If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 1964-12-11 |
|- | |- | ||
| Spud Date: 1965-01-07 | | Spud Date: 1965-01-07 |
Well ID: 34-031-21696 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.391563614,"lon":-81.97225807,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Clark Township | |
Operator Name: A MILLER OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: STOVER WILLIAM H | |
License Status: Producing | |
License Date: 1964-12-11 | |
Spud Date: 1965-01-07 | |
Spud Drilling Contractor: | |
Final Drill Date: 1965-02-25 | |
Well Total Depth: 800 ft | |
Configuration: Vertical | |
Latitude: 40.391563614 | |
Longitude: -81.97225807 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1965-01-07 | GL=813.2 |
Completed | 1965-02-25 | GL=813.2 |
Reached Total Depth | 1965-02-25 | GL=813.2 |
CO | 1991-04-09 | 1453 GREEN ENERGY INC |
CO | 1993-06-23 | 1890 MILLER A OIL CO GeoDate |
Record Last Modified | 2013-10-03 | GL=813.2 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 758 | 776 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 60 Qts | 0 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | MELANIE OIL DRIL USA INC | Brine | 350 | 365 |
1987 | MELANIE OIL DRIL USA INC | Brine | 250 | 365 |
1988 | MELANIE OIL DRIL USA INC | Brine | 126 | 365 |
1989 | MELANIE OIL DRIL USA INC | Brine | 282 | 365 |
1990 | GREEN ENERGY INC | Brine | 86 | 153 |
1991 | A MILLER OIL COMPANY | Brine | 130 | 104 |
1992 | A MILLER OIL COMPANY | Brine | 444 | 365 |
1993 | A MILLER OIL COMPANY | Brine | 423 | 365 |
1994 | A MILLER OIL COMPANY | Brine | 340 | 365 |
1995 | A MILLER OIL COMPANY | Brine | 281 | 365 |
1996 | A MILLER OIL COMPANY | Brine | 640 | 365 |
1997 | A MILLER OIL COMPANY | Brine | 110 | 365 |
1998 | A MILLER OIL COMPANY | Brine | 424 | 365 |
1999 | A MILLER OIL COMPANY | Brine | 414 | 365 |
2000 | A MILLER OIL COMPANY | Brine | 564 | 305 |
2001 | A MILLER OIL COMPANY | Brine | 260 | 365 |
2002 | A MILLER OIL COMPANY | Brine | 463 | 300 |
2003 | A MILLER OIL COMPANY | Brine | 255 | 265 |
2004 | A MILLER OIL COMPANY | Brine | 270 | 365 |
2005 | A MILLER OIL COMPANY | Brine | 192 | 365 |
2006 | A MILLER OIL COMPANY | Brine | 317 | 365 |
2007 | A MILLER OIL COMPANY | Brine | 333 | 365 |
2008 | A MILLER OIL COMPANY | Brine | 310 | 365 |
2009 | A MILLER OIL COMPANY | Brine | 317 | 365 |
2010 | A MILLER OIL COMPANY | Brine | 26 | 365 |
2011 | A MILLER OIL COMPANY | Brine | 225 | |
2012 | A MILLER OIL COMPANY | Brine | 337 | 366 |
2013 | A MILLER OIL COMPANY | Brine | 238 | 365 |
2014 | A MILLER OIL COMPANY | Brine | 150 | 365 |
2015 | A MILLER OIL COMPANY | Brine | 225 | 180 |
2016 | A MILLER OIL COMPANY | Brine | 295 | 180 |
2017 | A MILLER OIL COMPANY | Brine | 295 | 180 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0096599203 | 2014-11-04 | Production Wells | No Violations | Inspection revealed that fluid level on annulus of the tubing remains the same as last year. |
0115253986 | 2007-08-15 | Enhanced Recovery Project | No Violations | Echo meter test for fluid level in well . |
0221507821 | 2004-08-20 | Enhanced Recovery Project | No Violations | TESTED 100# DEEP COLLAR CLINTON WELL |
0335127753 | 2016-01-07 | Production Wells | No Violations | On the day of my inspection I found that the wellhead was equipped with a pumping unit. The electric motor was intact and the polished rod showed signs of recent use. The gauge showed 20 psi on the tubing. The tank battery consisted of one 100 barrel steel tank, one 100 barrel poly tank and an earthen dike. Identification was posted and I found no leaks or spills. The tank battery is shared with permit 1692. |
0442190966 | 2017-04-26 | Production Wells | No Violations | Inspection revealed that fluid levels were slightly higher than last test suggested that they replace cups on downhole pump.
Gave them time line of 5/24/17 to get repairs made to downhole pump and we will retest well at later date. |
0689075488 | 2003-12-16 | Production Wells | No Violations | Well in production . |
0819375685 | 2011-05-09 | Enhanced Recovery Project | No Violations | Echo meter test. |
0968240043 | 2016-01-28 | Production Wells | No Violations | On site to witness Echo metering test on well too confirm fluid level on annuli of tubing on this well it was noted 60 higher than the last inspection performed in 11/4/14. |
1282263826 | 2012-12-14 | Production Wells | No Violations | On the day of my inspection I found that the well head was equipped with a pumping unit and connected to a tank battery that consisted of one 100 barrel stock tank, one 100 barrel brine tank, one knock-out tank and an earthen dike. Proper identification was posted and there were no leaks or spills at the well head or tank battery. This well shares a tank battery with permit 1692. No violations at this time. |
1856594184 | 2016-01-28 | Enhanced Recovery Project | No Violations | On the day of my inspection I met U.I.C. inspector Dave Ball to witness the annual echo meter test. We found that the fluid was 60 higher than the previous test on 11/4/14. This well will be re-tested in a month. |
1962584569 | 2013-01-03 | Production Wells | No Violations | On site to witness fluid level testing with echo meter along with well owner and tester Jim Gessel. |
2077529634 | 2005-12-16 | Enhanced Recovery Project | No Violations | Witnessed shooting of ecometer by Jim Gessel of Dome Drilling for static fluid test w/ J Fry. |
2097076377 | 2017-12-20 | Production Wells | No Violations | On the day of my inspection I found that the well was equipped with an electric powered pumping unit. The motor, drive belts and electric were intact. The flow lines were connected at the wellhead and the valves were open. The production equipment consisted of one 100 barrel steel tank and one 100 barrel poly tank in an earthen containment dike. Correct, legible identification was posted at the wellhead and the tanks. I found no leaks or spills around the wellhead or tanks. |
2120887507 | 2018-11-07 | Production Wells | No Violations | On site today to witness echo meter testing of well, fluid level in well was noted slightly lower than last year.
|
For data sources see[9]