If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Cuyahoga_County,_Ohio|Cuyahoga]] | | County: [[Cuyahoga_County,_Ohio|Cuyahoga]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Lyndhurst City,_Cuyahoga_County,_Ohio|Lyndhurst City]] |
|- | |- | ||
| Operator Name: [[BASS ENERGY CO INC]] | | Operator Name: [[BASS ENERGY CO INC]] | ||
Line 33: | Line 33: | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Latitude: | + | | Latitude: <Latitude> |
|- | |- | ||
| Longitude: -81.48904929 | | Longitude: -81.48904929 |
Well ID: 34-035-21610 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.52348155,"lon":-81.48904929,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Cuyahoga | |
Municipality: Lyndhurst City | |
Operator Name: BASS ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF LYNDHURST UNIT | |
License Status: Producing | |
License Date: 1996-02-01 | |
Spud Date: 1996-03-28 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1996-04-02 | |
Well Total Depth: 3615 ft | |
Configuration: Vertical | |
Latitude: <Latitude> | |
Longitude: -81.48904929 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1996-02-01 | 1639 BASS ENERGY CO INC GeoDate 2/1/96 |
Oil and Gas | 1996-02-01 | Issued Date 2/1/96 Expired Date 1/31/97 Acres 0020208 Tool Type RTAF Proposed Formation ORSK/NWBG/CLNN Proposed Depth 03615 Proposed Drill Depth 03615 |
Original Spud | 1996-03-28 | |
Completed | 1996-04-02 | |
Reached Total Depth | 1996-04-02 | |
Completion Report Received | 1996-06-07 | |
Construction Permit Expires | 1997-01-31 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3408 | 3420 | 25 |
1997-06-29 | 3385 | 3457 | 0 |
2006-09-11 | 3454 | 3457 | 7 |
2006-09-11 | 3423 | 3432 | 19 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 150 Gal | 0 | FRAC W/1500 GAL WATER & 33M# SAND | ||
H2O | 0 | 1500 Gal | 33000 | & GEL |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | BASS ENERGY CO INC | 27067 | 445 | 122 |
1997 | BASS ENERGY CO INC | 52773 | 256 | 365 |
1998 | BASS ENERGY CO INC | 39250 | 171 | 365 |
1999 | BASS ENERGY CO INC | 33387 | 119 | 365 |
2000 | BASS ENERGY CO INC | 26174 | 227 | 365 |
2001 | BASS ENERGY CO INC | 27119 | 194 | 365 |
2002 | BASS ENERGY CO INC | 30469 | 66 | 365 |
2003 | BASS ENERGY CO INC | 22077 | 164 | 365 |
2004 | BASS ENERGY CO INC | 21926 | 251 | 365 |
2005 | BASS ENERGY CO INC | 21811 | 80 | 365 |
2006 | BASS ENERGY CO INC | 15728 | 91 | 365 |
2007 | BASS ENERGY CO INC | 20271 | 42 | 365 |
2008 | BASS ENERGY CO INC | 17830 | 131 | 365 |
2009 | BASS ENERGY CO INC | 17673 | 96 | 365 |
2010 | BASS ENERGY CO INC | 18849 | 62 | 365 |
2011 | BASS ENERGY CO INC | 17593 | 58 | 0 |
2012 | BASS ENERGY CO INC | 17418 | 52 | 366 |
2013 | BASS ENERGY CO INC | 15641 | 63 | 365 |
2014 | BASS ENERGY CO INC | 13877 | 43 | 365 |
2015 | BASS ENERGY CO INC | 11663 | 0 | 365 |
2016 | BASS ENERGY CO INC | 12189 | 0 | 365 |
2017 | BASS ENERGY CO INC | 11901 | 82 | 365 |
2018 | BASS ENERGY CO INC | 11834 | 56 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | BASS ENERGY CO INC | Brine | 455 | 122 |
1997 | BASS ENERGY CO INC | Brine | 557 | 365 |
1998 | BASS ENERGY CO INC | Brine | 467 | 365 |
1999 | BASS ENERGY CO INC | Brine | 307 | 365 |
2000 | BASS ENERGY CO INC | Brine | 259 | 365 |
2001 | BASS ENERGY CO INC | Brine | 123 | 365 |
2002 | BASS ENERGY CO INC | Brine | 215 | 365 |
2003 | BASS ENERGY CO INC | Brine | 149 | 365 |
2004 | BASS ENERGY CO INC | Brine | 227 | 365 |
2005 | BASS ENERGY CO INC | Brine | 124 | 365 |
2006 | BASS ENERGY CO INC | Brine | 118 | 365 |
2007 | BASS ENERGY CO INC | Brine | 38 | 365 |
2008 | BASS ENERGY CO INC | Brine | 21 | 365 |
2009 | BASS ENERGY CO INC | Brine | 118 | 365 |
2010 | BASS ENERGY CO INC | Brine | 123 | 365 |
2011 | BASS ENERGY CO INC | Brine | 123 | |
2012 | BASS ENERGY CO INC | Brine | 116 | 366 |
2013 | BASS ENERGY CO INC | Brine | 148 | 365 |
2014 | BASS ENERGY CO INC | Brine | 37 | 365 |
2015 | BASS ENERGY CO INC | Brine | 99 | 365 |
2016 | BASS ENERGY CO INC | Brine | 54 | 365 |
2017 | BASS ENERGY CO INC | Brine | 75 | 365 |
2018 | BASS ENERGY CO INC | Brine | 77 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000018029 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 3/4/97 INSPECTOR NORBERT LOWDER DATE 03/0419/97 DATA FROM OLD VAX INFO | |
0331654393 | 2017-05-23 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. At the time of this inspection, I observed the following: a wellhead with plunger-lift system located near the municipal pool on Parkview Drive and tank battery is separate board-on-board enclosures located adjacent to the city hall and maintenance buildings. The battery is shared with the #2-1679 well located near the maintenance garage. The load-lines were plugged, locked and secure. The tank lids were closed and sealed. There was secondary containment which was intact with dry interior and free from signs of spills or leakage. Spark arrestor, low-pressure relief valve, and carbon filter were present and well maintained. ID signage was present and complete. Areas around the wellhead were comprise of turf grass lawn. The battery is located at the edge of the driveway and parking area for the maintenance garage. I walked the areas surrounding the wellhead and battery and found no signs of impact or problems. |
1030104718 | 2013-01-14 | UrbanProduction Wells | No Violations | The production unit is comprised of the following elements: a tank battery with 2 140-barrel (BBL) tanks, a mechanical separator, and a wellhead valve assembly. A mechanical plunger lift is affixed to the wellhead valve assembly. The tank battery and the wellhead are enclosed in separate 6-foot enclosures. The well is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . HB 278 safety equipment is present. Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate. I did not observe any leaks, spills, or other signs of contamination. The gates are locked. The battery is shared with the #1679 Unit. |
1218326001 | 2015-03-04 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The well is located on park and community center property owned by the City of Lyndhurst on Parkview Dr. The battery is located behind the City of Lyndhurst Building Department. The wellhead plunger lift system and battery are in separate enclosures. The gates are secure and locked. Connections and fittings are secure and free from signs of leakage or problems. Process safety equipment is present. Load-outs are plugged and secure. Areas around the wellhead and battery are snow-covered at the time of this inspection. The battery is shared with the #2-1610 well which is accessed from Parkview Drive. I did not observe any evidence of impact relating to on-going production activity. |
1383112576 | 2004-07-07 | Production Wells | No Violations | |
1797086977 | 2011-12-22 | UrbanProduction Wells | No Violations | Urban production well inspection/status check. Inspection conducted and well is in compliance with 1501:9-9-05. Well shares a tank battery with 2-1679. |
1963756423 | 2004-08-09 | Production Wells | No Violations |
For data sources see[9]