 of 24 diameter conductor being set and cemented on 07/21/2018 . A 16 diameter mousehole was also set inside the cellar.
1534345798 2018-08-15 Drill / Deepen / Reopen No Violations
1748740848 2018-08-09 Drill / Deepen / Reopen No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. We met with Eclipse representatives Bruce Carpenter, Rocky King, and Kenny Durst to review the layout of the pad and the SIMOPS procedure, due to an existing producing well on the pad (permit number 2-4766). The H&P FlexRig 608 rig is currently rigging up and preparing to spud the 17.5 inch diameter surface borehole within the next 24 hours.

For data sources see[10]

References