If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 2014- | + | | License Date: 2014-01-28 |
|- | |- | ||
| Spud Date: 2014-06-10 | | Spud Date: 2014-06-10 |
Well ID: 34-151-25853 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.808817906,"lon":-81.15604814,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Paris Township | |
Operator Name: C & T ENERGY OF EAST CANTON IN | |
Well Pad ID: | |
Farm/Lease Name: HOSMER UNIT | |
License Status: Producing | |
License Date: 2014-01-28 | |
Spud Date: 2014-06-10 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2014-06-16 | |
Well Total Depth: 5499 ft | |
Configuration: Vertical | |
Latitude: 40.808817906 | |
Longitude: -81.15604814 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-01-28 | Proposed Formations:CLINTON, Issued Date:1/28/2014, Expired Date:1/28/2016 12:00:00 PM, Drilling unit acres:47.35, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-06-16 | |
Completion Report Received | 2014-09-08 | |
Construction Permit Expires | 2016-01-28 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-09-09 | 5283 | 5366 | 73 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-06-26 | H2O | 8 | 131000 Gal | 65000 | OTHER | Nabors Completion Services |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | C & T ENERGY OF EAST CANTON IN | 337 | 1099 | 161 |
2015 | C & T ENERGY OF EAST CANTON IN | 1974 | 1711 | 365 |
2016 | C & T ENERGY OF EAST CANTON IN | 1336 | 1156 | 365 |
2017 | C & T ENERGY OF EAST CANTON IN | 774 | 1046 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | 662 | 862 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | C & T ENERGY OF EAST CANTON IN | Brine | 3225 | 161 |
2015 | C & T ENERGY OF EAST CANTON IN | Brine | 980 | 365 |
2016 | C & T ENERGY OF EAST CANTON IN | Brine | 420 | 365 |
2017 | C & T ENERGY OF EAST CANTON IN | Brine | 350 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | Brine | 210 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1402681491 | 2014-06-11 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 11.75 43# Limited Service casing installed to 598. A 14.75 hole was drilled with a PDC bit to 622. There was an issue installing the casing into the hole. At the 2nd joint of casing around 38 in the ground the casing would no longer fall into the hole. The casing was attempted to be worked into the hole but it got stuck on a ledge and would no longer move. It was decided that the casing be brought out of the hole and laid down. Advent Drilling ran back into the hole with a 14.75 trichone bit to ream the hole to bottom and eliminate the ledges present in the hole. After the bit run the casing was then installed into the hole again and was able to reach bottom. Petroset was on location to cement the casing and circulated the well before pumping cement. They pumped 400sks of Class A cement with 3% CaCl. The well circulated the entire job during cementing and a total of 9 bbls of cement were returned to surface. There are no violations at this time. |
1542814947 | 2018-11-21 | Preliminary Restoration | No Violations | My inspection found the pits have been filled and the land restored around the well and tank battery locations. There are no signs of active erosion at either location. The preliminary restoration is compliant with Ohio Revised Code 1509.072(A). The preliminary restoration is passed. The well is equipped with a pumpjack with a domestic gas connection. The tank battery consists of a steel production tank, a steel brine tank, a vertical separator and a meter. The well is legibly identified. No compliance issues are cited. |
1851052093 | 2014-06-10 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of Advent drilling. The rig is currently drilling on fresh water mud at 190. The surface casing is not going to be set at the 750 on the permit, but instead will be set at 600. The Big Injun formation will have a bottom of around 450 and the offset wells and logs in the area show 600 as being 50 below the base of any freshwater. The erosion controls on location are installed properly and working properly to prevent sedimentation from entering the creek behind the well. There are no violations at this time. |
For data sources see[9]