X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-067-21096"

m
m
Line 15: Line 15:
 
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
|-
 
|-
| Well Pad ID: [[000449]]
+
| Well Pad ID: [[US-OH-000449]]
 
|-
 
|-
 
| Farm/Lease Name: BOY SCOUT
 
| Farm/Lease Name: BOY SCOUT
Line 21: Line 21:
 
| License Status: Producing
 
| License Status: Producing
 
|-
 
|-
| License Date: 2013-10-04
+
| License Date: 2013-02-01
 
|-
 
|-
 
| Spud Date: 2013-02-03
 
| Spud Date: 2013-02-03

Revision as of 02:03, 26 July 2019

Well Details

Well ID: 34-067-21096
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Nottingham Township
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID: US-OH-000449
Farm/Lease Name: BOY SCOUT
License Status: Producing
License Date: 2013-02-01
Spud Date: 2013-02-03
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2013-04-27
Well Total Depth: 16277 ft
Configuration: Horizontal
Latitude: 40.258245924
Longitude: -81.21467676

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-09-21 Proposed Formations:POINT PLEASANT, Issued Date:9/21/2012, Expired Date:9/21/2014 12:00:00 PM, Drilling unit acres:1163.98, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-01-03 Proposed Formations:POINT PLEASANT, Issued Date:1/3/2013, Expired Date:1/3/2015 12:00:00 PM, Drilling unit acres:1163.983, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-02-01 Proposed Formations:POINT PLEASANT, Issued Date:2/1/2013, Expired Date:2/1/2015 12:00:00 PM, Drilling unit acres:1163.983, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-04-27
Completion Report Received 2013-09-03
Correction to Well 2013-10-11 CHANGE IN TARGET & TAKE-POINT INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2015-02-01
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/14/2013 05/23/2013 7676.81 10,303,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SI 9400 Stingray Scale Inhibitor Water 7732-18-5 60 0.00431 0
Organic Acid mixture NA 40 0.00287 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 0 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 1.014 0
Clean Gel Stingray Guar Gel heavy aliphatic NA 35 0.05667 0
Solvent naphtha, (petroleum) 64742-96-7 65 0.10525 0
OB-2 Stingray Breaker Cured acrylic resin NA 16 0.0022 0
Ammonium persulfate 7727-54-0 75 0.01032 0
Silica, Crystalline-Quartz 14808-60-7 10 0.00138 0
30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 16.1175 0
NE 11 Stingray Non-Emulsifier Ethylene/Propylene NA 50 0.0203 0
Oxide Polymer NA 50 0.0203 0
Acid Inhibitor Stingray Corossion Inhibitor water 7732-18-5 40 0.00027 0
Proprietary polycarboxylic acid mixture NA 60 0.00041 0
Bellacide 355 BWA Biocide Water 7732-18-5 90 0.01837 0
Tributyltetradecyl phosphonium chloride 81741-28-8 10 0.00204 0
Per Break Stingray Breaker Ammonium Persulfate 7727-54-0 99 0.01363 0
Fresh water Stingray Carrier Water 7732-18-5 100 82.1186 0
AI/IC 8600 Stingray Acid Hydrochloric Acid NA 60 0.26753 0
Water 7732-18-5 40 0.17836 0
FR-A 1000 Stingray Friction Reducer Water 7732-18-5 75 0.03425 0
Petroleum Distillates, hydrotreated light 64742-47-8 25 0.01142 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-05-17 H2O 15 257082 Gal 519140 STINGRAY PRESSURE PUMPING LLC STAGE 11

60 SHOTS

2013-05-18 H2O 15 311850 Gal 541992 STINGRAY PRESSURE PUMPING LLC STAGE 13

60 SHOTS

2013-05-18 H2O 15 305844 Gal 526280 STINGRAY PRESSURE PUMPING LLC STAGE 15

60 SHOTS

2013-05-21 H2O 15 235872 Gal 528300 STINGRAY PRESSURE PUMPING LLC STAGE 33

60 SHOTS

2013-05-20 H2O 15 297864 Gal 524522 STINGRAY PRESSURE PUMPING LLC STAGE 26

60 SHOTS

2013-05-14 H2O 15 250488 Gal 5043600 STINGRAY PRESSURE PUMPING LLC STAGE 1

60 SHOTS

2013-05-21 H2O 15 243810 Gal 529000 STINGRAY PRESSURE PUMPING LLC STAGE 28

60 SHOTS

2013-05-20 H2O 15 285096 Gal 522692 STINGRAY PRESSURE PUMPING LLC STAGE 25

60 SHOTS

2016-05-21 H2O 15 402990 Gal 527200 STINGRAY PRESSURE PUMPING LLC STAGE 32

60 SHOTS

2013-05-15 H2O 15 266028 Gal 529000 STINGRAY PRESSURE PUMPING LLC STAGE 6

60 SHOTS

2013-05-16 H2O 15 306138 Gal 543250 STINGRAY PRESSURE PUMPING LLC STAGE 7

60 SHOTS

2013-05-22 H2O 15 267624 Gal 540140 STINGRAY PRESSURE PUMPING LLC STAGE 34

60 SHOTS

2013-05-20 H2O 15 281442 Gal 528105 STINGRAY PRESSURE PUMPING LLC STAGE 23

60 SHOTS

2013-05-17 H2O 15 312984 Gal 529028 STINGRAY PRESSURE PUMPING LLC STAGE 12

60 SHOTS

2013-05-19 H2O 15 305256 Gal 516693 STINGRAY PRESSURE PUMPING LLC STAGE 21

60 SHOTS

2013-05-18 H2O 15 310380 Gal 527842 STINGRAY PRESSURE PUMPING LLC STAGE 16

60 SHOTS

2013-05-19 H2O 15 314328 Gal 520564 STINGRAY PRESSURE PUMPING LLC STAGE 22

60 SHOTS

2013-05-17 H2O 15 271446 Gal 533276 STINGRAY PRESSURE PUMPING LLC STAGE 10

60 SHOTS

2013-05-16 H2O 15 300384 Gal 528792 STINGRAY PRESSURE PUMPING LLC STAGE 8

60 SHOTS

2013-05-14 H2O 15 271236 Gal 524850 STINGRAY PRESSURE PUMPING LLC STAGE 5

60 SHOTS

2013-05-18 H2O 15 267624 Gal 534060 STINGRAY PRESSURE PUMPING LLC STAGE 14

60 SHOTS

2013-05-14 H2O 15 457338 Gal 518000 STINGRAY PRESSURE PUMPING LLC STAGE 2

60 SHOTS

2013-05-18 H2O 15 315420 Gal 522733 STINGRAY PRESSURE PUMPING LLC STAGE 17

60 SHOTS

2013-05-14 H2O 15 294672 Gal 507000 STINGRAY PRESSURE PUMPING LLC STAGE 3

60 SHOTS

2013-05-21 H2O 15 311640 Gal 531830 STINGRAY PRESSURE PUMPING LLC STAGE 31

60 SHOTS

2013-05-19 H2O 15 240303 Gal 544649 STINGRAY PRESSURE PUMPING LLC STAGE 19

60 SHOTS

2013-05-21 H2O 15 313950 Gal 521013 STINGRAY PRESSURE PUMPING LLC STAGE 30

60 SHOTS

2013-05-21 H2O 15 399798 Gal 552817 STINGRAY PRESSURE PUMPING LLC STAGE 29

60 SHOTS

2013-05-20 H2O 15 354858 Gal 538150 STINGRAY PRESSURE PUMPING LLC STAGE 24

60 SHOTS

2013-05-19 H2O 15 294630 Gal 555110 STINGRAY PRESSURE PUMPING LLC STAGE 18

60 SHOTS

2013-05-21 H2O 15 332388 Gal 524398 STINGRAY PRESSURE PUMPING LLC STAGE 27

60 SHOTS

2013-05-15 H2O 15 320922 Gal 518048 STINGRAY PRESSURE PUMPING LLC STAGE 4

60 SHOTS

2013-05-19 H2O 15 396436 Gal 510542 STINGRAY PRESSURE PUMPING LLC STAGE 20

60 SHOTS

2013-05-16 H2O 15 314622 Gal 521072 STINGRAY PRESSURE PUMPING LLC STAGE 9

60 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION 260559 67712 150
2014 GULFPORT ENERGY CORPORATION 357728 82732 339
2015 GULFPORT ENERGY CORPORATION 239733 25931 322
2016 GULFPORT ENERGY CORPORATION 156697 28117 327
2017 GULFPORT ENERGY CORPORATION 144310 21313 358
2018 GULFPORT ENERGY CORPORATION 121156 16843 360
2019 GULFPORT ENERGY CORPORATION 26779 3545 85

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION Brine 29113 150
2014 GULFPORT ENERGY CORPORATION Brine 3689 339
2015 GULFPORT ENERGY CORPORATION Brine 4927 322
2016 GULFPORT ENERGY CORPORATION Brine 3878 327
2017 GULFPORT ENERGY CORPORATION Brine 3631 358
2018 GULFPORT ENERGY CORPORATION Brine 3589 360
2019 GULFPORT ENERGY CORPORATION Brine 726 85

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0034137995 2013-09-30 Preliminary Restoration No Violations On the day of my inspection the well was in production and the site passed preliminary restoration according to 1509.072A.
0849269538 2016-03-07 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells on site are producing off of natural reservoir pressure. Permitted wells 34067211040000 and 34067211050000 have not been drilled. RBDMS indicated that the wells on site are in producing order.
The production equipment on the pad consists of the following:

14 400 bbl. Production tanks 4 Producing wells 4 Sand separators

4 Line heaters 1 compressor 1 Vapor recovery tower 1 combustor 1 30bbl. drip tank The site passed preliminary restoration in accordance with ORC 1509.072 A.

1298737560 2013-04-17 Casing String Witnessed No Violations I am on site today to witness the running and the cementing of the 9-5/8 inch diameter casing string. Patterson Drilling Rig # 480 drilled a 12-1/4 inch diameter hole to 6975 ft and will set casing at 6958 ft . Halliburton Cementing Service will cement casing with 480 sks lead on stage 1 at 14.2 and 490 sks of tail at 15.6 then wait 4 hours and set stage 2 with the DV Tool at 4081 ft and cement with a lead of 700 sks at 15.6 and tail of 300 sks of 14.4 I am on site because they are doing a Fit test prior to cementing this casing string. The fitness test will prove if the deep casing string is needed or if the casing program can be updated.
1324355924 2018-12-13 Production Wells No Violations On the day of my inspection I was accompanied by Deputy Chief Bob Worstall and Inspector John Fleming. This pad contains 4 properly labeled producing wellheads. Production equipment includes 5 400 barrel steel tanks in their own containment, four GPUs, 4 sand seperators, 4 vertical seperators, and a vapor recovery unit. Surface annular pressure is 150 and intermediate annular pressure is 70. Production records are current in RBDMS.
1361385432 2013-02-11 Drill / Deepen / Reopen No Violations Gulfport Energy has Yost Drilling on site to drill the Surface and the Intermediate casing section of this well. During my inspection I discovered that they had set 461 ft of 18-5/8 diameter casing. I ask if they had forgot to contact me for the casing cement job and was advised that they had contacted me. Phone records show yes they called to advise of the spud date but had no further contact. While inspecting the site I noticed that the drilling rig and the Producing well are very close to each other. I ask and was advised that the well was also in production at this time. I then contacted Deputy Chief Claus and advised him of my concern. Deputy Claus then advised me to shut the drilling rig down until some safety measures could be installed. I contacted Gulfport Energy and advised of the safety concern. The rig was then shut down and a meeting scheduled to review how things would progress.
1365609787 2013-04-10 Drill / Deepen / Reopen No Violations I arrived today to check on the rig move status. Patterson Drilling # 480 has moved over to this well which has conductor - surface and intermediate casing already set. They are testing the BOP before they knock out the bridge plug set at 1502 ft. The BOP test failed and they are making repairs and will test again later today. After the test passes they will begin drilling. They have added a device to connect to the production tankers. Now they can vent the gas generated while loading the tanker into the flare line and burn off the vapors. I advised that they check the safety burn back valve each time before they load to insure it is working correctly. The check valve is so that the flare line does not burn back to the tanker while filling.
1391096712 2014-01-29 Production Wells No Violations I am on site today to because Chris Anderson called me to inform me of a fire which occurred at the line heater. He said that the line heater caught fire after a gas leak which may have been caused by the pumper not shutting a valve while working on the heater. The fire was contained to the line heater and was put out by the pumper. The well was to be shut in until repairs are made. During my inspection I found that the heater is back in service and the well is back in operation. There is some heat staining on the side of the line heater which was in the fire but no other sign of a fire.
1406199285 2014-07-24 Production Wells Violations Noted I am on site tonight because of a spill which occurred due to line leak on the separator. It allowed condensate under pressure to spray a mist over an area 45 ft x 145 ft. The area affected is next to the production tanks and the fenced in area. The amount is approximately 5 barrels of condensate. Diapers have been put down to absorb any free fluid. The clean up crew will remove any contaminated rock or soil. The area outside of the fence has vegetation and it is to be cut with a weed eater and Bio Sorb put down. The Bio Sorb will be vacuumed up after it has absorbed what ever it can for an 8 hour period. Vegetation will be monitored and replaced if needed.
1406298623 2014-07-25 Production Wells No Violations I arrived today to check on the clean up of the 5 barrel condensate spill which occurred 07/24/2014. I found that the contaminated rock and soil has been removed and clean rock and soil put down and graded. The equipment removed to excavate under it has been put back in place and is being connected at the time of this inspection. None of the wells are in operation at this time and during the shut down period the sand valve which failed due to sand cutting has been checked on the remaining wells to insure it does not occur again.
1425096953 2013-02-14 Drill / Deepen / Reopen No Violations I am on site today because I received a call to inform that the rig was back to drilling before all of the safety measures have been installed. When I ask if they had been drilling I was advised that they had not drilled. I had counted the stands in the derrick and now there are 4 more. I contacted Chad Shoffner and he said that yes they are at 600 ft but that the information was incomplete. I told him I had counted the stands in the derrick and that he should be more open when ask such an easy question. He informed me that all of the safety measures would be in place before any drilling continues.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1406199285 US-OH-111964 2014-08-05 Well operation causing pollution and contamination

For data sources see[9]

References