If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 1998-05-15 |
|- | |- | ||
| Spud Date: 1998-10-01 | | Spud Date: 1998-10-01 |
Well ID: 34-155-23676 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.259206937,"lon":-80.8564624,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Warren | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: SCHOONOVER | |
License Status: Producing | |
License Date: 1998-05-15 | |
Spud Date: 1998-10-01 | |
Spud Drilling Contractor: ROSE RUN DRILLING | |
Final Drill Date: 1998-10-07 | |
Well Total Depth: 4700 ft | |
Configuration: Directional | |
Latitude: 41.259206937 | |
Longitude: -80.85646240 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1998-05-15 | 2816 P & S ENERGY INC Proposed Formation CLINTON Issued Date 5/15/98 Expired Date 5/15/99 6:00:00 AM |
Correction to Well | 1998-05-22 | TARGET LOCATION INFORMATION ADDED TO PERMIT: 805'NL & 225'EL OF LOT 11; X=2,452,300 AND Y=584,800; ELEVATION: 904. VARIANCE SHALL NOT EXCEED 5%. |
Original Spud | 1998-10-01 | VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%. |
Completed | 1998-10-07 | VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%. |
Reached Total Depth | 1998-10-07 | VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%. |
Completion Report Received | 1998-11-16 | VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%. |
Correction to Well | 1998-12-11 | CORRECT TARGET LOCATION: 800' NL & 515'WL OF LOT 11; TARGET X COORDINATE: 2,452,307 |
Construction Permit Expires | 1999-05-15 | VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%. |
Change of Owner | 2019-02-26 | Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-02-26 | VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1999-01-07 | 4428 | 4518 | 96 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 114500 Gal | 83300 | 300 GALLONS FE/HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | P & S ENERGY INC | 2999 | 160 | 365 |
1999 | P & S ENERGY INC | 48709 | 452 | 365 |
2000 | P & S ENERGY INC | 38858 | 157 | 365 |
2001 | P & S ENERGY INC | 25194 | 76 | 365 |
2002 | P & S ENERGY INC | 20697 | 74 | 365 |
2003 | P & S ENERGY INC | 18969 | 0 | 365 |
2004 | P & S ENERGY INC | 17730 | 78 | 365 |
2005 | P & S ENERGY INC | 14487 | 0 | 365 |
2006 | P & S ENERGY INC | 13513 | 69 | 365 |
2007 | P & S ENERGY INC | 11674 | 0 | 365 |
2008 | P & S ENERGY INC | 9264 | 46 | 295 |
2009 | P & S ENERGY INC | 10594 | 0 | 365 |
2010 | P & S ENERGY INC | 13705 | 61 | 365 |
2011 | P & S ENERGY INC | 14340 | 0 | 365 |
2012 | P & S ENERGY INC | 12778 | 0 | 366 |
2013 | P & S ENERGY INC | 11474 | 0 | 365 |
2014 | P & S ENERGY INC | 9608 | 0 | 365 |
2015 | P & S ENERGY INC | 8147 | 35 | 365 |
2016 | P & S ENERGY INC | 9140 | 0 | 365 |
2017 | P & S ENERGY INC | 10635 | 0 | 365 |
2018 | P & S ENERGY INC | 8722 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | P & S ENERGY INC | Brine | 191 | 365 |
1999 | P & S ENERGY INC | Brine | 112 | 365 |
2000 | P & S ENERGY INC | Brine | 0 | 365 |
2001 | P & S ENERGY INC | Brine | 52 | 365 |
2002 | P & S ENERGY INC | Brine | 0 | 365 |
2003 | P & S ENERGY INC | Brine | 0 | 365 |
2004 | P & S ENERGY INC | Brine | 0 | 365 |
2005 | P & S ENERGY INC | Brine | 0 | 365 |
2006 | P & S ENERGY INC | Brine | 0 | 365 |
2007 | P & S ENERGY INC | Brine | 0 | 365 |
2008 | P & S ENERGY INC | Brine | 1 | 295 |
2009 | P & S ENERGY INC | Brine | 0 | 365 |
2010 | P & S ENERGY INC | Brine | 0 | 365 |
2011 | P & S ENERGY INC | Brine | 0 | 365 |
2012 | P & S ENERGY INC | Brine | 0 | 366 |
2013 | P & S ENERGY INC | Brine | 0 | 365 |
2014 | P & S ENERGY INC | Brine | 0 | 365 |
2015 | P & S ENERGY INC | Brine | 61 | 365 |
2016 | P & S ENERGY INC | Brine | 0 | 365 |
2017 | P & S ENERGY INC | Brine | 0 | 365 |
2018 | P & S ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1349372592 | 2012-10-04 | UrbanProduction Wells | No Violations | I completed a production well inspection status check. My inspection found the well equipped with a plunger lift unit (rabbit) that was in good condition. The tank battery contained one, 100 barrel oil storage tanks, one, 50 barrel brine storage tank, a separators, and the proper identification. I noticed no visible spills or leaks. The lease road was in good condition. There are no violations at this time. |
1425381822 | 2015-02-24 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well was equipped with a plunger lift assembly. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank and a mechanical separator. A dike surrounded the tank battery. Identification signs were posted at the well and tank battery. Locked, chain link fences with barb wire surrounded the tank battery. There was a plug on the load line. The lease road was in stable condition. The well was placed into production prior to House Bill 278. |
2075347235 | 2004-02-26 | Preliminary Restoration | No Violations | Restoration approved . |
For data sources see[9]